Project: Bovine-RV14A     -     Entry

Aug 02, 2023 1.5 Match drilling second spar cap for H-stab finished Category: Tail Feathers
This session involved repeating what I did last night and match drilling the remaining other spar car for the Horizontal Stabilizer. This was again done in two phases, with the drilling of the part that nests against the spar cap webbing first, and then deburring both surfaces, and match drilling the spar flange.

What's next? Match drilling the spar doubler against the spar.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.