Project: JaxFirefly     -     Entry

Jul 17, 2023 2 Horizontals / Elevators Category: Empennage
Started cutting the materials to length for horizontal stabilizers and elevators. 7/8" tubes are now cut to length, as are all the hinges. Did get ahead of myself and cut the hinges for the flaperons but figured since I was cutting hinges that I might as well. An aluminum cutting blade for the "new to me" miter saw cuts pretty nice.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.