Project: VeteransBuild     -     Entry

Apr 27, 2024 20 Day 89 Category: Controls
Several parts of the Veteran's Build Project saw progress this week. Plastic wingtips begun earlier were further fitted and clecoed in place. The plane was then moved in order to rearrange the chapter hangar so that the build table could be moved out and used for another project. When work resumed, the plastic rudder tip fairing was permanently riveted on. Rudder cables were also fabricated as well as new fairings for where the cables emerge from the fuselage. The fairings were an addition that the Zenith plans did not include. Both rudder cables were fitted, but the some strands of the right cable partially unwound as they tightened over the thimble on the rudder end. So that cable was cut off and a new cable will be installed next time.