Project: EAbel     -     Entry

Oct 02, 2022 5 Stick controls Category: Controls
Installed stick controls and hardware onto Fuse tabs. Rigged in line with aileron pulleys. Installed elevator bellcrank, push tube and rod end bearings. Requires adjustment.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.