Project: RV-7-Phoenix     -     Entry

Mar 21, 2023 4 Fuselage work Category: Fuselage
Installed optional battery box on firewall. Installed J channels and ribs in the tail section for drilling. I leveled the fuselage and checked to ensure it was not twisted.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.