Sep 27, 2023 1.8 EFRT 16-3-5 Steps 1-5 Category: Wings
Completed the shims prep work and riveted them in place, installed the VA-146 flange bearing. Got shipment of nuts and washers from aircraft spruce and was able to complete the sky design aftermarket aileron brackets as well as sizing the hole for the vent line bracket.