Project: JodelDH251     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
118     May 01, 2024 Com Antenna Wiring/Avionics 5 $0.00    6   
117     Apr 24, 2024 Tailwheel lift handle Empennage 10 $0.00    4   
116     Apr 05, 2024 Fuel filler cover Interior Finish 2 $0.00    2   
115     Mar 06, 2024 Wiring the wings Wiring/Avionics 15 $0.00    7   
114     Jan 22, 2024 Priming control surfaces Paint / Decals 3 $0.00    4   
113     Nov 01, 2023 Aileron, Rudder and Tailplane Fabric cover 10 $0.00    7   
112     Jun 14, 2023 Fairings Landing Gear 10 $0.00    7   
111     Mar 29, 2023 upholstery Seats 40 $0.00    12   
110     Mar 05, 2023 Panel mockup Wiring/Avionics 1 $0.00    1   
109     Feb 27, 2023 Side panels Interior Finish 10 $0.00    6   
108     Feb 09, 2023 Return line fittings Fuel System 10 $0.00    11   
107     Nov 27, 2022 upholstery Interior Finish 20 $0.00    8   
106     Oct 02, 2022 Autopilot servo mounting Controls 4 $0.00    8   
105     Oct 01, 2022 Cap strips Wings 10 $0.00    4   
104     Jul 01, 2022 Visit to AFS Wiring/Avionics $0.00    2   
103     Mar 23, 2022 Interior Trim Interior Finish 10 $0.00    22   
102     Feb 19, 2022 Air Vents Fuselage 4 $0.00    8   
101     Jan 24, 2022 Rear cockpit tunnel Interior Finish 6 $0.00    5   
100     Dec 17, 2021 Landing Light Lens Wings 8 $0.00    4   
99     Nov 13, 2021 Fabricate tail spring and mounting hardware Landing Gear 15 $0.00    8   
98     Oct 19, 2021 Cable Fairings Controls 6 $0.00    2   
97     Oct 19, 2021 Composite Panel Instrument Panel 10 $0.00    10   
96     May 01, 2021 Fabricate landing gear Landing Gear 50 $0.00    47   
95     Nov 22, 2020 Seat backs Seats 4 $0.00    2   
94     Oct 04, 2020 Priming Paint / Decals 10 $0.00    4   
93     Aug 22, 2020 Glassing the flaps Wings 4 $0.00    2   
92     Aug 14, 2020 Fiberglass Fuselage Fuselage 10 $0.00    4   
91     Aug 03, 2020 Glassing the fuselage Fuselage 4 $0.00    3   
90     Aug 02, 2020 Glassing the fuselage Fuselage 2 $0.00    2   
89     May 03, 2020 Toe brake system Controls 20 $0.00    14   
88     Jan 27, 2020 Control Sticks Controls 4 $0.00    4   
87     Nov 01, 2019 empenage Fairing Empennage 3 $0.00    1   
86     Oct 10, 2019 empenage Fairing Empennage 2 $0.00    2   
85     Sep 25, 2019 Empennage fairing Empennage 2 $0.00    1   
84     Sep 24, 2019 DH251 Research $0.00    4   
83     Sep 20, 2019 Empennage fairing Empennage 4 $0.00    1   
82     Aug 10, 2019 Fairing Empennage 6 $0.00    1   
81     Aug 04, 2019 Empenage Fairing Empennage 2 $0.00    1   
80     Jul 29, 2019 Fairing Empennage 4 $0.00    3   
79     Jun 30, 2019 fairing plug Empennage 3 $0.00    2   
78     Jun 20, 2019 Fairing plug Empennage 4 $0.00    1   
77     Jun 17, 2019 Empenage fairing plug Empennage 4 $0.00    1   
76     Jun 04, 2019 Foam plug for empenage fairing Empennage 3 $0.00    1   
75     May 25, 2019 Fuel Filler Fuel System 3 $0.00    3   
74     May 21, 2019 Adhars tray and close turtle deck Fuselage 5 $0.00    7   
73     May 09, 2019 Wing tanks Fuel System 30 $0.00    26   
72     Mar 23, 2018 Main Fuel Tank Fuel System 30 $0.00    21   
71     Nov 22, 2017 Turtle deck plywood Fuselage 5 $0.00    5   
70     Oct 25, 2017 Fabricate seats Seats 20 $0.00    12   
69     Jun 13, 2017 Doors Fuselage 20 $0.00    20   
68     Mar 11, 2017 Canopy frame Fuselage 15 $0.00    9   
67     Feb 22, 2017 Turtle deck plywood Fuselage 20 $0.00    14   
66     Jan 20, 2017 Access panel Fuselage 4 $0.00    5   
65     Jan 14, 2017 Install Vertical stabilizer Empennage 5 $0.00    11   
64     Dec 19, 2016 Refabricated some controls Controls 10 $0.00    7   
63     Nov 22, 2016 Finish wing Wings 30 $0.00    20   
62     Aug 31, 2016 Leading edge Wings 10 $0.00    9   
61     Aug 14, 2016 Landing light Wings 5 $0.00    10   
60     Jul 18, 2016 leading edge outer wing Wings $0.00    10   
59     Jun 20, 2016 Prep for leading edge Wings 20 $0.00    13   
58     Mar 31, 2016 Flap controls Wings 20 $0.00    23   
57     Feb 26, 2016 Wing tips, rib blocking Wings 10 $0.00    11   
56     Dec 28, 2015 Aerliron compression strut Wings 10 $0.00    7   
55     Dec 26, 2015 False spars crank brace Wings 10 $0.00    7   
54     Dec 08, 2015 Install Crank ribs Wings 10 $0.00    6   
53     Nov 15, 2015 Install main ribs Wings 20 $0.00    10   
52     Sep 07, 2015 #1 rib Wings 8 $0.00    10   
51     Jul 15, 2015 Wing attachment bolts Wings 10 $0.00    10   
50     May 03, 2015 Cockpit floor reenforcement Fuselage 3 $0.00    3   
49     Apr 17, 2015 Misc elements Controls 6 $0.00    7   
48     Apr 02, 2015 Rudder Pedals Controls 6 $0.00    11   
47     Mar 15, 2015 Control Sticks Controls 10 $0.00    16   
46     Feb 22, 2015 Trim Tab Empennage 15 $0.00    16   
45     Feb 20, 2015 Rudder Cable exits Empennage 2 $0.00    4   
44     Feb 20, 2015 Plywood Fuselage 10 $0.00    12   
43     Feb 15, 2015 Mass balance Fuselage 4 $0.00    4   
42     Jan 04, 2015 Tailplane Mass balance stop Empennage 3 $0.00    6   
41     Dec 13, 2014 Trim tab hinges and trailing edge Empennage 4 $0.00    8   
40     Dec 09, 2014 Trim mechanism Empennage 5 $0.00    9   
39     Nov 09, 2014 Spar plywood skin/finish Wings 20 $0.00    17   
38     Aug 24, 2014 Spar extensions/crank Wings 15 $0.00    9   
37     Aug 11, 2014 Main spar Wings 4 $0.00    6   
36     Jul 20, 2014 Spar extensions Wings 10 $0.00    7   
35     Jul 15, 2014 Diaphragms Wings 4 $0.00    4   
34     Jul 05, 2014 Upper spar beam Wings 10 $0.00    4   
33     May 24, 2014 spar diaphragms Wings 4 $0.00    3   
32     May 16, 2014 Lower spar beams Wings 4 $0.00    5   
31     Apr 30, 2014 Bottom spar skin Wings 10 $0.00    5   
30     Apr 08, 2014 More spar ibternal parts Wings 5 $0.00    2   
29     Apr 08, 2014 Spar Jig Wings 5 $0.00    4   
28     Apr 01, 2014 Spar beams Wings 10 $0.00    9   
27     Mar 05, 2014 Start Wing Spar Wings 15 $0.00    8   
26     Jan 30, 2014 Bottom skin Fuselage 8 $0.00    10   
25     Jan 23, 2014 Rear seat Fuselage 6 $0.00    4   
24     Jan 05, 2014 Tail plane Hardware Empennage 10 $0.00    10   
23     Dec 23, 2013 Upper braces and dash panel Fuselage 20 $0.00    18   
22     Nov 11, 2013 Cross stringers and braces Fuselage 15 $0.00    9   
21     Oct 24, 2013 fuselage assembly Fuselage 20 $0.00    11   
20     Oct 06, 2013 Fabricate the fuselage sides Fuselage 20 $0.00    14   
19     Jul 11, 2013 Bulkheads Wings 10 $0.00    6   
18     Jun 20, 2013 Ailerons Wings 15 $0.00    12   
17     May 07, 2013 Outer ribs Wings 20 $0.00    11   
16     Mar 28, 2013 Flaps Wings 10 $0.00    12   
15     Mar 10, 2013 Wing ribs Wings 8 $0.00    4   
14     Feb 27, 2013 Wing ribs Wings 30 $0.00    8   
13     Feb 01, 2013 Hangers Fuselage 5 $0.00    7   
12     Jan 22, 2013 Hangers Fuselage 14 $0.00    8   
11     Jan 20, 2013 Bulkheads Fuselage 4 $0.00    4   
10     Jan 17, 2013 Hangers Fuselage 10 $0.00    4   
9     Dec 29, 2012 Hangers Fuselage 5 $0.00    5   
8     Dec 18, 2012 Bulkheads Fuselage 5 $0.00    3   
7     Dec 18, 2012 Bulkheads Fuselage 4 $0.00    4   
6     Dec 10, 2012 Bulkheads Fuselage 4 $0.00    2   
5     Nov 25, 2012 Bulkheads Fuselage 10 $0.00    5   
4     Oct 26, 2012 Stabilator Empennage 40 $0.00    33   
3     Aug 26, 2012 Vertical Stabilizer Empennage 20 $0.00    20   
2     Jul 29, 2012 Fabricate Rudder Empennage 20 $0.00    12   
1     Jan 01, 2012 Shop tools Tools $0.00    18   
------------ -------------- -------------
Totals1201    $0.00    968   