Project: BearhawkPatrol     -     Project Summary     - Optional PDF document function
Entry Titles Only           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
37     Feb 01, 2024 Engine Baffles Eng. Baffles 60 $0.00    5   
Modify RV Baffles to fit, create custom fiberglass inlet plenums
 
36     Aug 06, 2023 Carb Airbox Airbox 8 $0.00    1   
Carb airbox from a Husky
 
35     Jul 01, 2023 Engine Mount Engine Mount 80 $0.00    5   
Building new engine mount account AviPro supplied Dynafocal Mount doesn't fit on engine and is a poor design
 
34     Jul 01, 2023 Engine Cowl Engine Cowl 60 $0.00    7   
Aluminum Work associated with engine cowl
 
33     Dec 22, 2022 Avionics and Panel Build Avionics 80 $0.00    4   
Cut Out Panel,Carbon Fiber Overlay, Lots of wiring
 
32     Nov 11, 2022 Flap System Install Flap System 40 $0.00    4   
Hanging flaps and rigging
 
31     Oct 08, 2022 Instrument Panel Fabrication Windshield 25 $0.00    4   
Made trail instrument panel from plexiglas to visualize any clearance issues. Remote electronics will be shelf mounted behind panel.
 
30     Sep 03, 2022 Mounting Windshield Windshield 42 $0.00    8   
Mounting Windshield, requires fairings at wing and at boot cowl interesection
 
29     Jul 03, 2022 Mounting WIngs on Fuselage Wing Mount 100 $0.00    10   
Steps and jigs built to mount wings on fuselage
 
28     Jan 29, 2022 Various Jobs Wing-Left 100 $0.00    0   
 
27     Dec 18, 2021 Everything Aileron Aileron $0.00    9   
The aileron system
 
26     Dec 13, 2021 Engine Stuff Empennage $0.00    1   
Engine Related
 
25     Nov 03, 2021 Tasks Associated with Competing Wings Wings 100 $0.00    18   
Wing Completion
 
24     Nov 03, 2021 Wing Tanks and Related Wing Tanks 54 $0.00    2   
Tanks and fuel bay
 
23     Nov 03, 2021 Wing Construction Wing Tanks $0.00    1   
Misc tasks associated with wing construction
 
22     Oct 07, 2021 Installing Wing Tanks Wing Tanks 6.0 $0.00    9   
 
21     Aug 24, 2021 Flap Pulley Reinforcement Flap System 24 $0.00    1   
Fuselage flap pulley needs reinforcement to prevent tear out of mounting bolt.
 
20     Aug 10, 2021 Completing the elevators Elevators 24 $0.00    3   
I prepped the elevators today for pouring the leading edge weights. First I tacked in .025" steel plates. I brazed around the edge and smoothed them out. I was careful to keep the plates below the level of the tube edges so when the fabric is shrunk it will not contact the plates. Finally I welded in three cross dowels to give the lead an anchor.
 
19     Jun 19, 2021 Autopilot installation Autopilot 41 $0.00    10   
Adding three servos for autopilot
 
18     Apr 01, 2021 Access Panels and Inspection Inspection 20 $0.00    1   
Creating inspection rings and access panels
 
17     Mar 23, 2021 Interior Panels and Finish Interior Finish 80 $0.00    2   
Finished interior with .020 aluminum painted Bearhawk gray. Applied Bearhawk logo to baggage compartment wall. Welded tabs for mounting all panels. Finished throttle cover in .090 thick aluminum, applied stencil.
 
16     Nov 16, 2020 Custom Pilot Seat, Standard Passenger Seat Seating 80 $0.00    8   
Creating a new seating arrangement for the pilot to fix the bad ergonomics on the kit design. Carbon fiber bucket will get Oregon Aero cushions. Seat moves easily and also tips up to allow great access for passenger. New, narrower weldment required for pilot seat.
 
15     Nov 14, 2020 NACA Inlet Boot Cowl 6 $0.00    1   
Added NACA inlets to boot cowl for human cooling. Fun CNC project.
 
14     Oct 24, 2020 Finished cutting the landing gear clearance Landing Gear 5.5 $0.00    2   
Using custom jugs I cut clearance holes for landing gear and CNC'd the mating gasket rings. I will use a thin rubber for the gasket. The parallel handi-lift really works well for lifting the fuselage during work on the landing gear.
 
13     Oct 16, 2020 Jig to Simulate Landing Gear Stance Landing Gear 4.2 $0.00    3   
In order to cut the clearance holes in the lower boot cowl for the landing gear it is necessary to simulate the landing gear in the fully compressed and extended positions. This jig allows one to simulate that without physically loading the airplane to maximum gross weight.
 
12     Oct 14, 2020 Installing Pilot Doors and Right Window Door&Window 42 $0.00    4   
Decided to make a lockable baggage compartment and to streamline the door latch mechanism as originally designed. Using a nice cam over lock which securely pulls the baggage compartment closed. Pilots door now has a very smooth locking mechanism and nice window latches.
 
11     Sep 23, 2020 Pulley Guard for Flaps Flap System 6.1 $0.00    1   
Pulley guard. One piece one each side of pully. Cotter pins through holes for control cable constraint.
 
10     Sep 23, 2020 New Shop at Airport New Shop $0.00    2   
Purchased hangar at airport for new shop
 
9     Sep 23, 2020 Pilot and Baggage Door Fuselage 28 $0.00    1   
Aluminum for pilot and baggage door fitted. Need to add locking mechanisms
 
8     Aug 01, 2020 Airplane Rotator Rotisserie 24.2 $0.00    4   
Build a rotisserie which allows for easy access to the airplane while building and covering. Harbor freight engine stands were modified along with a custom indexing system using a agriculture PTO drive and a 40 tooth gear with a spring loaded pin for positive indexing.
 
7     May 03, 2020 Left Rear D Window Install Fuselage 18 $0.00    10   
Made the mounting of the D window so it would flush out with the pilot window ahead of it. Final plexiglass and fabric to do before final riveting.
 
6     Mar 07, 2020 Wedge filler on boot cowl wrap around Boot Cowl 3.0 $0.00    2   
Small tapered wedge requires on bottom of boot cowl wrap around to tunnel. Only one side required this.
 
5     Dec 14, 2019 Boot Cowl Installation Boot Cowl 38 $0.00    10   
Installing Top Boot Cowl and Cutout Panel
 
4     Nov 03, 2019 Tunnel and Bottom Boot Cowl Tunnel 11 $0.00    8   
Bottom tunnel mounting and mating to bottom boot cowl aluminum
 
3     Oct 10, 2019 Installing Fuel System Fuel System 85 $0.00    14   
Bearhawk Patrol has front and back fuel feeds from each overhead tank. Used 5000 series aluminum tubing with minimum joints. Gold cube fuel flow transducer installed just before firewall.
 
2     Oct 10, 2019 Installing brake system Brakes 45 $0.00    13   
Brake system design and install. Uses a parking brake.
 
1     Oct 10, 2019 Designing and Installing Custom Throttle Quadrant Throttle 43 $0.00    6   
Designed and built a custom throttle quadrant to solve problem of interference with flap handle.
  ------------ -------------- ------------- Totals1383    $0.00    194   




NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.