Project: Utah-Jay     -     Entry

Dec 02, 2021 5 Door Formers Category: Fuselage
Drilled out the temporary rivets and removed the door formers. Drilled the tabs and them match drilled the tab holes to the formers. Countersunk the holes for flush riveting. Installed the formers with clecos and then riveted them in. There were some tight fits for the bucking bar, but I managed to get them all in. There were some that were drilled out and re-riveted to make them perfectly flush


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.