Assembled the Right fuel tank, clecoed the ribs, and attached the stiffeners. Added the fuel pick-up, and associated plumbing. Same build-up on the Left tank. Will dissemble, de-burr, apply the sealant for all the ribs, fuel gauges, vents, and rivets this week.