Project: Utah-Jay     -     Entry

Nov 10, 2022 6.5 Prepped, Primed and reinstalled the boot cowl Category: Boot Cowl
Removed the plaster from the fitted boot cowl, used scotch bright as prep for the priming. Primed and then wet sanded with 600 grit to finish the priming process and prepare for the final painting. This was all about getting set for the panel installation.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.