Project: purdys     -     Entry

Jul 26, 2023 8 Miscellaneous assembly of fuselage parts Category: Fuselage
While I'm waiting for my landing gear and a few other items, I installed the bearings in the wing bell-cranks, assembled the control rod heim joints, and bushings. Cut, drilled, and built the flap handle, then installed the rest of the flap control system. Installed the throttle/mixture control, and the trim lever. Cut the 2" dia. tube that supports the folding wing , and installed the U-joints for the folding wing option, as well as locating the wing tripods on the sides of the fuse. Built the Control Box (still waiting for the 2 main bearings) and assembled the nylon stop, the bearings for the control stick, and attached all of the hardware so that it will be ready when I can install it. Built the tailwheel control, just need to re-mount the rudder to finish it.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.