Project: HMCRV12     -     Entry

Feb 22, 2023 3.5 More exciting photos of our work on the fuselage (+ rudder)! Category: Workshop
Picture 1: Back riveting the rudder.
Picture 2: Working on riveting flange bearings to the flaperon mixer bellcrank.
Picture 3: Installing brake lines.
Picture 4: Attaching the brake reservoir to the firewall. Working on riveting flange bearings to the flaperon mixer bellcrank.
Picture 5: Adjusting the countersink cage for the roll bar assembly.
Picture 6: Riveting F-12116 hinges to upper firewall assembly (Front) Attaching vent door handles (Middle) Riveting top edge of and match-drilling inside of rollbar assembly (Back).
Picture 7: Drilling out a bad rivet.
Picture 8: Dimpling the rudder stiffner.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.