Project: bbellamy     -     Entry

Jan 24, 2023 8.1 Avionics and Electrical Category: Avionics
Finished final review of Revision 1 of schematic and spreadsheet. Changed some colors and cleaned up the schematic some. Created PDFs to take to FedEx to print. Saved copies of all Revision 1 documents and started Revision 2 for any future changes.

Started work on on panel layout using SolidWorks. Created parts for the GSB 15 and K1 and K2 switches. Imported all the other Garmin and Van's Aircraft parts. Started creating top assembly. Discovered the hole in the center of the panel is not really in the center. See the attached prints for the initial rough layout.

Inspected and logged Mouser parts including 1)Otto K1 flap, SPST and SPDT. 2) Otto P3 pushbutton starter and horn. 3)And a few other parts.

Not included in the time: Trip to FedEx to use their large format printer to print revision 1 of the schematic.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.