Jan 17, 2024 6 Fuselage Doublers Category: Fuselage
I completed final fitting of Fuselage Doublers (75F10). All holes were drilled to A5 size as required. Additional holes were located in the field area of the parts per drawing. Rivet layout on plan was not very detailed so I positioned in accordance with drawing as best I could. I got right and left doublers positioned and all rivets pulled with exception of those necessary for internal panel mounting.

I begin began final fitting of internal baggage area panels which required some final trimming to properly position. During this effort I gouged the left side doubler to an extent that I may need to replace. I will have and A & P friend give his opinion.