Project: pchang     -     Entry

Dec 17, 2023 4.8 Sect 23 - 2 Steps 1-4 through Sect 23-3 steps 1-2 Category: Wings
While the right fuel tank is curing. I started fabrication of the two torque tubes. Primed and installed the nut and o ring to each tube. Also started work on the bellcrank pushrod by cutting them to length and fitting the AN490HT8P. Just need to prime the insides before final riveting.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.