Project: Shermnator     -     Entry

Oct 31, 2022 6.5 Right Wing Prep Category: Wings
Finally done with Football officiating (well, I'd take an extra playoff game, but...) and back from business travel so back to the wings. I set the left wing aside so I can catch the right wing up and do the fuel tank while the pro-seal is still good.

I have the right wing pre-fit and have the leading edge assembled. This pic has the fuel tank on for drilling the z-brackets. Fuel tank is on the left end.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.