EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Utah-Jay
- Entry
Date:
Aug 05, 2023
Hours:
1.5
Control Cables
Category: Engine
Description:
Yesterday I cut the firewall pass through for the Carb Heat cable, today I reattached the Throttle and Mixture, I measured and cut the Carb Heat cable, attached it. The carb heat cable needed a stand off on the bracket for the adel clamp.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.