Met goal for another week. Was not able to spend any extra time.
Continued comparison and updates to schematic and wire list. Finished up all connections except CAN and details on power distribution. Reviewed counts of fuses, grounds, switches and other panel items to confirm I am not missing anything on the panel design. Archived copy of the schematic and wire list.
Started detailed work on power distribution and loads and capacity in case of alternator failure in hopes of being able to eliminate the second TCW IBBS backup battery.