Project: Star     -     Entry

Mar 22, 2024 3.95 ELT Finish up and Magnetometer Start Up Category: Avionics
Got the 90 degree RGB connector via Amazon and was able to easily for once finish up the install connections.
Moved on to the magnetometer installation. Easy but a bit tricky in terms of fitting it on a wing inspection plate and various interference points. Spent a lot of time measuring multiple times. Did have to drill out/remove one of the nut plates to get a cardinal alignment on right wing plate C.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.