Project: pchang     -     Entry

Jan 10, 2024 2.7 ERFT; 12-14; steps 1-6 Category: Wings
Installed the baffling and the z brackets on the right fuel tank. Sealed with Proseal and riveted everything together. The work was done in a span of two weeks. Next up is to seal test.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.