Project: RV-7-Phoenix     -     Entry

Sep 27, 2022 6.0 Firewall work Category: Fuselage
Several tasked completed. The aileron bell crank came in so that is installed. The firewall is deburred, dimpled, countersunk and ready for riveting. I made a new doubler for the fuel pump and modified it for the throttle and carb heat pass through. I drilled the holes necessary for the brake reservoir, it will be installed later.