Project: bbellamy     -     Entry

Feb 25, 2023 6.9 Avionics and Electrical Category: Avionics
Met weekly goal by working a total of 13.8 hours instead of the minimum of 13.5 hours.

Updated sample labels to use round corners. Found out the file formats I used for the panel layouts and labels wouldn't print. Converted files and figured out scaling. Printed layouts with G5 to the left and to the right of the centerline. Also printed labels. Cut up prints and sat in airplane to try various configurations. I decided I like the G5 on the left of centerline and continued to place switches in various locations. I included a picture of the one I liked.

Updated Solidworks G5, center stack and GDU locations to match the desired location.

Unpacked and inspected electrical parts order from B&C.

Downloaded and opened the solid model for the Clippard alternate static port.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.