I've got a choice on routing the wire bundles to the wings; via the hinge pin or via the lift strut.
While prepping the install of these 2 items, I spent time noodling which might work out better. Still undecided. Can also do part one way, and part the other.
Did drill inspection panel "Right D" to 5/16th for the OAT probe, installed it, and then removed/put in the wiring box for later.