Project: bbellamy     -     Entry

Oct 08, 2022 5.5 Avionics and Electrical Category: Avionics
Met goals for another week. 26.1 hours which is more than the 21 hour commitment. Missed working on the project one day, but more than made up for it on other days.

Continued work on wiring spreadsheet and figured out final format for showing fuse sizes, max current and typical current. Searched through Van's docs, VAF and Ray Allen docs and FAQs to find flap and trim motor currents.

Searched through Garmin docs for CAN bus and wiring notes and summarized in wiring spreadsheet.

Sent quote request to Gigaflight CAN bus wire to see if they sell it cheaper than Aircraft Spruce ($6.50 per foot).

Inventoried single wire size and shielded wire already on hand. Found bags of ferrules and marked with AWG size. Made up 4 individual interconnect wires with ferrules and replaced the ribbon cable jumper and sent pictures to FlyLeds for comment. The ferrules are touching some of the power resistors.