Project: bbellamy     -     Entry

Aug 13, 2022 2.5 Avionics List and Power Distribution Category: Instrument Panel
Logged 12.9 hours and met the weekly requirement of working more than 12 hours for the week ending 8/13. I was in town Sunday, Monday, Tuesday and Wednesday so the requirement was 12 hours. I left town Thursday AM and returned Saturday around 4PM.

This evening I:
Reviewed the Stein avionics quote and compared prices to Garmin list. Reviewed proposed changes. Started work on response with list of questions and changes.

Reviewed Carl's power distribution power points, word docs, and email to understand it more fully. Reviewed PC-680, PC-625 and TCW capacity and size. Thought about power distribution strategy.

Unpacked grips for control sticks that I had ordered at Oshkosh and received today. See photo. Both have a hat switch for pitch and roll trim, a Push-to-talk switch and one other button. And the pilot grip has two other switches.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.