Project: Utah-Jay     -     Entry

Aug 12, 2022 2.5 Fitting of the skylights Category: Fuselage
I measured, measured, and measured, then…..

Yep today was skylight day. Right wide was perfect for width, but needed one trimming cut after the initial cut. Left side required two length trims, but both are fitted. It was surprisingly easier than I thought, I was expecting the worst with the compound curve.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.