Project: bbellamy     -     Entry

Mar 26, 2024 4 Avionics and Wiring Category: Fuselage
Removed wiring and avionics from the structure behind the instrument panel in preparation for installing the forward top fuselage structure and skin on the fuselage. Added labels to some of the connectors. Added tie wraps to help protect wiring from GDU 460 mounting screws. Added Aircraft Spruce 05-00675, M22529/2-2R edge grommet to two places on the CO Detector and used Dow 3145 RTV to help secure the edge grommet. Took pictures to help me reassemble and document the avionics and wiring. Added some potentially helpful tools to the McMaster Cart.

Added notes about the parts used to install the GMU 11 to the maintenance manual. Added additional notes about avionics and wiring to the maintenance manual.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.