Project: NewtonRV-14A     -     Entry

Jan 29, 2022 2.5 Elevator: prime trim tab skins and spar, rivet spar to lower skin Category: 9: Elevator
Going to set this part aside until it is time to bond the elevator foam ribs so I can hopefully use one batch of the pro seal.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.