Project: Utah-Jay     -     Entry

Jan 05, 2022 7.5 Upper Doors Category: Fuselage
Fitted, drilled and cleco'ed both right and left upper doors. Outside front and rear were cut/mitered to match the top and bottom. Drilling and match drilled to match the inside window brace.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.