Prep work to start assembling horizontal stabilizers. Cut inner tubes to proper angle. Added internal sleeve for future hinge placement, and riveted in place per instructions. Drilled vertical hole not quite perfectly vertical for cable hold down for RH side; appears I can adjust for this down the road with washers.