Project: MattJ     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours # Pictures
115     Jan 29, 2023 Weight and Balance Inspection 4 6   
114     Dec 28, 2022 Interior panels Interior Finish 16 10   
113     Nov 15, 2022 Farings & finishing Fuselage 8 7   
112     Nov 02, 2022 Finding Elevator trim problem Controls 12 7   
111     Oct 28, 2022 Flaps torque tube Controls 6 4   
110     Oct 24, 2022 Install the wings Fuselage 16 6   
109     Oct 18, 2022 Doors- Making it Rain! Fuselage 6 4   
108     Oct 13, 2022 Mounting the Tail feathers Tail Feathers 12 9   
107     Oct 13, 2022 Paint Finishing Work Paint / Decals 16 4   
106     Jun 03, 2022 Fuselage work Paint / Decals 23 8   
105     Jun 03, 2022 Some QB fixing to do Fuselage 5 5   
104     Apr 27, 2022 Paint education Paint / Decals 18 6   
103     Apr 08, 2022 Endless Prep work :) Paint / Decals 18 9   
102     Mar 25, 2022 Seats & More carpet Interior Finish 6 3   
101     Mar 15, 2022 Build the paint Booth interior Paint / Decals 9 2   
100     Feb 18, 2022 I made a rotisseri wing stand Paint / Decals 8 5   
99     Feb 18, 2022 Interior almost complete Interior Finish 25 7   
98     Feb 18, 2022 Engine warrantee Repair Engine 10 4   
97     Dec 19, 2021 First Start Engine 18 5   
96     Oct 31, 2021 WIndsheild Fuselage 14 6   
95     Oct 31, 2021 FInal Engine & Cowl instal/fit Engine 12 10   
94     Sep 29, 2021 Cowl Part III Engine 25 14   
93     Aug 23, 2021 Engine Cowl II Engine 7 6   
92     Aug 16, 2021 Engine Cowl Engine 11 8   
91     Aug 16, 2021 Passenger strut Bracket. Reshape the wrong Part Fuselage 7 9   
90     Aug 16, 2021 Vertical Stab Fairing Fuselage 13 7   
89     Aug 16, 2021 Finish Brake System Landing Gear 4 3   
88     Aug 16, 2021 Fuel Mod Complete Fuel System 11 4   
87     Aug 13, 2021 Propeller fitting Propeller 4.5 5   
86     Jun 26, 2021 Fuel system redesign - Part 2, preliminary work Fuel System 11 11   
85     Jun 13, 2021 Exhaust Engine 6 3   
84     Jun 08, 2021 Alodine & Tedious Filling of rivets Paint / Decals 15 3   
83     Jun 08, 2021 Fitting the Doors and Latches Fuselage 26 16   
82     Jun 08, 2021 Revising the fuel lines Fuel System 21 10   
81     May 09, 2021 Intercooler and Oil Lines Engine 12 3   
80     May 09, 2021 Putting the panel back together Avionics 4 3   
79     May 09, 2021 Finishing Air system Cabin AIr 12 7   
78     Apr 19, 2021 Forward canopy Composite Fuselage 16 11   
77     Apr 19, 2021 Adding Interior skins Interior Finish 10 3   
76     Apr 19, 2021 Adding accessories Engine 6 8   
75     Apr 02, 2021 Re-Thinking Cabin AIr Cabin AIr 6 6   
74     Mar 24, 2021 Preliminary Fit of Rotax 915 Engine 4 3   
73     Mar 23, 2021 Install the avionics & antenna cables Avionics 15 15   
72     Mar 23, 2021 Panel Supports and Rack Instrument Panel 10 4   
71     Mar 07, 2021 Interior Lighting Lighting 16 4   
70     Feb 28, 2021 SERVICE BULLETIN #0002 Fuselage 4.0 6   
69     Feb 11, 2021 Battery and start panel rack Avionics 3 4   
68     Feb 11, 2021 Run Fuel lines and boost pump Fuel System 10 10   
67     Jan 30, 2021 Install Auto Pilot Servos Avionics 5 6   
66     Jan 30, 2021 Fabricate wire shelves Fuselage 4 3   
65     Jan 30, 2021 Seat Belts Fuselage 8 7   
64     Jan 30, 2021 Assemble Selector valve Fuel System 12 9   
63     Jan 30, 2021 Cowling and accesories Firewall 7 3   
62     Jan 07, 2021 Installing Cowling Strip & firewall Items Firewall 10 8   
61     Jan 07, 2021 Brake Lines Landing Gear 8 2   
60     Jan 07, 2021 Starting carpet installation Interior Finish 2 1   
59     Jan 07, 2021 Finishing up Gear installation Landing Gear 12 4   
58     Dec 17, 2020 Initial Landing gear installation Landing Gear 6 7   
57     Dec 13, 2020 Interior Seats/carpet/walls Interior Finish 2 3   
56     Dec 13, 2020 Propeller Propeller 2 4   
55     Dec 13, 2020 Firewall Forward Kit Firewall 4 3   
54     Dec 13, 2020 Rotax 915is Engine 1 1   
53     Dec 13, 2020 Super Sound Proof Interior Finish 4 2   
52     Dec 09, 2020 Seat Rails Fuselage 2 3   
51     Dec 09, 2020 Admit defeat Cabin AIr 4.0 2   
50     Dec 09, 2020 Prefit Center Consol Interior Finish 3 4   
49     Dec 03, 2020 Quick Build Fixes Inspection 6 3   
48     Dec 01, 2020 Flap Motor & Aft control stick mount Controls 3 2   
47     Nov 28, 2020 ELT Avionics 2 2   
46     Nov 28, 2020 Install Heater Core Cabin AIr 5 11   
45     Nov 28, 2020 Prelim work on Firewall Firewall 9.0 7   
44     Nov 18, 2020 GMU 11 Avionics 1 1   
43     Nov 18, 2020 Rudder Cables rear fuselage Controls 4 4   
42     Nov 06, 2020 Gather the wire bundles and inspect the Panel Avionics 3 7   
41     Nov 02, 2020 Wiring Avionics 7 4   
40     Nov 01, 2020 Paint Booth Paint / Decals 4   
39     Nov 01, 2020 Flap & Aileron Alignment Wings 12 6   
38     Oct 31, 2020 Wing Tips Wings 21.5 19   
37     Oct 16, 2020 Wing & Taxi Lights Lighting 11.5 10   
36     Oct 16, 2020 Remove Right wing tank for Leak check Fuel System 6 6   
35     Sep 23, 2020 Elevator Empennage 38 24   
34     Sep 02, 2020 Canopy Fuselage 4.0 5   
33     Aug 23, 2020 More Moving Workshop 4.5 8   
32     Aug 17, 2020 Right aileron Wings 3 4   
31     Aug 11, 2020 Finish the Seats Interior Finish 5.0 2   
30     Aug 05, 2020 Set up Workshop 6.0 1   
29     Jul 31, 2020 Time to Move Workshop 9.0 4   
28     Jul 31, 2020 Throttle & Brake Quadrant Controls 10.5 11   
27     Jul 28, 2020 SB # 18 Insufficient swaging of oval sleeves on the rudder cables Controls 4.5 3   
26     Jul 22, 2020 Starting AIr System Fuselage 6.0 3   
25     Jul 22, 2020 Better Sound Proof Interior Finish 3.0 2   
24     Jul 14, 2020 Setting control Tubes (part 2) Controls 6 2   
23     Jul 01, 2020 Rudder Pedals Controls 6.5 3   
22     Jun 30, 2020 Take Apart the Brakes & Axle Landing Gear 1.5 0   
21     Jun 30, 2020 Setting Control tubes Fuselage 5.0 3   
20     Jun 26, 2020 Pitot Installation Wings 25 6   
19     Jun 26, 2020 Front and Rear Seats Interior Finish 31.5 17   
18     Jun 26, 2020 Flaps Wings 21.5 6   
17     Jun 26, 2020 Ailerons Wings 10 5   
16     Jun 26, 2020 Spats (Wheel Pants) Workk Landing Gear 21 11   
15     Jun 20, 2020 Additional Hardware Tools 5 2   
14     Jun 17, 2020 Elevator Empennage 1   
13     Jun 17, 2020 FIlling in rivets, adding Hardware Wings 6   
12     Jun 16, 2020 Assemble the Gear Parts Landing Gear 24.5 11   
11     Apr 28, 2020 Vertical Stabilzer Empennage 22.5 7   
10     Apr 10, 2020 Rudder Empennage 34 11   
9     Mar 25, 2020 Horizontal Stabilzer Empennage 36.5 18   
8     Mar 23, 2020 Inventory Inspection 40.5 5   
7     Mar 10, 2020 Kit Arrives!! Workshop 6.7 7   
6     Feb 08, 2020 Ordered Fire Wall Forward kit & Interior Kit Engine 1.0 0   
5     Feb 08, 2020 FInal Quick Build Purchase Research 1.0 1   
4     Jan 02, 2020 Deposit Avionics 11.0 1   
3     Jan 02, 2020 Additional Tools Tools 12 1   
2     Sep 24, 2019 What to Build? Research 1   
1     Sep 24, 2019 Wing Stand and Benches Workshop 36 3   
------------ -------------
Totals1190.7    666   





NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.