EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N224KP
- Entry
Date:
Apr 07, 2024
Hours:
2
Tank
Category: Wings
Description:
Started fabrication of the main tanks. Installed the rivnuts to rib 2 as well as fittings. I am missing a set of AN6 90degree fittings, but should be able to add them as I'm building the tanks.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.