EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Summary
Hours
Entries
Expenses
Dtl. Expenses
Flight Time
Viewers
Categories
Project:
Sportsman
- Project Summary
- Optional PDF document function
- Multi-sectional PDF
Add entry descriptions
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
# Pictures
660
Aug 19, 2023
Added VG's to Horizontal Stabalizer
Horiz S (IV)
2
4
659
Apr 03, 2023
Paint Codes
Paint / Decals
2
658
Apr 03, 2023
Added new decals
Paint / Decals
1
5
657
Jun 05, 2022
Silpruf all window gaps (exterior)
Final (X)
10
14
656
May 29, 2022
Final Weight & Balance
Final (X)
3
4
655
May 29, 2022
Paint is complete
Paint / Decals
5
6
654
May 07, 2022
Paint Begins!
Paint / Decals
3
653
Apr 22, 2022
Installed Baja Design Cowl Lights
Lighting
3
14
652
Feb 23, 2022
Front windscreen done
Final (X)
2
4
651
Feb 12, 2022
First Flight
Phase 1
4
1
650
Feb 07, 2022
Airworthiness Certification
Inspection
3
1
649
Feb 05, 2022
Steps 152 - 175 Install Front Window
Final (X)
30
18
648
Feb 03, 2022
8130-6 Paperwork
Inspection
10
1
647
Jan 30, 2022
Weight and Balance - take 2
Final (X)
3
3
646
Jan 29, 2022
Fuel Sender calibration
Final (X)
7
5
645
Jan 28, 2022
Fuel Flow testing
Final (X)
2
2
644
Jan 27, 2022
Pitot static test and Transponder check
Final (X)
5
1
643
Jan 25, 2022
Data plates
Final (X)
1
3
642
Jan 25, 2022
High Speed Taxi and brake check
Final (X)
2
1
641
Jan 23, 2022
Installing EXPERIMENTAL decals
Final (X)
2
4
640
Jan 20, 2022
Weight and Balance
Final (X)
3
2
639
Jan 18, 2022
First ENGINE start and taxi
Final (X)
4
0
638
Jan 13, 2022
Transition Training
Final (X)
10
3
637
Jan 07, 2022
Started to work on gathering information for programming of G3X and rest of avionics
Final (X)
4
26
636
Jan 06, 2022
Tensioned all control cables
Final (X)
10
3
635
Jan 05, 2022
Step #167 Install elevator counterweight
Final (X)
4
5
634
Jan 04, 2022
Step #166 and 167
Final (X)
4
2
633
Jan 03, 2022
Step #164 - 165
Final (X)
6
6
632
Jan 02, 2022
Step #163 Install HS tip fairing
Final (X)
6
3
631
Jan 01, 2022
Control Surface Balancing - Step #158 - 159
Final (X)
7
4
630
Dec 31, 2021
Step #130 - 135 Install wing fold hatches
Final (X)
9
8
629
Dec 29, 2021
Step #130 - 135 - Install wing fold hatches
Final (X)
9
7
628
Dec 28, 2021
Step #130 - 135 - Install wing fold hatches
Final (X)
8
3
627
Dec 27, 2021
Installed WAT light system
Final (X)
9
7
626
Dec 20, 2021
Installed NAV antenna
Final (X)
3
4
625
Dec 19, 2021
Finished wingtip fiberglass work; WAT light install
Final (X)
7
7
624
Dec 18, 2021
Step #181 and 182 - Install inboard and outboard delta wings
Final (X)
2
2
623
Dec 18, 2021
Step 99 - Install wingtip fairing nutplates
Final (X)
3
2
622
Dec 17, 2021
Step #97 - 98 - Bond wing tip fairings together
Final (X)
4
4
621
Dec 17, 2021
Step #86 - 91 build and install Delta Wings
Final (X)
6
11
620
Dec 14, 2021
Step #83 - Install main fuel lines fittings
Final (X)
3
4
619
Dec 11, 2021
Antenna mount and Temp Probe
Final (X)
4
4
618
Dec 11, 2021
Misc. Final Assembly items
Final (X)
15
19
617
Nov 25, 2021
Mount Ailerons and Flaps
Final (X)
6
3
616
Nov 24, 2021
Mount wings to fuselage
Final (X)
4
4
615
Nov 23, 2021
Mount wings
Final (X)
4
6
614
Nov 22, 2021
Moving Day to the Hangar
Final (X)
5
14
613
Nov 20, 2021
About ready to move! Final odds and ends
Final (X)
6
8
612
Nov 15, 2021
Front Windshield prep and install
Final (X)
10
9
611
Nov 15, 2021
Steps 152 - 156 - Window installation
Final (X)
20
42
610
Nov 03, 2021
Prop Safety Wire
Final (X)
1
3
609
Nov 02, 2021
FAA Registration issues
Final (X)
3
0
608
Nov 02, 2021
Torque Prop bolts
Final (X)
.5
3
607
Oct 31, 2021
Step 188 - Inspect Landing Gear, Wheels and Brake System
Final (X)
2
0
606
Oct 29, 2021
Misc. Final Assembly items
Final (X)
30
21
605
Oct 16, 2021
Final Assembly items
Final (X)
35
39
604
Oct 03, 2021
Misc. Final Assembly items
Final (X)
25
30
603
Sep 19, 2021
Misc. Final Assembly items
Final (X)
15
20
602
Sep 11, 2021
Step #30 - 34 - Install Strakes
Final (X)
15
36
601
Aug 29, 2021
Step #21 - Mount Seat Tracks to cage (again)
Final (X)
1
4
600
Aug 27, 2021
Step #30 - 34 - Install Strakes
Final (X)
10
22
599
Aug 22, 2021
Step #27 - #29 Install Strakes
Final (X)
6
8
598
Aug 21, 2021
Fuselage Fairing Installation
Final (X)
2
1
597
Aug 17, 2021
Step #101 - ? Baggage Door Install
Final (X)
6
3
596
Aug 16, 2021
Label Panel
Avionics
2
9
595
Aug 14, 2021
Install forward tunnel covers
Final (X)
2
3
594
Aug 14, 2021
Step #? - Install baggage door
Final (X)
4
4
593
Aug 12, 2021
Step #101 - Install Cabin Doors
Final (X)
6
4
592
Aug 10, 2021
Installed tabs for glare shield support
Final (X)
1
2
591
Aug 10, 2021
Installed oiler cooler aeroduct
Final (X)
.5
1
590
Aug 10, 2021
Finish installing cabin heat
Final (X)
2
6
589
Aug 08, 2021
Installed Front pulley and cable covers
Final (X)
2
1
588
Aug 08, 2021
Step #17 - Fit floorboards
Final (X)
3
5
587
Aug 07, 2021
Install Cabin light
Avionics
3
4
586
Aug 07, 2021
Step #25 - Install Control sticks
Fuselage (VIII)
2
4
585
Aug 07, 2021
Step #25 - Install Control sticks
Fuselage (VIII)
1
1
584
Aug 06, 2021
Step #25 - Install Control sticks
Fuselage (VIII)
3
1
583
Aug 04, 2021
Step #8 - Fit the seat pans through Step #25 install seat tracks
Fuselage (VIII)
7
6
582
Jul 30, 2021
Install engine control cables
Fuselage (VIII)
6
15
581
Jul 29, 2021
Step #8 Close out bulkhead
Fuselage (VIII)
3
5
580
Jul 28, 2021
Install Vents
Fuselage (VIII)
4
7
579
Jul 25, 2021
Install Vents
Fuselage (VIII)
3
4
578
Jul 24, 2021
Install Vents
Fuselage (VIII)
3
6
577
Jul 17, 2021
Install Vents
Fuselage (VIII)
4
4
576
Jul 17, 2021
Avionics - continued
Avionics
45
37
575
Jun 24, 2021
Avionics Wiring
Avionics
50
8
574
Jun 06, 2021
Avionics Wiring
Avionics
30
9
573
May 30, 2021
Avionics Wiring
Avionics
30
21
572
May 09, 2021
Avionics Wiring
Avionics
5
0
571
May 08, 2021
Panel Build and Wiring
Avionics
25
16
570
Apr 17, 2021
Panel Build
Avionics
15
29
569
Apr 06, 2021
Remote mount devices
Avionics
3
4
568
Apr 03, 2021
Avionics Design and Install
Avionics
15
5
567
Mar 25, 2021
Avionics design and install
Avionics
25
9
566
Mar 14, 2021
Avionics Install
Avionics
20
18
565
Mar 02, 2021
Exhaust System install
Final (X)
4
4
564
Feb 21, 2021
Baffling install
Final (X)
3
9
563
Feb 20, 2021
Baffling install
Final (X)
2
3
562
Feb 19, 2021
Baffling install
Final (X)
2.5
4
561
Feb 17, 2021
Baffling install
Final (X)
1.5
2
560
Feb 16, 2021
Cowling install
Final (X)
5
6
559
Feb 14, 2021
Cowling Install
Final (X)
8
17
558
Feb 12, 2021
Prop ordered
Propeller
1
0
557
Feb 12, 2021
FWF Hose install
Final (X)
2
3
556
Feb 12, 2021
Cowling Install
Final (X)
1.5
5
555
Feb 10, 2021
Cowling install
Final (X)
2
5
554
Feb 08, 2021
FWF Hose install kit
Final (X)
2
4
553
Feb 07, 2021
FWF Hose install - Cont'd
Final (X)
4
3
552
Feb 07, 2021
Install Baffling
Final (X)
15
18
551
Feb 07, 2021
FWF Hose Install
Final (X)
8
1
550
Jan 23, 2021
Engine install
Final (X)
25
19
549
Jan 15, 2021
Step 5 - Fasten FW to fuselage
Final (X)
6
7
548
Jan 14, 2021
Prep for Firewall install
Final (X)
3
3
547
Jan 13, 2021
Fuel Line Tweaking (RH side)
Final (X)
2
5
546
Jan 12, 2021
Fuel Line Tweaking
Final (X)
3
5
545
Jan 05, 2021
Install Sportsman Latch kit
Final (X)
3
3
544
Jan 04, 2021
Install Sportsman Latch kit
Final (X)
2
1
543
Jan 03, 2021
Install Sportsman Latch kiy
Final (X)
2
2
542
Jan 01, 2021
Chafe wrap brake lines
Final (X)
1
0
541
Jan 01, 2021
Safety wire gascoalator
Final (X)
1
3
540
Dec 31, 2020
Final trimming on Firewall
Final (X)
1
0
539
Dec 30, 2020
Installed exit ramp on Firewall
Final (X)
1
1
538
Dec 29, 2020
Moved wings to Hangar
Workshop
4
5
537
Dec 28, 2020
Installed Gascoaltor
FWF (X)
2
1
536
Dec 27, 2020
Sportsman Oil Cooler Installation
FWF (X)
3
5
535
Dec 26, 2020
FWF parts reserach
Research
5
0
534
Dec 25, 2020
Step #4 - Rivet firewall assembly together
Final (X)
3
2
533
Dec 24, 2020
Step #3 - Fit Firewall to Fuselage and drill Engine mount bolts
Final (X)
1.5
0
532
Dec 23, 2020
Step #3 - Fit Firewall to Fuselage and drill Engine mount bolts
Final (X)
2.5
5
531
Dec 22, 2020
Step #3 - Fit Firewall to Fuselage and drill Engine mount bolts
Final (X)
.7
1
530
Dec 22, 2020
Step #2 - Fabricate FW components
Final (X)
2
2
529
Dec 21, 2020
Step #2 - Fabricate FW components
Final (X)
5
5
528
Dec 20, 2020
Step #2 - Fab firewall components
Final (X)
1
0
527
Dec 20, 2020
Step #1 - Fab & install instrument panel brakets
Final (X)
1
2
526
Dec 20, 2020
Step #115 - Route fuselage pitot ine
Systems (IX)
3
4
525
Dec 19, 2020
Step 102 - route brake lines and install parking brake
Systems (IX)
1
1
524
Dec 18, 2020
Step 102 - route brake lines and install parking brake
Systems (IX)
1
3
523
Dec 17, 2020
Step 102 - route brake lines and install parking brake
Systems (IX)
2
7
522
Dec 16, 2020
Parking Brake option install kit
Systems (IX)
2
0
521
Dec 15, 2020
Step 101 - Route brake lines from calipers to Master cylinders
Systems (IX)
2
3
520
Dec 14, 2020
Theme
Paint / Decals
1
519
Dec 13, 2020
Step #108 - Route Fuel Lines to fuel selector valve
Systems (IX)
4
10
518
Dec 12, 2020
Step #7 - Install Brake Master Cylinder
Systems (IX)
2
4
517
Dec 12, 2020
Step #107 + 108 - Run fuel lines from headers to shut off vlave
Systems (IX)
4
1
516
Dec 06, 2020
Step #106 - Mount header tanks and route fuel lines from drain
Systems (IX)
2
4
515
Dec 06, 2020
Step #106 - Mount header tanks
Systems (IX)
1
4
514
Dec 04, 2020
Step #105 - Install the drain valve
Systems (IX)
.5
1
513
Dec 04, 2020
Step#104 - Drill drain valve holes in fuselage floor
Systems (IX)
.2
1
512
Dec 04, 2020
Step #103 - reinforce drain valve mounting area
Systems (IX)
.2
0
511
Dec 03, 2020
Step #106 - Mount header tanks and route fuel lines from drain
Systems (IX)
1
1
510
Dec 03, 2020
Step #103 - Reinforce drain valve mounting area
Systems (IX)
2
0
509
Dec 03, 2020
Step 100 - install fittings in master cylinders
Systems (IX)
1
0
508
Dec 02, 2020
Step #99 - Install fittings in caliper assemblies
Systems (IX)
3
0
507
Dec 01, 2020
Step #86 - Check strut alignment
Systems (IX)
.5
0
506
Dec 01, 2020
Step #85 - mount nose wheel axle to nose fork assy
Systems (IX)
2
8
505
Dec 01, 2020
Step #84 - Mount nose wheel fork to strut axle
Systems (IX)
.5
0
504
Dec 01, 2020
Step #83 - Install shock bushings on truss
Systems (IX)
.5
0
503
Nov 30, 2020
Step #82 - Mount Nose Strut to firewall
Systems (IX)
.5
0
502
Nov 30, 2020
Step #81 - Mount shock truss to engine mount
Systems (IX)
1
0
501
Nov 30, 2020
Step #80 - mount tube and tire on nose wheel
Systems (IX)
.5
0
500
Nov 29, 2020
Step #79 - Mount the brake calipers
Systems (IX)
2
6
499
Nov 29, 2020
Step #78 - Mount Wheel on Axles
Systems (IX)
1
0
498
Nov 29, 2020
Step #76 Mount tubes and tires on main wheel
Systems (IX)
1
0
497
Nov 29, 2020
Step #75 Install brake torque plate and wheel pant mounting brakets
Systems (IX)
.5
0
496
Nov 29, 2020
Step #74 - Install Brake Mounting flanges
Systems (IX)
2
8
495
Nov 28, 2020
Step #74 - Install Brake Mounting flanges
Systems (IX)
1.5
0
494
Nov 27, 2020
Step #74 - Install Brake Mounting flanges
Systems (IX)
3.5
1
493
Nov 27, 2020
Step #73 - Drill and Bolt Main Gear legs
Systems (IX)
4
5
492
Nov 26, 2020
Step #72 - Insert and Position the Gear legs
Systems (IX)
4
3
491
Nov 25, 2020
Step #71 - Support and level the fuselage
Systems (IX)
2
0
490
Nov 24, 2020
Moved wings...set-up workshop for Fuselage
Workshop
3
8
489
Nov 23, 2020
Step #76 - install fuel caps
Final (X)
1
0
488
Nov 22, 2020
Step #78 Rivet inspection hole doublers
Final (X)
1.5
0
487
Nov 22, 2020
Step #82 - Rivet the cove skins and trailer edge
Final (X)
1.5
5
486
Nov 21, 2020
Step #82 - Rivet the cove skins and trailer edge
Final (X)
4
3
485
Nov 21, 2020
Step #82 - Rivet the cove skins and trailer edge
Final (X)
3
0
484
Nov 20, 2020
Step #82 - Rivet the cove skins and trailer edge
Final (X)
2
0
483
Nov 20, 2020
Step #80 - Fit trailing edge doublers
Final (X)
.5
0
482
Nov 20, 2020
Step #79 - Cut cove skins to length
Final (X)
1
1
481
Nov 19, 2020
Step #77 - connect fuel tank vent lines + aux vent lines
Final (X)
3
0
480
Nov 19, 2020
Step #75 - Install Fuel tanks and rivet root ribs
Final (X)
3
0
479
Nov 18, 2020
Step #75 - Install Fuel tanks and rivet root ribs
Final (X)
1.5
2
478
Nov 17, 2020
Step #75 - Install Fuel tanks and rivet root ribs
Final (X)
2
0
477
Nov 16, 2020
Swapped wings
Final (X)
2
0
476
Nov 15, 2020
Step #76 - install fuel caps
Final (X)
1
2
475
Nov 14, 2020
Step #75 - Install Fuel tanks and rivet root ribs
Final (X)
1.5
0
474
Nov 13, 2020
Glasair Firewall Forward parts arrived
Final (X)
3
3
473
Nov 11, 2020
Step #75 - Install fuel tanks
Final (X)
2.5
9
472
Nov 10, 2020
Step #82 - Rivet the cove skins and trailer edge
Final (X)
0
471
Nov 09, 2020
Step #82 - Rivet the cove skins and trailer edge
Final (X)
1.5
7
470
Nov 08, 2020
Step #82 - Rivet the cove skins and trailer edge
Final (X)
3
2
469
Nov 07, 2020
Step #82 - Rivet the cove skins and trailer edge
Final (X)
1.5
0
468
Nov 07, 2020
Step #81 - Fit and drill cove skins
Final (X)
4
4
467
Nov 04, 2020
Step #80 - Fit trailing edge doublers
Final (X)
.5
0
466
Nov 03, 2020
ANOR - Access covers
Final (X)
1.5
2
465
Nov 03, 2020
Loctite order
Research
1
0
464
Nov 01, 2020
Install nutserts on LH wing access panels
Systems (IX)
3.5
1
463
Oct 29, 2020
Step #79 - Cut cove skins to length
Systems (IX)
6
3
462
Oct 29, 2020
Step #79 - Cut cove skins to length
Systems (IX)
2
0
461
Oct 25, 2020
Step #75 - Install Fuel tanks and rivet root ribs
Systems (IX)
4
2
460
Oct 24, 2020
Step #75 - Install Fuel tanks and rivet root ribs
Systems (IX)
4
8
459
Oct 23, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
1.5
8
458
Oct 22, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
1
0
457
Oct 21, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
1.5
0
456
Oct 20, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
2.5
0
455
Oct 18, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
1.5
3
454
Oct 17, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
1
0
453
Oct 17, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
1.5
0
452
Oct 15, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
2
0
451
Oct 14, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
1
1
450
Oct 13, 2020
Step #74
Systems (IX)
2.7
1
449
Oct 12, 2020
Step #74 - Rivet Upper Wing Skins
Systems (IX)
.5
0
448
Oct 11, 2020
Step #72 - Cleco upper hat section stiffeners to spars
Systems (IX)
1
0
447
Oct 11, 2020
Step #70 - Install wing lighting
Systems (IX)
2
7
446
Oct 11, 2020
Step #69 - Install pitot tube and line
Systems (IX)
2
1
445
Oct 08, 2020
Step #? Mount LH Wing in Fixture, level
Final (X)
2
0
444
Oct 08, 2020
Step #74 - Rivet Upper Wing Skins
Final (X)
12.5
6
443
Sep 20, 2020
Step #72 - Cleco upper hat section stiffeners to spars
Final (X)
1
0
442
Sep 20, 2020
Step #73 - Drill Flap Track Rib Rivet holes
Final (X)
0
441
Sep 20, 2020
Step #74 - Rivet Upper Wing Skins
Final (X)
5
2
440
Sep 19, 2020
Step #70 - Install wing lighting
Systems (IX)
2
5
439
Sep 18, 2020
Set-up wing jog
Workshop
2
0
438
Sep 15, 2020
Step #61 - Fit the Fuel lines
Systems (IX)
1.5
0
437
Sep 15, 2020
Step #60 - Install vent & fuel line fittings
Systems (IX)
1.5
3
436
Sep 13, 2020
Step #67 - Drill the inspection hole doublers
Systems (IX)
1
0
435
Sep 13, 2020
Step #64 - Route transfer pump wiring
Systems (IX)
.5
2
434
Sep 13, 2020
Step #63 - cut filler neck opening in upper outboard wing
Systems (IX)
1
1
433
Sep 12, 2020
Step #58 - install bumpers on tank perimeter
Systems (IX)
.7
0
432
Sep 12, 2020
Step #56 - Cut hole for Upper Wing skin fuel filler neck
Systems (IX)
1
9
431
Sep 11, 2020
Step #59 - Position, drill & rivet transfer pump doubler
Systems (IX)
.5
1
430
Sep 11, 2020
Step #57 - Position and drill Aux Tank Mounting Channels
Systems (IX)
.5
0
429
Sep 09, 2020
Step #56 - Cut hole for Upper Wing skin fuel filler neck
Systems (IX)
1
6
428
Sep 09, 2020
Step #66 - Install nut plate for wing support strut
Systems (IX)
.5
0
427
Sep 08, 2020
Step #53 - install bumpers around tank
Systems (IX)
1
2
426
Sep 07, 2020
Step #55 - Drill holes in root rib for main & return line bosses
Systems (IX)
1
0
425
Sep 07, 2020
Step #51 - drill hole in LWR skin for tank sump.
Systems (IX)
1
1
424
Sep 07, 2020
Step #49 - apply chafe tape to hat sections
Systems (IX)
.5
0
423
Sep 05, 2020
Moved LH wing and RH wing
Workshop
1
2
422
Sep 05, 2020
Moved LH wing and RH wing
Workshop
1
0
421
Sep 05, 2020
Step #69 - Install pitot tube and line
Systems (IX)
3
0
420
Sep 04, 2020
Step #67 - Drill the inspection hole doublers
Systems (IX)
1.5
0
419
Sep 03, 2020
Fuel Tank padding
Systems (IX)
1
4
418
Sep 03, 2020
Step #66 - Install Nutplate for wing support strut eyebolt
Systems (IX)
1
3
417
Sep 02, 2020
Step # 65 - Drill sump drain hole in lower skin
Systems (IX)
0
0
416
Sep 01, 2020
Step #63 - cut filler neck opening in upper outboard wing
Systems (IX)
1
3
415
Aug 31, 2020
Step #61 - Fit the Fuel lines
Systems (IX)
2
3