Project: TerryS     -     Project Summary     - Optional PDF document function     - Multi-sectional PDF
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
526     May 04, 2024 Installed th3 prop baby! Propeller 5 $0.00    6   
525     May 02, 2024 fwd avionics accesspanels finished Fuselage 3 $0.00    3   
524     Apr 29, 2024 Transition Training! misc. 7.4 $0.00    4   
523     Apr 29, 2024 fwd access panels Fuselage 3 $0.00    5   
522     Apr 18, 2024 Crank Plug Engine 2 $0.00    2   
521     Apr 18, 2024 prop install logistics Propeller 2 $0.00    1   
520     Apr 17, 2024 Which tailwheel tire? Landing Gear 2 $0.00    2   
519     Apr 17, 2024 Rigged tailwheel steering Landing Gear 10 $0.00    4   
518     Apr 16, 2024 Installed rudder Empennage 7 $0.00    6   
517     Apr 11, 2024 panel placards Instrument Panel 10 $0.00    2   
516     Apr 11, 2024 Landing light lenses Lighting 2 $0.00    2   
515     Apr 03, 2024 data plate & N number Paint / Decals 1 $0.00    3   
514     Apr 03, 2024 rudder fairings Empennage 12 $0.00    4   
513     Apr 03, 2024 Rigged flaps Wings 8 $0.00    4   
512     Apr 01, 2024 Cleaned the hangar Workshop 6 $0.00    0   
511     Mar 29, 2024 Permanently installed wingtips Wings 3 $0.00    1   
510     Mar 24, 2024 wingtip prep Wings 2 $0.00    4   
509     Mar 24, 2024 riveted on h/s tips Empennage .5 $0.00    2   
508     Mar 23, 2024 Installed/rigged elevators Empennage 16 $0.00    9   
507     Mar 23, 2024 and even more empennage fairings Empennage 20 $0.00    8   
506     Mar 16, 2024 continued empennage fairings Empennage 10 $0.00    9   
505     Mar 13, 2024 empennage tip fairings Empennage 11 $0.00    6   
504     Mar 12, 2024 Empennage intersection fairings continued- & permanently installed VS & HS Empennage 16 $0.00    9   
503     Mar 04, 2024 worked on empennage fairing Empennage 4 $0.00    4   
502     Mar 02, 2024 fairing work Empennage 12 $0.00    6   
501     Mar 02, 2024 roll servo rigged Controls 4 $0.00    2   
500     Feb 27, 2024 Aileron system review. Controls 8 $0.00    1   
499     Feb 23, 2024 Installed and rigged ailerons Controls 9 $0.00    2   
498     Feb 21, 2024 Fuel sender wiring Fuselage 12 $0.00    2   
497     Feb 20, 2024 tightened all fuel fittings Fuel System 3 $0.00    3   
496     Feb 15, 2024 Finished up fuel tank install Fuel System 5 $0.00    3   
495     Feb 14, 2024 nav lights etc. Wings 30 $0.00    2   
494     Feb 08, 2024 landing lights Lighting 8 $0.00    5   
493     Feb 07, 2024 Installed OAT probe Fuselage 4 $0.00    2   
492     Feb 02, 2024 Un-stuck fwd access panels Fuselage 4 $0.00    1   
491     Feb 01, 2024 finished pulling wing wiring Wings 7 $0.00    5   
490     Jan 31, 2024 Pulled wing wiring Wings 4 $0.00    2   
489     Jan 29, 2024 Pitot tube installed Wings 8 $0.00    4   
488     Jan 03, 2024 Pitot mast Wings 4 $0.00    5   
487     Dec 23, 2023 SB-00036 rev3 Empennage 6 $0.00    5   
486     Dec 22, 2023 continued working on wings Wings 6 $0.00    4   
485     Dec 21, 2023 Installed wings Wings 3 $0.00    2   
484     Dec 19, 2023 Moved the airplane factory Workshop 30 $0.00    1   
483     Dec 06, 2023 Moving day!!! Fuselage 10 $0.00    3   
482     Dec 02, 2023 aileron tube boots Fuselage 1 $0.00    2   
481     Nov 19, 2023 Windscreen fairing done! Fuselage 20 $0.00    6   
480     Nov 14, 2023 wheel pant fiberglass shims. Landing Gear 3 $0.00    5   
479     Nov 14, 2023 windshield fairing continued Fuselage 20 $0.00    5   
478     Nov 08, 2023 Windscreen fairing Fuselage 20 $0.00    4   
477     Oct 25, 2023 Stowed battery charger pigtail Engine 1 $0.00    2   
476     Oct 25, 2023 More heat shields Engine 4 $0.00    5   
475     Oct 24, 2023 Bled brakes Landing Gear 3 $0.00    1   
474     Oct 21, 2023 Engine install wrap-up Engine 12 $0.00    4   
473     Oct 20, 2023 windscreen install continued/cowl brake line cleanup Fuselage 4 $0.00    4   
472     Oct 19, 2023 misc stuff Propeller 6 $0.00    4   
471     Oct 18, 2023 Exhaust heat shields/throttle cable fire sleeve Engine 5 $0.00    4   
470     Oct 18, 2023 Prop Cable Propeller 2 $0.00    5   
469     Oct 17, 2023 Heater Scat & Mag blast tubes Engine 6 $0.00    6   
468     Oct 16, 2023 Glued in Windscreen Fuselage 6 $0.00    6   
467     Oct 12, 2023 canopy handle Fuselage 5 $0.00    3   
466     Oct 11, 2023 Canopy skirt Fuselage 6 $0.00    4   
465     Oct 10, 2023 EGT probes and wiring Engine 6 $0.00    3   
464     Oct 08, 2023 ignition/spark plug leads Engine 12 $0.00    11   
463     Oct 05, 2023 baffles Engine 10 $0.00    1   
462     Oct 04, 2023 baffle rubbers Engine 6 $0.00    2   
461     Oct 04, 2023 finished canopy skirt Fuselage 12 $0.00    3   
460     Oct 03, 2023 fuselage vertical closeouts Fuselage 6 $0.00    2   
459     Sep 28, 2023 cowling oil door Fuselage 3 $0.00    1   
458     Sep 27, 2023 continued canopy skirt Fuselage 30 $0.00    7   
457     Sep 14, 2023 canopy skirt Fuselage 5 $0.00    4   
456     Sep 13, 2023 More canopy skirt prep Fuselage 6 $0.00    3   
455     Sep 12, 2023 prep for canopy skirts Fuselage 6 $0.00    1   
454     Sep 12, 2023 sealed baffles Fuselage 2 $0.00    3   
453     Sep 11, 2023 oil door Fuselage 2 $0.00    2   
452     Sep 08, 2023 More cowl work- upper cooling ramps Fuselage 32 $0.00    8   
451     Aug 31, 2023 oil door Fuselage 4 $0.00    4   
450     Aug 29, 2023 started cowl oil door Fuselage 2 $0.00    3   
449     Aug 28, 2023 reshaped l/h cowl inlet Fuselage 4 $0.00    2   
448     Aug 25, 2023 Cowl work Engine 24 $0.00    9   
447     Aug 10, 2023 Engine air dehydrator- aka "the device" Tools 12 $0.00    3   
446     Aug 09, 2023 rework baffle ramp inner sides Engine 12 $0.00    4   
445     Jul 27, 2023 cowl/baffle interface. Fuselage 6 $0.00    3   
444     Jul 26, 2023 spark plug wires Engine 3 $0.00    2   
443     Jul 26, 2023 Alt inlet air Engine 4 $0.00    3   
442     Jul 25, 2023 Crankcase breather, sniffle valve, fuel pump drain Engine 9 $0.00    7   
441     Jul 24, 2023 Exhaust hangers Engine 6 $0.00    7   
440     Jul 17, 2023 exhaust Engine 4 $0.00    2   
439     Jul 17, 2023 Center cabin vertical closeouts Fuselage 3 $0.00    1   
438     Jul 17, 2023 Alt air Engine 2 $0.00    3   
437     Jul 14, 2023 More snorkel and baffle work Engine 10 $0.00    2   
436     Jul 14, 2023 Snorkel & Baffles Engine 10 $0.00    7   
435     Jul 12, 2023 Oil Cooler butterfly rework Engine 8 $0.00    3   
434     Jul 11, 2023 Worked on baffles Engine 20 $0.00    6   
433     Jul 10, 2023 baffles Engine 24 $0.00    5   
432     Jun 30, 2023 baffles Engine 18 $0.00    3   
431     Jun 28, 2023 Misc Fuselage 6 $0.00    2   
430     Jun 18, 2023 Wretched Cowling pt V Fuselage 6 $0.00    6   
429     Jun 15, 2023 Wretched cowl IV Fuselage 10 $0.00    7   
428     Jun 14, 2023 Wretched cowl III Fuselage 7 $0.00    4   
427     Jun 13, 2023 Wretched cowling II Fuselage 14 $0.00    5   
426     Jun 07, 2023 wretched engine cowling Fuselage 30 $0.00    8   
425     Jun 04, 2023 Avionics access panels Fuselage 6 $0.00    2   
424     May 30, 2023 finished fwd fuselage skin Fuselage 3 $0.00    0   
423     May 30, 2023 finished riveting fwd fuselage skin Fuselage 3 $0.00    2   
422     May 22, 2023 yet more fwd skin riveting Fuselage 5 $0.00    3   
421     May 20, 2023 continued riveting fwd upper skin Fuselage 4 $0.00    4   
420     May 18, 2023 fwd fuselage access panels Fuselage 4 $0.00    1   
419     May 16, 2023 inspection peepholes Fuselage 2 $0.00    1   
418     May 16, 2023 started riveting fwd top skin Fuselage 3 $0.00    1   
417     May 12, 2023 sealed firewall passthroughs and tidies up a couple of other things Fuselage 4 $0.00    3   
416     May 12, 2023 fabricated the inner canopy skirt braces Fuselage 3 $0.00    1   
415     May 10, 2023 Pitot Static leak check Avionics 8 $0.00    3   
414     May 05, 2023 Prop Governor cable Propeller 4 $0.00    1   
413     Apr 26, 2023 pre-closeup inspection misc. 3 $0.00    1   
412     Apr 26, 2023 cleaned up the shop Workshop 4 $0.00    0   
411     Apr 25, 2023 breather tube and fuel pump bypass hose Engine 4 $0.00    5   
410     Apr 22, 2023 Installed prop governor Propeller 6 $0.00    5   
409     Apr 19, 2023 birds in hangar :( Workshop 4 $0.00    1   
408     Apr 14, 2023 led lighting, relocated brake line, random stuff misc. 10 $0.00    6   
407     Apr 05, 2023 Alt air control cable Engine 1 $0.00    3   
406     Apr 05, 2023 Engine breather Engine 6 $0.00    2   
405     Apr 04, 2023 firewall patch Engine 3 $0.00    2   
404     Apr 01, 2023 engine wiring almost wrapped up Engine 30 $0.00    8   
403     Mar 21, 2023 Reference data - Fuel and oil hose lengths Engine $0.00    1   
402     Mar 21, 2023 fuel and oil plumbing Engine 8 $0.00    6   
401     Mar 21, 2023 starboard side plumbing and wiring Engine 16 $0.00    3   
400     Mar 09, 2023 couple of odd jobs Engine 6 $0.00    5   
399     Mar 06, 2023 fuel line plumbing Engine 40 $0.00    5   
398     Feb 24, 2023 sniffle valve and engine control cables Engine 12 $0.00    6   
397     Feb 22, 2023 started installing engine sensors Engine 7 $0.00    5   
396     Feb 21, 2023 Engine control cables Controls 4 $0.00    3   
395     Feb 21, 2023 FWF wiring Engine 4 $0.00    1   
394     Feb 15, 2023 Oil cooler part Deux Engine 40 $0.00    6   
393     Jan 31, 2023 cable brackets & oil cooler lines Engine 10 $0.00    6   
392     Jan 04, 2023 Engine control cables Engine 8 $0.00    4   
391     Dec 25, 2022 prelim fit fuel controller - planning rigging Engine 8 $0.00    6   
390     Dec 17, 2022 Hung the engine Engine 6 $0.00    7   
389     Dec 14, 2022 MLG wheel pants Landing Gear 28 $0.00    9   
388     Dec 07, 2022 MLG Leg fairings Landing Gear 6 $0.00    4   
387     Dec 01, 2022 Nav Lights Lighting 4 $0.00    2   
386     Nov 14, 2022 oil cooler Engine 1 $0.00    3   
385     Nov 12, 2022 cooling fan & gps antenna layout Fuselage 2 $0.00    2   
384     Nov 04, 2022 Cowling exit bump mk1 Engine 5 $0.00    4   
383     Nov 03, 2022 cleaned shop Workshop 6 $0.00    0   
382     Nov 01, 2022 Trimmed windshield Fuselage 16 $0.00    6   
381     Nov 01, 2022 canopy latch & mounting blocks Fuselage 2 $0.00    0   
380     Oct 28, 2022 brake lines in cabin Landing Gear 4 $0.00    6   
379     Oct 21, 2022 Installed brake calipers Landing Gear 4 $0.00    4   
378     Oct 20, 2022 installed main gear Landing Gear 6 $0.00    6   
377     Oct 17, 2022 installed tailwheel Landing Gear 3 $0.00    5   
376     Oct 17, 2022 dimpled fwd skin Fuselage 2 $0.00    1   
375     Oct 17, 2022 fuel selector and cabin fuel lines Fuel System 2 $0.00    2   
374     Oct 14, 2022 Moved wings to airport! Wings 8 $0.00    1   
373     Oct 14, 2022 Located hole for OAT probe and then moved wings to the hangar! Wings 1 $0.00    1   
372     Oct 13, 2022 finished wingtip nutplates and W-412 wingtip ribs Wings 5 $0.00    4   
371     Oct 12, 2022 root fairings, wingtips, LOTS of nutplates Wings 16 $0.00    6   
370     Oct 10, 2022 roll servo Avionics 1 $0.00    2   
369     Oct 07, 2022 wing tips and wing root fairings Wings 10 $0.00    2   
368     Oct 05, 2022 trial delrin stops + removed wings Wings 4 $0.00    3   
367     Oct 04, 2022 Aileron rigging. Wings 5 $0.00    5   
366     Oct 04, 2022 Aileron pushrod tubes Wings 3 $0.00    3   
365     Oct 02, 2022 Flap pushrod holes Wings 5 $0.00    3   
364     Sep 30, 2022 match drilled bottom skin overlap Wings 10 $0.00    4   
363     Sep 28, 2022 flap hinges, other minor tasks Wings 6 $0.00    2   
362     Sep 27, 2022 fwdtank attach bracket problem Wings 4 $0.00    2   
361     Sep 24, 2022 set angle of incidence Wings 10 $0.00    9   
360     Sep 24, 2022 aileron hardware stackup reference Controls 1 $0.00    4   
359     Sep 23, 2022 measuring for wing attach Wings 16 $0.00    5   
358     Sep 21, 2022 Installed wings for the first time Wings 10 $0.00    6   
357     Sep 17, 2022 wheels/tires & brake flanges Landing Gear 8 $0.00    5   
356     Sep 14, 2022 main power wire bundle permanently routed Firewall 6 $0.00    3   
355     Sep 13, 2022 firewall fwd work Firewall 8 $0.00    4   
354     Sep 12, 2022 firewall aft wiring & plumbing done! Avionics 20 $0.00    8   
353     Sep 08, 2022 pannel lights dim? Avionics 6 $0.00    1   
352     Sep 08, 2022 wired linkage for roll trim Avionics 1 $0.00    1   
351     Sep 07, 2022 Baggage compartment lights Lighting 2 $0.00    3   
350     Sep 07, 2022 flap motor and position sensor. Fuselage 24 $0.00    9   
349     Aug 29, 2022 brake lines in cabin Fuselage 4 $0.00    2   
348     Aug 29, 2022 Fuel boost pump Fuel System 5 $0.00    3   
347     Aug 24, 2022 fuel plumbing Fuselage 6 $0.00    3   
346     Aug 09, 2022 F-746 fwd engine control bracket/ boost pump cover Fuselage 8 $0.00    3   
345     Aug 04, 2022 pitot static lines Avionics 7 $0.00    4   
344     Aug 03, 2022 extra wiring passthrough Firewall 1 $0.00    1   
343     Aug 03, 2022 Seat heaters Interior Finish 12 $0.00    5   
342     Jul 23, 2022 mag switch wiring + Aux harness connectors Avionics 6 $0.00    3   
341     Jul 22, 2022 various stuff Avionics 18 $0.00    3   
340     Jul 01, 2022 Started Cabin Lighting Fuselage 4 $0.00    2   
339     Jun 29, 2022 ELT won't talk to Garmin PFD Avionics 20 $0.00    0   
338     Jun 27, 2022 Naca Vents Fuselage 1 $0.00    2   
337     Jun 27, 2022 Magnetometer GMU11 install Avionics 5 $0.00    2   
336     Jun 16, 2022 ELT wiring. Avionics 3 $0.00    3   
335     Jun 15, 2022 re-pinned audio panel connector Avionics 2 $0.00    1   
334     Jun 12, 2022 issue resolved Avionics 8 $0.00    2   
333     Jun 11, 2022 Wired pilot stick + troubleshooting Avionics 7 $0.00    1   
332     Jun 09, 2022 installed pitch servo, terminated can bus Avionics 7 $0.00    4   
331     Jun 07, 2022 Pilot Stick grip Avionics 6 $0.00    3   
330     Jun 07, 2022 audio panel pinout Avionics 9 $0.00    1   
329     Jun 07, 2022 Behold, it's alive! Avionics 9 $0.00    3   
328     Jun 02, 2022 panel switches done + other stuff Avionics 17 $0.00    5   
327     May 21, 2022 aileron servo, elevator bell crank, flyLED board, rudder links Avionics 5 $0.00    5   
326     May 20, 2022 floor rib repair Fuselage 2 $0.00    2   
325     May 19, 2022 more wiring... Avionics 24 $0.00    7   
324     May 11, 2022 wire bundles pt. 4 Avionics 12 $0.00    4   
323     May 03, 2022 more wiring Avionics 8 $0.00    1   
322     May 03, 2022 installed dimmer pots Lighting 1 $0.00    1   
321     May 02, 2022 brake line passthroughs Fuselage 1 $0.00    1   
320     May 02, 2022 Brake line supports, Nutplates etc. Avionics 3 $0.00    2   
319     Apr 23, 2022 avionics part..whatever Avionics 30 $0.00    3   
318     Apr 17, 2022 Voltage regulator & CO detector Avionics 5 $0.00    5   
317     Apr 14, 2022 brake plumbing Fuselage 6 $0.00    1   
316     Apr 14, 2022 wire bundles pt. 3 Avionics 3 $0.00    4   
315     Apr 13, 2022 Wire Bundles pt.2 Avionics 20 $0.00    6   
314     Apr 10, 2022 Garmin boxes installed + wire bundles pt.1 Avionics 30 $0.00    6   
313     Apr 05, 2022 modified layout Instrument Panel 3 $0.00    4   
312     Apr 04, 2022 supertracks finished, installed comm antennas Fuselage 4 $0.00    1   
311     Apr 02, 2022 Firewall odds and ends Firewall 5 $0.00    6   
310     Mar 31, 2022 Battery Cables + Forest of tabs Firewall 8 $0.00    4   
309     Mar 30, 2022 contactor diodes & first cable crimp Firewall 8 $0.00    2   
308     Mar 29, 2022 Cowl hinges & random fuselage stuff Fuselage 10 $0.00    4   
307     Mar 28, 2022 ADSB Antenna Fuselage 2 $0.00    2   
306     Mar 28, 2022 Supertrax Fuselage 7 $0.00    3   
305     Mar 27, 2022 oil cooler Firewall 8 $0.00    2   
304     Mar 24, 2022 parking brake valve Fuselage 10 $0.00    3   
303     Mar 23, 2022 rebuilt parking brake valve Fuselage 4 $0.00    2   
302     Mar 23, 2022 Contactors and ANL fuses Firewall 4 $0.00    1   
301     Mar 22, 2022 Contactors & battery box Firewall 6 $0.00    1   
300     Mar 21, 2022 Batt and Starter contractors + fuel passthru Firewall 4 $0.00    1   
299     Mar 19, 2022 Started BATT & Start contactor install Firewall 2 $0.00    2   
298     Mar 17, 2022 more instrument panel work Instrument Panel 10 $0.00    5   
297     Mar 05, 2022 Oil cooler Firewall 10 $0.00    3   
296     Mar 03, 2022 Panel layout Instrument Panel 6 $0.00    2   
295     Mar 02, 2022 more firewall stuff Firewall 24 $0.00    7   
294     Feb 28, 2022 panel cutouts and avionics racks Instrument Panel 18 $0.00    6   
293     Feb 22, 2022 panel cutouts and avionics racks Instrument Panel 16 $0.00    5   
292     Feb 08, 2022 Engine mount Fuselage 4 $0.00    3   
291     Jan 25, 2022 H/S tip fairings & Rudder lower fairing Empennage 16 $0.00    2   
290     Dec 17, 2021 more fairing work Empennage 6 $0.00    5   
289     Dec 15, 2021 elevator tips Empennage 3 $0.00    3   
288     Dec 15, 2021 ELT antenna Empennage 2 $0.00    1   
287     Dec 06, 2021 empennage intersection fairing Empennage 2 $0.00    1   
286     Dec 02, 2021 canopy latch & mounting blocks Fuselage 6 $0.00    5   
285     Nov 23, 2021 canopy continued. Fuselage 4 $0.00    3   
284     Nov 16, 2021 Engine Arrived Engine 1 $0.00    1   
283     Nov 16, 2021 Canopy continued. Fuselage 6 $0.00    2   
282     Nov 11, 2021 empennage lower fairings Fuselage 3 $0.00    4   
281     Nov 11, 2021 canopy continued. Fuselage 3 $0.00    1   
280     Nov 10, 2021 canopy continued. Fuselage 4 $0.00    4   
279     Nov 09, 2021 canopy continued. Fuselage 7 $0.00    6   
278     Nov 08, 2021 Avionics arrived! Avionics 3 $0.00    1   
277     Nov 08, 2021 canopy continued. Fuselage 5 $0.00    0   
276     Nov 07, 2021 canopy fit continued Fuselage 8 $0.00    4   
275     Oct 24, 2021 canopy trim continued Fuselage 4 $0.00    1   
274     Oct 22, 2021 Roll Bar installed Fuselage 3 $0.00    1   
273     Oct 22, 2021 The Big Cut Fuselage 4 $0.00    3   
272     Oct 20, 2021 first canopy cut Fuselage 8 $0.00    5   
271     Oct 15, 2021 Rudder stops Fuselage 4 $0.00    3   
270     Oct 12, 2021 Engine is shipping! Fuselage 2 $0.00    2   
269     Oct 12, 2021 slider rail Fuselage 3 $0.00    2   
268     Oct 11, 2021 canopy frame continued. Fuselage 6 $0.00    3   
267     Oct 10, 2021 canopy frame continued. Fuselage 9 $0.00    7   
266     Oct 05, 2021 Canopy frame Fuselage 9 $0.00    6   
265     Oct 05, 2021 windshield rollbar Fuselage 2 $0.00    1   
264     Sep 30, 2021 Control stick rigging & elevator pushrods Controls 7 $0.00    2   
263     Sep 29, 2021 rudder fitting Empennage 5 $0.00    7   
262     Sep 28, 2021 re-installed empennage for rigging etc. Empennage 2 $0.00    10   
261     Sep 27, 2021 Mounted Vertical Stabilizer Empennage 12 $0.00    12   
260     Sep 22, 2021 rigged elevators Empennage 8 $0.00    6   
259     Sep 21, 2021 Horizontal stab wrapped up Empennage 7 $0.00    4   
258     Sep 20, 2021 h/s continued Empennage 6 $0.00    2   
257     Sep 19, 2021 F-798 shims and fwd spar. Empennage 6 $0.00    1   
256     Sep 18, 2021 Started H/S installation Empennage 6 $0.00    8   
255     Sep 17, 2021 Drilled elevator horns Empennage 4 $0.00    5   
254     Sep 17, 2021 naca vents Fuselage 2 $0.00    3   
253     Sep 16, 2021 substructure reassembly + Naca vents Fuselage 6 $0.00    5   
252     Sep 15, 2021 more fwd deck stuff Fuselage 8 $0.00    7   
251     Sep 14, 2021 Fwd upper skin etc. Fuselage 7 $0.00    7   
250     Sep 13, 2021 Sub panel and fwd structure Fuselage 7 $0.00    8   
249     Sep 08, 2021 F-7103C-L&R Fuselage 1 $0.00    0   
248     Sep 07, 2021 F-7103C-L&R Fuselage 2 $0.00    2   
247     Sep 01, 2021 Fwd Upper deck & sub panel Fuselage 5 $0.00    5   
246     Aug 31, 2021 tank to selector fuel lines Fuel System 4 $0.00    2   
245     Aug 30, 2021 fuel vent lines Fuel System 5 $0.00    6   
244     Aug 24, 2021 Boost pump install & cover Fuel System 10 $0.00    5   
243     Aug 04, 2021 EFII fuel boost pump Fuel System 20 $0.00    3   
242     Jul 25, 2021 finished tailcone riveting Fuselage 1 $0.00    2   
241     Jul 23, 2021 Fuel boost pump Fuselage 4 $0.00    1   
240     Jul 22, 2021 seat belt anchors Fuselage 1 $0.00    2   
239     Jul 21, 2021 Fwd Upper tailcone skin Fuselage 7 $0.00    1   
238     Jul 19, 2021 Fwd upper tailcone skin Fuselage 4 $0.00    2   
237     Jul 17, 2021 Aft upper fuselage skin Fuselage 6 $0.00    1   
236     Jul 16, 2021 Fuel boost pump & ELT coax Fuselage 6 $0.00    2   
235     Jun 24, 2021 skins, elt mount etc. Fuselage 2 $0.00    1   
234     Jun 22, 2021 tailcone wire runs & static lines Fuselage 4 $0.00    1   
233     Jun 17, 2021 Fuse skins & random stuff continued Fuselage 10 $0.00    4   
232     Jun 07, 2021 Flap actuator assy Fuselage 5 $0.00    6   
231     Jun 04, 2021 Flap system Fuselage 2 $0.00    2   
230     Jun 03, 2021 Started working on flap system Fuselage 2 $0.00    2   
229     Jun 02, 2021 cabin tunnel cover, fuel valve cover Fuselage 7 $0.00    4   
228     Jun 01, 2021 Installed stick linkage, gussets, fwd floors Fuselage 6 $0.00    4   
227     May 26, 2021 Primed fwd floors, boot rings, & tunnel cover. Fuselage 3 $0.00    1   
226     May 25, 2021 Tunnel cover, Center cabin cover, & stick boot rings Fuselage 7 $0.00    6   
225     May 23, 2021 Nutplates, etc. Fuselage 3 $0.00    3   
224     May 14, 2021 Antenna Doubler Fuselage 4 $0.00    3   
223     May 13, 2021 Aft Seat pans Fuselage 5 $0.00    1   
222     May 12, 2021 Baggage bulkhead, tunnel cover, & fwd side panels Fuselage 8 $0.00    6   
221     May 11, 2021 Aft bulkhead work Fuselage 5 $0.00    0   
220     May 10, 2021 rudder cable fairings Fuselage 18 $0.00    6   
219     Apr 23, 2021 baggage floor conduit Fuselage 3 $0.00    1   
218     Apr 07, 2021 F-787 Stiffener & F-6111 skin reinforcing ribs Fuselage 6 $0.00    6   
217     Apr 06, 2021 F-786A Fuselage Stiffeners Fuselage 3 $0.00    2   
216     Apr 05, 2021 Aileron bellcrank & bulkhead gussets Fuselage 5 $0.00    6   
215     Mar 30, 2021 Fuselage decks, elevator bell crank support, baggage bulkhead, seat belt anchors Fuselage 6 $0.00    5   
214     Mar 29, 2021 Shop vertical enhancement devices Workshop 3 $0.00    1   
213     Mar 29, 2021 F-695 Gussets Fuselage 3 $0.00    4   
212     Mar 26, 2021 Work on the cockpit decks Fuselage 5 $0.00    4   
211     Mar 25, 2021 seatback crossbar, gussets, cockpit decks Fuselage 8 $0.00    5   
210     Mar 24, 2021 riveted aft deck Fuselage 7 $0.00    5   
209     Mar 23, 2021 Aft Deck, SL000-14 Tailcone Stiffener, prep work Fuselage 7 $0.00    6   
208     Mar 20, 2021 Edge distance on Longerons at F-711 bulkhead. Fuselage 2 $0.00    5   
207     Mar 19, 2021 Shims & elevator stops. Fuselage 3 $0.00    3   
206     Mar 18, 2021 Aft Deck Fuselage 6 $0.00    5   
205     Mar 17, 2021 Flip that canoe Baby!!! Fuselage 0.3 $0.00    1   
204     Mar 17, 2021 Recycled Fuse crate into work cart Fuselage 6 $0.00    1   
203     Mar 16, 2021 Fuselage cart Fuselage 8 $0.00    2   
202     Mar 08, 2021 more riveting Fuselage 2 $0.00    1   
201     Mar 07, 2021 More rivets Fuselage 2 $0.00    0   
200     Mar 06, 2021 Pound them rivets, pt. 2 Fuselage 2 $0.00    1   
199     Mar 03, 2021 Pound them rivets! Fuselage 5 $0.00    3   
198     Feb 27, 2021 fuselage riveting Fuselage 3 $0.00    5   
197     Feb 26, 2021 riveting continued Fuselage 7 $0.00    2   
196     Feb 25, 2021 Random fuselage assy Fuselage 8 $0.00    4   
195     Feb 23, 2021 Started reassembly Fuselage 1 $0.00    1   
194     Feb 23, 2021 static line clips Fuselage 1 $0.00    4   
193     Feb 22, 2021 primed longerons Fuselage 3 $0.00    1   
192     Feb 11, 2021 Dimpled, countersunk, etc. Fuselage 6 $0.00    3   
191     Feb 07, 2021 disassembly continued Fuselage 7 $0.00    2   
190     Feb 05, 2021 prep work and disaster recovery (new F-770 skin) Fuselage 16 $0.00    6   
189     Jan 29, 2021 prep on F-770R Fuselage 2 $0.00    2   
188     Jan 28, 2021 F-782 prep plus a lot of deburring Fuselage 7 $0.00    5   
187     Jan 26, 2021 Started fwd fuselage disassembly Fuselage 4 $0.00    1   
186     Jan 25, 2021 fwd fuselage floor stiffeners & finished match drilling Fuselage 4 $0.00    3   
185     Jan 24, 2021 fwd fuselage floor stiffeners Fuselage 1.5 $0.00    4   
184     Jan 22, 2021 fwd fuselage match drilling continued Fuselage 1 $0.00    2   
183     Jan 21, 2021 brake & rudder Fuselage 3 $0.00    2   
182     Jan 06, 2021 Baggage compartment sidewalls Fuselage 4 $0.00    3   
181     Jan 05, 2021 floor stiffeners Fuselage 5 $0.00    7   
180     Jan 04, 2021 Match drilled F772 skin etc. Fuselage 3 $0.00    2   
179     Jan 04, 2021 Rudder pedal center brace Controls 1.5 $0.00    1   
178     Dec 28, 2020 Rudder pedal assy Controls 5 $0.00    3   
177     Dec 27, 2020 Brake pedals finished Controls 2 $0.00    1   
176     Dec 22, 2020 F-969 Finished Fuselage 3 $0.00    2   
175     Dec 09, 2020 Shimmed F-902, fabricated I match drilled r/h F-796 assy Fuselage 5 $0.00    6   
174     Dec 03, 2020 New F-719-L & F-719B. Also F-902 & F-7101 Fuselage 7 $0.00    9   
173     Dec 02, 2020 F-684L&R Fuselage 6 $0.00    3   
172     Nov 30, 2020 F-719 clip & fuselage stiffener fubar Fuselage 1 $0.00    1   
171     Nov 24, 2020 fwd cabin mid & lower longerons, goofed on the F-684 gusset Fuselage 7 $0.00    6   
170     Nov 23, 2020 Fwd cabin longerons Fuselage 5 $0.00    7   
169     Nov 21, 2020 FF-00098 tabs Firewall .3 $0.00    1   
168     Nov 20, 2020 Firewall Firewall 5 $0.00    7   
167     Nov 20, 2020 Match drilled aft of F-704 Fuselage 3 $0.00    2   
166     Nov 18, 2020 drilled longerons Fuselage 5 $0.00    6   
165     Nov 17, 2020 F-770 conical bends Fuselage 5 $0.00    10   
164     Nov 16, 2020 F-770 Side skins Fuselage 6 $0.00    10   
163     Nov 15, 2020 Mated aft cabin to tailcone Fuselage 2 $0.00    2   
162     Nov 14, 2020 drilled out F-705 seat back cross brace Fuselage .5 $0.00    3   
161     Nov 12, 2020 brake pedals Controls 4 $0.00    2   
160     Nov 12, 2020 removable copilot stick Controls 4 $0.00    4   
159     Nov 12, 2020 Crotch Strap brackets finished Fuselage 4 $0.00    2   
158     Nov 11, 2020 Center section oopsie Fuselage 1 $0.00    1   
157     Nov 10, 2020 seat backs Fuselage 6 $0.00    5   
156     Nov 05, 2020 Center section continued Fuselage 1 $0.00    2   
155     Nov 04, 2020 Center section continued Fuselage 8 $0.00    3   
154     Nov 01, 2020 Center section continued Fuselage 4 $0.00    2   
153     Oct 30, 2020 seat frames Fuselage 6 $0.00    2   
152     Oct 25, 2020 modify F-721B Fuselage 2 $0.00    1   
151     Oct 24, 2020 longerons finished. Fuselage 2 $0.00    1   
150     Oct 23, 2020 ELT Bracket Fuselage 2 $0.00    5   
149     Oct 23, 2020 Longerons in process Fuselage 2 $0.00    3   
148     Oct 20, 2020 Longerons in process Fuselage 6 $0.00    6   
147     Oct 15, 2020 dimpled center section belly skin, ready for riveting Fuselage 2 $0.00    2   
146     Oct 14, 2020 Aileron trim Fuselage 5 $0.00    5   
145     Oct 06, 2020 Center section substructure complete Fuselage 8 $0.00    3   
144     Oct 06, 2020 Center section substructure complete Fuselage 7 $0.00    0   
143     Oct 05, 2020 Longeron update + Crotch strap brackets Fuselage 4 $0.00    4   
142     Oct 03, 2020 Longerons continued Fuselage 8 $0.00    8   
141     Oct 01, 2020 Longerons! Fuselage 3 $0.00    4   
140     Oct 01, 2020 center section continued Fuselage 6 $0.00    4   
139     Sep 30, 2020 Center section continued Fuselage 10 $0.00    5   
138     Sep 29, 2020 Center section Fuselage 6 $0.00    3   
137     Sep 28, 2020 F-623 match drill, F-704 assembled Fuselage 5 $0.00    5   
136     Sep 27, 2020 F-623 Baggage Ribs Fuselage 1 $0.00    3   
135     Sep 26, 2020 aft tailcone riveting + match drilled center section Fuselage 5 $0.00    4   
134     Sep 25, 2020 fist assy of center section. Fuselage 6 $0.00    3   
133     Sep 24, 2020 longeron saga + center section floor ribs Fuselage 8 $0.00    5   
132     Sep 23, 2020 pitch servo mount & static port holes Fuselage 6 $0.00    5   
131     Sep 22, 2020 continued riveting aft fuselage Fuselage 9 $0.00    3   
130     Sep 19, 2020 aft fuselage final assy started Fuselage 4 $0.00    10   
129     Sep 17, 2020 Aft Fuselage re-assembled Fuselage 8 $0.00    6   
128     Sep 16, 2020 Prep aft fuse components Fuselage 9 $0.00    3   
127     Sep 15, 2020 Aft Fuselage continues Fuselage 7 $0.00    1   
126     Sep 14, 2020 match drill aft fuselage Fuselage 6 $0.00    3   
125     Sep 14, 2020 WD-409 shims Fuselage 3 $0.00    8   
124     Sep 11, 2020 Aft Fuselage Fuselage 7 $0.00    9   
123     Sep 10, 2020 Aft fuselage Fuselage 4 $0.00    1   
122     Sep 09, 2020 WD-409 tailwheel weldment, F-711, F-712, F-779 Fuselage 8 $0.00    4   
121     Sep 08, 2020 w-818 pushrods Controls 2 $0.00    4   
120     Sep 04, 2020 longeron prep Fuselage 2 $0.00    1   
119     Sep 03, 2020 Fuselage bulkheads Workshop 10 $0.00    4   
118     Aug 30, 2020 Cleaned up shop and overhauled band saw Workshop 4 $0.00    1   
117     Aug 29, 2020 F-705 bulkhead continued Fuselage 3 $0.00    5   
116     Aug 28, 2020 Bulkheads continued Fuselage 5 $0.00    3   
115     Aug 27, 2020 bulkheads continued Fuselage 5 $0.00    6   
114     Aug 26, 2020 Fuselage bulkheads Fuselage 5 $0.00    5   
113     Aug 26, 2020 F-705 bulkhead continued Fuselage 4 $0.00    2   
112     Aug 24, 2020 F705 continued Fuselage 5 $0.00    5   
111     Aug 23, 2020 continued F-705 Fuselage 2 $0.00    3   
110     Aug 22, 2020 F-705 bulkhead continued Fuselage 7 $0.00    9   
109     Aug 21, 2020 Started F-705 bulkhead Fuselage 4 $0.00    4   
108     Aug 21, 2020 finished bulkheads Fuselage 2 $0.00    2   
107     Aug 20, 2020 Continued work on fwd center bulkhead Fuselage 7 $0.00    4   
106     Aug 19, 2020 Control sticks Controls 3 $0.00    6   
105     Aug 14, 2020 Continued center section Fuselage 6 $0.00    5   
104     Aug 13, 2020 Started center section Fuselage 5 $0.00    5   
103     Aug 13, 2020 Finished firewall Firewall 5 $0.00    2   
102     Aug 11, 2020 Primed all support structure, clecoed everything together Firewall 3 $0.00    1   
101     Aug 10, 2020 Firewall continued Firewall 4 $0.00    0   
100     Aug 10, 2020 Firewall continued Firewall 4 $0.00    1   
99     Aug 02, 2020 match drilled firewall Firewall 5 $0.00    3   
98     Jul 10, 2020 firewall layout Firewall 4 $0.00    2   
97     Jul 09, 2020 Inventory Fuselage 4 $0.00    1   
96     Jul 08, 2020 Fuselage kit arrived today! Fuselage 2 $0.00    4   
95     May 01, 2020 cleaned shop Workshop 4 $0.00    0   
94     May 01, 2020 trial fit flight controls Wings 2 $0.00    3   
93     Apr 30, 2020 wing inspection panels Wings 1 $0.00    2   
92     Apr 28, 2020 Pitot plumbing Wings 2 $0.00    1   
91     Apr 27, 2020 fit r/h wingtip to wing. drilled to #40 & clecoed Wings 3 $0.00    2   
90     Apr 26, 2020 finished wingtip nav light install on r/h wing Wings 3 $0.00    1   
89     Apr 23, 2020 Fit and drilled L/H wingtip Wings 4 $0.00    3   
88     Apr 23, 2020 Finished fitting r/h nav light. Lighting 2 $0.00    2   
87     Apr 22, 2020 r/h wingtip lens Lighting 8 $0.00    3   
86     Apr 21, 2020 Trimmed left wingtip Wings 4 $0.00    1   
85     Apr 20, 2020 Continued to fit wingtips Wings 6 $0.00    6   
84     Apr 16, 2020 re-shape wingtips Wings 6 $0.00    6   
83     Apr 14, 2020 Wing Insp. panels & wingtips Wings 3 $0.00    3   
82     Apr 11, 2020 r/h landing light & wiring Lighting 3 $0.00    2   
81     Apr 10, 2020 started r/h landing light Lighting 3 $0.00    3   
80     Apr 07, 2020 finished installing lower outbid skin Wings 3 $0.00    2   
79     Apr 05, 2020 started riveting lower outbd l/h wing skin Wings 4 $0.00    4   
78     Apr 03, 2020 pitot wiring Avionics 1 $0.00    2   
77     Apr 02, 2020 pulled wires, tested lights Lighting 6 $0.00    5   
76     Mar 31, 2020 continued landing lights Lighting 6 $0.00    4   
75     Mar 27, 2020 Landing light mount Lighting 8 $0.00    7   
74     Mar 26, 2020 Aeembled Fly LED Landing Lights Lighting 1 $0.00    4   
73     Mar 24, 2020 Started Landing lights mounts Lighting 8 $0.00    4   
72     Mar 23, 2020 Prep wing skin. Prep pitot. Wings 4 $0.00    2   
71     Mar 10, 2020 SB16-03-28 on left wing Wings 3 $0.00    8   
70     Mar 08, 2020 Adjusted aft spar flange r/h wing. Wings $0.00    9   
69     Mar 08, 2020 Landing light brainstorming Wings 3 $0.00    1   
68     Mar 08, 2020 Re-arranged shop & set up to finish wings Wings 4 $0.00    3   
67     Mar 07, 2020 Re-arranged shop & set up to finish wings Wings 4 $0.00    1   
66     Mar 07, 2020 Rolled rudder leading edge Empennage 2 $0.00    4   
65     Mar 05, 2020 Rudder trailing edge Empennage 2 $0.00    5   
64     Mar 05, 2020 Elevators finished except fiberglass Empennage 3 $0.00    5   
63     Mar 03, 2020 rolled elevator leading edges. Empennage 9 $0.00    3   
62     Feb 29, 2020 L/H Elevator & Trim Tab. Empennage 8 $0.00    1   
61     Feb 29, 2020 Elevators, trim tab & rudder in process Empennage 6 $0.00    4   
60     Feb 26, 2020 L/H elevator Empennage 5 $0.00    4   
59     Feb 22, 2020 R/H elevator substructure Empennage 2 $0.00    2   
58     Feb 21, 2020 Elevator stiffeners Empennage 4 $0.00    2   
57     Feb 20, 2020 new elevator skins & stiffeners prepped. Empennage 4 $0.00    2   
56     Feb 09, 2020 perfection is the enemy of progress, but... Empennage 4 $0.00    3   
55     Feb 04, 2020 riveted elevator stiffeners Empennage 4 $0.00    3   
54     Jan 31, 2020 rudder/elevators Empennage 7 $0.00    1   
53     Jan 16, 2020 worked on rudder, started elevators Empennage 7 $0.00    2   
52     Jan 15, 2020 Rudder Empennage 10 $0.00    8   
51     Jan 14, 2020 Match drilled, deburred & primed rudder parts Empennage 7 $0.00    3   
50     Jan 10, 2020 finished rudder stiffeners & started spar skeleton Empennage 1.5 $0.00    3   
49     Jan 07, 2020 rudder stiffener install Empennage 5 $0.00    4   
48     Dec 27, 2019 Rudder stiffeners Empennage 4 $0.00    1   
47     Dec 23, 2019 Aileron pushrods Wings 2 $0.00    2   
46     Dec 12, 2019 set mark on r/h wing lower trailing edge- disposition Wings 1 $0.00    2   
45     Dec 12, 2019 Wing Spar root nut plate rework Wings 2 $0.00    4   
44     Dec 12, 2019 Aileron pushtubes plus rework on spar nutplates Wings 3 $0.00    5   
43     Dec 10, 2019 aileron pushrods Wings 1 $0.00    1   
42     Dec 10, 2019 autopilot mount Wings 1 $0.00    1   
41     Dec 09, 2019 rework galore. Empennage 5 $0.00    3   
40     Nov 23, 2019 Drat- the control horn to center bearing hole is mis-drilled Empennage 2 $0.00    1   
39     Nov 20, 2019 trimmed HS702 and H/s skin interference Empennage 4 $0.00    7   
38     Nov 19, 2019 Temp install elevators Empennage 2 $0.00    3   
37     Nov 18, 2019 Finished Horizontal Stab Assy Empennage 10 $0.00    4   
36     Nov 17, 2019 assy continues Empennage 1 $0.00    1   
35     Nov 16, 2019 H/S Spars Empennage 2 $0.00    3   
34     Nov 15, 2019 dimpled skins & riveted in HS707 on left H/S half Empennage 3 $0.00    2   
33     Nov 06, 2019 prep for final assy. Empennage 5 $0.00    0   
32     Nov 05, 2019 disassembly &b debur l/h horizontal stab Empennage 2 $0.00    6   
31     Nov 04, 2019 dimpled L/H horizontal stab. clecoedR/H half Empennage 7 $0.00    9   
30     Nov 02, 2019 match drilled L/H half Empennage 4 $0.00    3   
29     Oct 29, 2019 finished match drilling & deburring fwd spar assy Empennage 2 $0.00    1   
28     Oct 28, 2019 Aft spars, round 2 Empennage 4 $0.00    3   
27     Oct 26, 2019 primer experiment Empennage 3 $0.00    1   
26     Oct 23, 2019 OOPS! Empennage $0.00    0   
25     Oct 20, 2019 Fwd spar work + made some tooling Empennage 8 $0.00    4   
24     Oct 18, 2019 prepped HS aft spar Empennage 3 $0.00    1   
23     Oct 17, 2019 H/S Empennage 2 $0.00    1   
22     Oct 16, 2019 practice Research 6 $0.00    0   
21     Oct 09, 2019 Rudder & V/S conformity wrap-up Empennage 3 $0.00    3   
20     Oct 04, 2019 tested trim / torqued jamb nuts. Empennage 3 $0.00    4   
19     Oct 04, 2019 flap issue Wings 2 $0.00    2   
18     Oct 03, 2019 Elevator trim cover panel Empennage 2 $0.00    4   
17     Oct 03, 2019 Aileron wrap-up Wings 2 $0.00    1   
16     Sep 28, 2019 installed missing rivets in aileron Wings 2 $0.00    2   
15     Sep 26, 2019 aileron & flap conformity/quality check Wings 2 $0.00    1   
14     Sep 26, 2019 set missing rivets & trial fit of trim servo Empennage 2 $0.00    3   
13     Sep 25, 2019 Rivet set mark on R/H elevator. Research 0.5 $0.00    1   
12     Sep 25, 2019 wrong rivets in rudder Empennage .5 $0.00    3   
11     Sep 25, 2019 redo-decision Empennage 6 $0.00    1   
10     Sep 17, 2019 continue disassembly of L/H horizontal stab. Empennage 4 $0.00    2   
9     Sep 17, 2019 bought random tools. Tools 2 $0.00    0   
8     Sep 17, 2019 Pitot mast corrosion control Wings .2 $0.00    1   
7     Sep 16, 2019 Re-skinning H/S Empennage 3 $0.00    2   
6     Sep 12, 2019 disposition from Vans Empennage 0 $0.00    1   
5     Sep 11, 2019 Research/double drilled hole & SB Empennage 2 $0.00    6   
4     Sep 10, 2019 inspection/research Research 6 $0.00    7   
3     Sep 09, 2019 service bulletins Research 3 $0.00    1   
2     Sep 07, 2019 Picked up used wing& empennage kit Research 4 $0.00    2   
1     Dec 31, 1969 Finished CHT/EGT probe install & wiring Engine 4 $0.00    1   
------------ -------------- -------------
Totals3219.7    $0.00    1796   





NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.