Project: nburkholder     -     Entry

Mar 24, 2024 3 Mount Lower Cowl Vertical Skybolt Flanges Category: Fuselage
Lay out the location for Skybolt fasteners on the left and right lower cowl vertical firewall attach points, clamp the flanges to the fuselage, and match drill to the vertical firewall rivet locations. Remove the flanges, deburr drilled holes, machine countersink the rivet attach holes and the Skybolt fastener holes, and remount the flanges to the vertical firewall.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.