Project: pchang     -     Entry

Oct 21, 2023 4.5 ERFT; 16-3; 8-14 steps 1-6 Category: Wings
installed the aluminum vent line and the riveted the inboard ribs to attach those vent lines. Applied sealant.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.