226     Apr 25, 2023 Panel Layout Instrument Panel 36 $0.00    5   
The pictures gathered here show the end stage of the panel design development. It was driven by two primary factors: 1) Requirements of a minimal Corvair engine driven aircraft, 2) Engine control and instrumentation layout similar to C150/152 which I did my primary flight training in and will no doubt fly in from time to time. Development of this panel has gone through multiple iterations and the final version shown here as design drawing is based on analysis of circuit requirements for running the Corvair engine's critical electrical systems (ignition and power generation) and the non-critical electrical systems (lighting and avionics). I decided for traditional panel over software driven multi-display systems, though power and space is provided for COTS devices to run foreflight. I have spent at least 36 hours on the design and accumulation of tools and materials which converge on the panel itself. All electrical is being installed to standards defined in AC 43.13-B
 
225     Apr 21, 2023 Forward Fuselage Fuselage 1.5 $0.00    2   
Prepare forward fuselage floor for buildup and installation.
 
224     Apr 05, 2023 Seat Pan Support Area Fuselage 2 $0.00    3   
Marked (with a rivet spacer fan) and drilled holes in seat pan support panels / support brackets prior to install. Drilled out all holes to final size and then deburred all holes. Drilled extra attach holes in both vertical support channels on the rear fuselage because lower left / lower right holes have AN nuts so close behind the hole that rivet installation is not possible from outside, and inside the channel the rivet gun head will not fit. The extra hole is in middle of bottom row and make up for the missing outside lower rivet.
 
223     Apr 04, 2023 Seat Pan Support Fuselage 2.5 $0.00    6   
Outboard seat pan supports have to be drilled to fasten the seat pan down. A5 pitch 40 rivets are used. Pilot holes #40, then drilled out to A5 size. Not deburred yet.

Also drilled out the pilot holes for the lower seat belt harness attach point, starboard and port sides.
 
222     Apr 01, 2023 Nut Repair Fuselage 5 $0.00    6   
Minor travails and new access panels to very tight spaces:
When drilling a hole through the side channel upright on my fuselage, down by the landing gear fitment where the holes go to attach the seat pan, I noticed that the drill seemed to not want to go through the sheet-metal -- about like when metal is a bit thicker. So I used a little bit more force. But it turned out it wasn't sheet-metal. On inspection I saw that I had drilled into the nut of the top AN 4 bolt of the rear part of the starboard fitment that connects the front fuselage to the rear fuselage. I couldn't tell how deep I had drilled into the nut or maybe even the bolt. I was unwilling to ignore potential damage to part of the system that connects the rear fuselage to the front (everything might NOT be all right). So began an hours long endeavor to remove the bolt and nut to inspect and replace. It involved getting a 20 ton press, buying a wrench or other tool that I could bend in the press to a U-shape to be able to get back behind the side channel via the narrow area left between baggage floor and seat pan rear support. I knew that I could put an access panel instead and approach it that way. But I started with the "make your own tool way". I managed to remove the nut from the bolt, but had so much trouble getting a new one back on with a washer. Then my custom wrench head got stuck. I was forced to make an access panel. Once the access panel was open it took a whole 2 minutes to remove the stuck tool and reinstall the bolt and torque it correctly.
 
221     Mar 01, 2023 Critical Electrical And Panel Area Landing Gear 15 $0.00    9   
Bought 4x8 sheet of .025 from Airparts. Didn't have metal brake so used rubber mallet method of bending instrumentation wiring support pans between firewall and panel. Bent against grain by accident, however do not believe will be a problem given the non-structural nature and very low weight of service loops of wiring the pans will support. The battery, contactor, and distribution bus is mounted behind the passenger seat. Battery location reinforced with .092 extruded L and wrapped tight with sheet metal to resist high g loads in sudden stop situation. Fabrication and planning of these items took a long time. Acquired a small sheet metal bender for the smaller brackets that the bus and the contactor are mounted on. Used .016 L-angle as "finger" to get appropriate bend radius on those items. Used rubber mallet to create flange that cheap metal brake design doesn't support.
 
220     Feb 11, 2023 Landing Gear / Wheels / Tires Landing Gear 3.5 $0.00    10   
Assembled wheels into tires. Ran 1/16 in. bead of Permatex Ultra Grey (82194) high torque gasket maker around the face of one side of the wheel assembly to ensure no leakage between wheel halves. Placed lower wheel on 2x4 wood blocks under tire. Placed upper wheel half onto lower and bolted tight with all six bolts. Then placed the rubber o-ring at the wheel join. Used a lot of watery dish soap as lubricant during tire inflation, used ratchet strap to compress center of tire during inflation to seat bead onto rim.

Gear installation preceded tire / wheel assembly.
 
219     Jul 21, 2022 Hangar Move In, Part One Workshop 4 $0.00    2   
Build rack to hold completed airframe subcomponents. Move engines to hangar.
 
218     Jul 15, 2022 Hangar Rented Workshop 2 $0.00    4   
Found a commericial hangar at KRVS in Tulsa. Rented from Bill Denton, Denton and Associates LLC. Bill is a recipient of the Charles Taylor Mechanic Award.
 
217     Jun 12, 2022 Rear Fuselage Fuselage 2.5 $0.00    2   
Installing flaperon actuator mount plate (flap function) and control tubes for flaperons (aileron function).
 
216     May 03, 2022 Rear Fuselage Fuselage 1.5 $0.00    3   
Preparing rear fuselage baggage area rear panel for installation.
 
215     Feb 21, 2022 Rear Fuselage Fuselage 10 $0.00    4   
The fuselage pieces, which have been riveted as subcomponents, are here assembled according to Zenith instructions and readied for riveting.
 
214     Jan 27, 2022 Fuselage Sides Fuselage 3 $0.00    3   
Setting up L-angle and longeron on the passenger and pilot fuselage side skins. Also fit the rear fuselage front upright to the front edge of the fuselage. These parts are match drilled but have to be deburred and, on occasion, chased, before riveting.

Also shown is the William Wynne Corvair flight engine in temporary storage before installation. Each day it gets lovingly dusted.
 
213     Dec 22, 2021 Fuselage Top Fuselage 1.5 $0.00    2   
Various L-angle placement and trimming, baggage support. Some holes need to be drilled out to size, deburred.
 
212     Dec 21, 2021 Fuselage Top Fuselage 1 $0.00    1   
Drilling, deburring. Re-clecoing.
 
211     Dec 20, 2021 Fuselage Bottom and Top Fuselage 3 $0.00    4   
Riveted fuselage bottom pieces together: longerons and z channel around the access hatch. Layout top fuselage skin and longerons. Cleco together.
 
210     Dec 16, 2021 Fuselage Bottom Fuselage 1.7 $0.00    3   
Laying out z channel on bottom of fuselage. The note about missing part was wrong.
 
209     Dec 14, 2021 Fuselage Bottom Fuselage 1.5 $0.00    2   
Attaching fuselage bottom to the longerons. Parts in storage. They were soon to be moved to Tulsa, OK in March.
 
208     Dec 03, 2021 Pilot Side Wing Wings 1.5 $0.00    2   
Wing complete.
 
207     Nov 16, 2021 Pilot Side Wing Wings 2 $0.00    2   
More wing root work. The sheet metal is now fully in place. It will not be riveted in until final assembly when the wings have been attached to the fuselage, the controls rigged, and all connections tested (including fuel lines).
 
206     Nov 08, 2021 Pilot Side Wing Wings 1.5 $0.00    1   
Wing root sheet metal work.
 
205     Oct 24, 2021 Pilot Side Wing Wings 2.5 $0.00    2   
Connector to plug into AeroLED wingtip lights.
 
204     Oct 23, 2021 Fuel Line Wings 3 $0.00    8   
Used Earl's tooling to fabricate braided steel fuel lines using Earl's AN fittings. Used proper tools (line cutter and fitting clamp). Leak test with 100LL to follow.
 
203     Oct 20, 2021 Build and Install Fuel Tank Wings 4 $0.00    6   
Wing was a lot easier the second time; should be done with this wing soon. The deeper consideration, basic learning, tool and part acquisition was on the first wing. This one is all about refinement and getting better at doing something the second time through.

Installed fuel sender with appropriate aviation grade sealant.

Wired according to plans and crimped according to 43.13-1b.
 
202     Oct 06, 2021 Pilot Side Wing Wings 3 $0.00    4   
Top wing skin work. Including setting up cover for fuel tank.
 
201     Sep 27, 2021 Pilot Side Wing Wings 2 $0.00    3   
More drilling to final size and deburring.
 
200     Sep 25, 2021 Pilot Side Wing Wings 1.5 $0.00    2   
Leading edge skin work.
 
199     Sep 10, 2021 Pilot Side Wing Wings 3 $0.00    10   
Wiring runs along rear spar bolted in with AN hardware and MS21919 clamps. Pitot tubes secured per manufacturer instructions.
 
198     Sep 09, 2021 Pilot Side Wing Wings 15 $0.00    1   
Front skins and trailing edge work.
 
197     Aug 24, 2021 Pilot Side Wing Wings 3 $0.00    3   
Bottom skin and rear channel riveting.
 
196     Aug 15, 2021 Pilot Side Wing Wings 3.5 $0.00    5   
Wing bottom skins.
 
195     Aug 09, 2021 Pilot Side Wing Wings 3 $0.00    4   
More riveting of pilot side bottom skin.
 
194     Aug 06, 2021 Pilot Wing Wings 2.5 $0.00    4   
Working on drilling, deburring, and riveting front ribs. In last picture the main spar attachment for the struts is visible. It was attached with AN-4 bolts and nylon lock nuts per instructions.
 
193     Aug 04, 2021 Pilot Side Wing Wings 1.5 $0.00    1   
Initial skeleton of pilot side wing.
 
192     Jul 23, 2021 Pilot Wing Skeleton Wings 2 $0.00    1   
Cleco together the pilot side wing skeleton, attach both front and rear ribs, attach the rear spar and prepare for riveting.
 
191     Jul 12, 2021 Pilot Side Wing Wings 2.5 $0.00    4   
Wing skeleton layout, including nose ribs.
 
190     Jun 22, 2021 Passenger Side Wing Wings 4.5 $0.00    9   
Wing tip electrical.
 
189     Jun 22, 2021 Passenger Wing Tip and Light Lighting 10 $0.00    9   
Wired and grounded using techniques from AC 43.13-B and instructions from manufacturer AeroLED.
 
188     Jun 08, 2021 Passenger Side Wing Wings 2 $0.00    4   
Fuel tank fittings.
 
187     May 29, 2021 Wing Root Wings 3 $0.00    2   
Wing root fabrication and sheet metal install. Required using fluting pliers. Clamp root skin into place. Drill #40 pilot holes into fluted support l-angle and cleco.
 
186     May 13, 2021 Passenger Side Wing Wings 3 $0.00    5   
Installing the wiring for the fuel sender, as per requirements of 43.13-1b table 11-14.
 
185     Apr 19, 2021 Nutplates in Wing Access Panel Wings 1.5 $0.00    3   
Drilling nutplate holes for fuel tank access panel using standard jig tool.
 
184     Mar 14, 2021 Engine on Test Stand Engine 8 $0.00    2   
At William Wynne's hangar, supervised top-end build and test run. Finished installing: Oil pan, starter bracket / ground bar, starter. Filled with oil. Put on test stand and rotated prop for 30 minutes by hand while running oil pump with drill adapter. Installed distributor at correct test run position.

Test run commenced about 300pm. Engine started within 2 seconds. Ran at varying RPM for 30 minutes.

Adjusted heavy duty oil pump bottom plate to account for slightly stiff rotation to bring it into a level of resistance to rotation that is consistent with other engine builds. Removed from test stand and prepped engine for transport back to Texas.
 
183     Mar 13, 2021 Top End / Accessory Attachment Engine 9 $0.00    8   
Assembled top end of motor at William Wynne's hangar as supervised build. These components assembled as per specification in the SPA Corvair Engine Assembly Manual except when William recommended and showed newer, improved methods.
 
182     Feb 27, 2021 Final engine assembly prep Engine 2 $0.00    1   
Ensure all tools and materials per the final assembly list in the SPA Corvair Engine Assembly Manual and per William Wynne's required tools and materials list put together and made ready to transport to Green Cove Springs, Florida.
 
181     Jan 23, 2021 Passenger Wing Wings 2.5 $0.00    3   
Finish up riveting bottom skin on passenger wing.
 
180     Jan 20, 2021 Passenger Wing Wings 1 $0.00    2   
Preparing to rivet bottom skin of passenger side wing to the skeleton. Beginning the rivet process.
 
179     Jan 09, 2021 Skin on Wing Wings 3.5 $0.00    6   
Unpack bottom wing skin for installation. Place skin with clecos. Rivet skin into place in all pre-drilled holes.
 
178     Jan 08, 2021 Rear Spar Work Wings 1.7 $0.00    3   
Fastened inboard and outboard rear spar together. A5 rivets in doubler.
 
177     Dec 06, 2020 Starboard Wing Skeleton Assembly Wings 2.5 $0.00    4   
Unpacked the wing skeleton from the crate, organized parts and set them aside in order of assembly.

Clecoed wing ribs to main and trailing spar. Checked for level.
 
176     Dec 05, 2020 Slats and Flaperons Wings 1.5 $0.00    3   
Installing tips
 
175     Dec 03, 2020 Slats and Flaperons Wings 3 $0.00    5   
Install tips
 
174     Nov 21, 2020 Slats Wings 2 $0.00    3   
 
173     Nov 19, 2020 Slats Wings 3 $0.00    4   
 
172     Nov 17, 2020 Slats Wings 3 $0.00    7   
 
171     Nov 16, 2020 Slats Wings 1 $0.00    1   
 
170     Nov 13, 2020 Slats Wings 6 $0.00    11   
Further assembly of slats. This was a bit trickier than I thought and it didn't come together until I figured out the correct order to attach the clecos.
 
169     Nov 11, 2020 Slats Wings 2 $0.00    4   
Attaching the doubler to the slat front top / bottom bend.
 
168     Nov 10, 2020 Slats Wings 2 $0.00    1   
 
167     Nov 06, 2020 Flaperons Wings 4 $0.00    12   
 
166     Nov 04, 2020 Flaperons Wings 2 $0.00    3   
 
165     Nov 01, 2020 Flaperons Wings 3 $0.00    7   
 
164     Oct 30, 2020 Flaperons Wings 1 $0.00    2   
 
163     Oct 29, 2020 Flaperons Wings 1 $0.00    1   
 
162     Oct 28, 2020 Flaperons Wings 2 $0.00    5   
 
161     Oct 26, 2020 Flaperons Wings 2 $0.00    6   
 
160     Oct 24, 2020 Flaperons Wings 3 $0.00    10   
 
159     Oct 21, 2020 Harmonic Balancer Final Install Engine .5 $0.00    3   
Note to self: Write SPA a note about their install documentation. 2 inch install bolt does not penetrate far enough into crankshaft to tighten balancer down correctly (at least on my crankshaft). Stripped two inch bolt.
 
158     Oct 20, 2020 Harmonic Balancer Install Engine 2 $0.00    9   
 
157     Oct 10, 2020 Finish Cylinder Installs Engine 5 $0.00    5   
 
156     Oct 08, 2020 Parts Engine .5 $0.00    7   
 
155     Oct 05, 2020 Piston / Cylinder #1 Install Engine 1.5 $0.00    4   
 
154     Sep 30, 2020 Piston / Cylinder #1 Install Engine 1.5 $0.00    11   
 
153     Sep 28, 2020 Piston / Cylinder #1 Install Engine 2 $0.00    11   
 
152     Sep 27, 2020 Piston / Cylinder Install Prep Engine 1 $0.00    2   
 
151     Sep 22, 2020 Piston / Cylinder Install Prep Engine 1 $0.00    2   
 
150     Sep 19, 2020 Piston / Cylinder Install Prep Engine 2.5 $0.00    7   
 
149     Sep 17, 2020 Piston / Cylinder Install Prep Engine 1 $0.00    8   
 
148     Sep 09, 2020 Inventory Fuselage 3 $0.00    5   
 
147     Aug 31, 2020 Inventory Fuselage 3 $0.00    4   
 
146     Aug 30, 2020 Inventory Fuselage 4 $0.00    11   
 
145     Aug 22, 2020 Inventory Fuselage 2 $0.00    3   
 
144     Aug 20, 2020 Inventory Fuselage 2 $0.00    1   
 
143     Aug 18, 2020 Airframe Delivery at Home Fuselage 1 $0.00    7   
 
142     Aug 17, 2020 Pick up rest of airframe at Zenith Fuselage 1 $0.00    9   
 
141     Aug 09, 2020 Parts Storage / Reorg Workshop 1 $0.00    3   
 
140     Aug 01, 2020 Elevator Empennage 2 $0.00    11   
 
139     Aug 01, 2020 Elevator Riveting Empennage 2.5 $0.00    4   
Riveted the elevator closed. Riveted top and bottom and back center bracket onto elevator. Did a demo video of riveting, but rivet gun was angled badly. So it's a nice video of how to NOT rivet. Decided to drill out, caused hole problems. Was going to do a doubler, but decided not to in the end. A5 seems okay. Would have been better to leave it not seated perfectly. Made note to check this out often during inspections. Will replace if any issue shows up. But it is not a high stress point and nothing will happen if it fails in flight (which it won't). One of 3 minor drilling mistakes on the elevator. And, as usual, it was done in haste not taking enough time to think about what I was doing (that is ALWAYS the root cause of errors so far).
 
138     Jul 31, 2020 Elevator Empennage 1 $0.00    1   
 
137     Jul 29, 2020 Elevator Empennage 2 $0.00    4   
Reassembled for final riveting. Fattened WRONG hole of an L angle tab that connects the spar with the port elevator end rib. Simply drilled another rivet hole enough below to work. Painted elevator hinges to inhibit corrosion. Riveted skeleton. Riveted wire to front spar.
 
136     Jul 28, 2020 Elevator Empennage $0.00    6   
 
135     Jul 27, 2020 Elevator Empennage 1 $0.00    2   
 
134     Jul 27, 2020 Elevator Empennage 1.5 $0.00    2   
Place servo into the correct location, set the length of the clevis rod, attach to trim tab, and begin testing and adjustment to get to best travel distance for up and down deflection targeted in the plans. This servo Zenith shipped does not have quite the range specified in the plans though. I'm within 5 degrees up and 8 down. I'll enter exact numbers in a later entry. Run the wire out to the center section of the elevator. Link to test on youtube: https://youtu.be/F_ooA6mKN88

 
133     Jul 26, 2020 Servo Mount / Trim Tab Safety Wire Empennage 2 $0.00    10   
 
132     Jul 26, 2020 Elevator Empennage 2 $0.00    5   
Set up nutplates around access hole. Place and mark. Drill. Rivet (3/32)
 
131     Jul 25, 2020 Trim Tab Wiring / Access Nut Plates Empennage 2 $0.00    10   
 
130     Jul 25, 2020 Elevator Servo Empennage 1.5 $0.00    6   
Put heat shrink tubing onto servo electrical wire connections. Drilled out access cover plate holes to A5 rivet size (5/32), because the nut plate holes are 8-32 size. Safety wire pliers arrived.
 
129     Jul 23, 2020 Trim Tab Servo Wiring Empennage $0.00    6   
 
128     Jul 23, 2020 Servo Wiring Empennage 1 $0.00    5   
Use DMC crimper to crimp D-subminiature connectors onto Ray Allen Servo wires. Note colors / markings for future routing of wires up to cockpit!
 
127     Jul 18, 2020 Elevator Empennage 1 $0.00    3   
 
126     Jul 18, 2020 Elevator Deburring Empennage 2 $0.00    4   
Deburring elevator holes. Electrical stuff for Ray Allen Servo wire connecting starting to arrive (after much research).
 
125     Jul 17, 2020 Elevator Empennage $0.00    1   
 
124     Jul 15, 2020 Elevator Empennage $0.00    7   
 
123     Jul 15, 2020 Elevator Empennage 2 $0.00    5   
Final drilling to A4 for a few remaing holes. Needed angle drill. Disassemble for deburring. Drilled out nose rib for electrical wire grommet. Cylinder hold down clamps fabricated. Received DMC crimper.
 
122     Jul 12, 2020 Elevator Empennage 2.5 $0.00    5   
 
121     Jul 11, 2020 Trim Tab Wiring / Cylinder Hold down fabrication Empennage 2 $0.00    4   
 
120     Jul 09, 2020 Elevator Empennage 2.5 $0.00    5   
I have finished all the drilling, and built the control arm to the correct length to control my trim tab with the Ray Allen servo. This necessitated figuring out the in and out wiring, and measuring distances on the servo actuator arm to make sure I got it just in the middle for installation. A 9V battery runs in in and out. I recorded the polarity for both on the data sheet. Ready for inspection to make sure I didn't miss something, then disassembly and deburring.
 
119     Jul 08, 2020 Elevator Servo Placement Empennage 2 $0.00    7   
I've had the most fun with this servo, where I went off and did a fair bit of learning about aircraft wiring: https://corvair750.com/diary/07-02-2020-aircraft-wiring/

Spent some happy time in the shop drilling the holes for the Ray Allen servo used for trim tab control.
 
118     Jun 27, 2020 Cylinders Engine 1.5 $0.00    8   
 
117     Jun 27, 2020 Painting Cylinders and Studs Engine 1.5 $0.00    6   
Painted some cylinders and painted also the head studs. Head studs can tend to rust so I just painted them over flat black. Same with cylinders, they are prone to rust without paint. High temp engine paint with ceramic -- 500 degree. Note ingenious paint fixture, credit to Billy Kerchner who is building a Corvair powered Sonex (see his posts on WW FlyCorvair facebook group).
 
116     Jun 26, 2020 Cylinders Engine 2 $0.00    13   
 
115     Jun 26, 2020 Cylinder cleaning Engine 2 $0.00    13   
Finished control arm / clevis opening with filing. Then, change of pace: Working on prepping my 3.0L cylinders for installation on my short block Corvair. This is preparation for painting. Was concerned about the step area along the cylinder skirt and asked William Wynne about it. The gasket in that area is RTV green, about a 1/16 bead. No worries there. The areas near the step that are machined out near the stud channels are there so the cylinder does not vibrate against the stud in operation.
 
114     Jun 25, 2020 Elevator Empennage 1 $0.00    3   
 
113     Jun 25, 2020 Elevator Trim Tab Control Empennage $0.00    6   
Drilling and forming the trim tab control arm hole on the trim tab spar. Starting to figure out the Ray Allen control servo.
 
112     Jun 20, 2020 Elevator Empennage 1.5 $0.00    4   
More drilling of elevator in tight spots, drilling out to A4 and finished bracket work.
 
111     Jun 18, 2020 Elevator work Empennage 2 $0.00    4   
I had to order an angle drill because it's just not possible to drill out some holes in the elevator without one. Trying to use a regular drill risked dinging up the spars and skins. So part of the delay of getting the elevator put together was researching tools. In this case the nice angle pneumatic drill. Definitely worked as needed once I got all the bits I needed which I hadn't ordered when I originally ordered the drill ...
 
110     Jun 14, 2020 Elevator, Trim Tab, and Engine Stand Empennage 2 $0.00    5   
Worked on the elevator trim tab, and drilling out holes to A4 and A5 and then put together the engine stand. Coffee kept me up late this night.
 
109     Jun 13, 2020 Elevator Engine 1 $0.00    4   
 
108     Jun 12, 2020 Elevator Trim Tab Tail Feathers 1.5 $0.00    0   
Drilled out to A4 and clecoed the trim tab into position. youtube:
 
107     Jun 10, 2020 Parts Inventory Engine 1 $0.00    5   
 
106     Jun 10, 2020 Parts from Green Cove Springs Engine .5 $0.00    1   
Received various engine parts for Corvair powerplant.
 
105     Jun 08, 2020 Elevator Empennage 2.5 $0.00    10   
 
104     Jun 08, 2020 Elevator and Engine Parts Inventory Tail Feathers 4 $0.00    7   
Worked on the passenger side nose skin (in some pics elevator is upside down -- trim tab is pilot side). And the cylinder kit for my 3.0L engine. Once the elevator is done I'm moving on to engine construction, get the cylinders and pistons in. Then also got the trim tab placed and ready for drilling.
 
103     Jun 05, 2020 Elevator Empennage 2 $0.00    7   
 
102     Jun 05, 2020 Elevator Nose Skin / Engine Components Tail Feathers 2 $0.00    2   
More drilling on elevator nose skins (dimple drill first, then remove and drill all the way for proper alignment). Fit perfect, drilled out to A4.

Corvair engine parts arrived from SPA.
 
101     Jun 04, 2020 Elevator Empennage 1.5 $0.00    5   
 
100     Jun 03, 2020 Elevator Trim Tab Channel / Nose Skin Placement Tail Feathers 3 $0.00    3   
Got trim channel drilled out and placed. Started nose skin placement. Came up with a way to get holes on skin drilled perfectly even though removing the clecos on the spar leads to minor (.5 to 1 mil) misalignments of spar and tip rib. Basically: do not drill all the way through the skin with the slightly misaligned skeleton because the skeleton would have possibly misaligned holes with skin. Drilled part way through skin, removed, drilled rest of way. Worked perfect: Absolute alignment of holes in skin and skeleton when clecoed together. (have vid hopefully on youtube someday ...
 
99     Jun 02, 2020 Elevator Empennage 1 $0.00    2   
 
98     Jun 02, 2020 Trim Tab Channel Tail Feathers 1 $0.00    0   
Cut new block and sanded so I could use mallet on trim tab channel to make it fit outboard tip rib.
 
97     Jun 01, 2020 Elevator Empennage 1.5 $0.00    9   
Resolving issues with a factory made part that doesn't have enough joggle to fit in the end rib.
 
96     Jun 01, 2020 Trim Tab Channel Issue Tail Feathers 1 $0.00    3   
Ran into a problem with the trim tab channel. My solution of whacking on the aluminum a bit to get the "joggle" of the outboard part of the channel smaller to fit into the tip rib correctly was verified by Roger Dubbert at Zenith via email. Measuring, making a form block. The outboard side was about 2 mils to wide ...
 
95     May 28, 2020 Cylinder Assembly Research Engine 1 $0.00    1   
Cylinder assembly reading, SPA manual pp124 to pp143
 
94     May 25, 2020 Elevator Empennage 3 $0.00    9   
 
93     May 25, 2020 Horizontal Stabilizer Empennage 2 $0.00    8   
More work on elevator, which is more delicate and complicated than I expected. Ordered a pneumatic angle drill because of tight quarters drilling so I can avoid drilling errors / damage to parts with drills that are too big. Ran into an issue with the CH750 prefab tip ribs not fitting correctly with the trim tab channel ends, which are slightly bent to accommodate fitting inside the tip rib flanges. Aligning the center of the trim tab channel flange properly with the third hole in the tip rib causes the tip rib flange to bulge considerably. So I have a technical question submitted to Zenith about it.
 
92     May 23, 2020 Elevator Empennage 2 $0.00    3   
 
91     May 20, 2020 Elevator Empennage 1 $0.00    9   
 
90     May 20, 2020 Horizontal Stabilizer Empennage 1.5 $0.00    4   
Setting up elevator hinge pins for drilling, cut one too much based on watching the homebuilthelp video. Had to order replacement as I was unwilling to compromise on strength in this area, though honestly I don't think stress tolerances would have changed much. But I didn't do calculations so .... Pictures show difference between cut and uncut. I didn't like that the A5 holes on the end would be so close to the cut end. Even though it's was within acceptable minimum distances for the material.
 
89     May 19, 2020 Elevator Work Empennage 3 $0.00    8   
 
88     May 19, 2020 Horizontal Stabilizer Empennage 3 $0.00    6   
Skin and skeleton drilling.
 
87     May 15, 2020 Elevator Work Empennage 2 $0.00    2   
 
86     May 13, 2020 Assembly Research Engine 1 $0.00    1   
Studied cylinder assembly procedure. pp103 to pp 124
 
85     May 11, 2020 Corvair 3.0L Cylinder Set Engine .5 $0.00    3   
Ordered 3.0L Corvair Cylinder Set for TZero
 
84     May 09, 2020 Elevator Empennage $0.00    2   
 
83     May 06, 2020 Elevator Work Empennage $0.00    8   
 
82     Apr 30, 2020 Horizontal Stabilizer Empennage 2 $0.00    2   
Elevator skeleton construction and some skin placement.
 
81     Apr 22, 2020 Horizontal Stabilizer Empennage 1 $0.00    1   
Layout of elevator skeleton and begin cleco-ing together.
 
80     Apr 19, 2020 Horizontal Stabilizer Empennage 3 $0.00    5   
Riveting the top skin onto the stabilizer skeleton. Finished it up!
 
79     Apr 19, 2020 Horizontal Stabilizer Empennage 2 $0.00    7   
Riveting the stabilizer skin on, bottom side first.
 
78     Apr 17, 2020 Horizontal Stabilizer Empennage 2 $0.00    3   
Reassemble for riveting.
 
77     Apr 15, 2020 Horizontal Stabilizer Empennage 3 $0.00    3   
Deburring the pieces.
 
76     Apr 13, 2020 Horizontal Stabilizer Empennage 2.5 $0.00    4   
Drilling skins and clecoing with good straps.
 
75     Apr 12, 2020 Horizontal Stabilizer Empennage 1.5 $0.00    2   
Straps that don't work. Must have ratchet type.
 
74     Apr 11, 2020 Horizontal Stabilizer Empennage 2 $0.00    3   
Bottom skin work, drilling.
 
73     Apr 09, 2020 Horizontal stabilizer Empennage 1.5 $0.00    4   
Working on tip rib angles and skin drilling.
 
72     Apr 07, 2020 Corvair 110HP head overhaul Engine .5 $0.00    1   
Ordered 110HP head overhaul from Sport Performance Aviation.
 
71     Apr 07, 2020 Stabilizer Empennage 1 $0.00    2   
Tip rib placement
 
70     Apr 06, 2020 Horizontal Stabilizer Empennage 2.5 $0.00    6   
Stabilizer ribs. Nose and center section.
 
69     Apr 05, 2020 Horizontal Stabilizer Empennage 1.5 $0.00    4   
Stabilizer front brackets. Stabilizer tip rib mounting front spar L angle. Fun vid here: https://youtu.be/SeWA7AkL2Ds
 
68     Apr 04, 2020 Stabilizer Empennage 3 $0.00    5   
Doublers to A4 size, front and rear spar.
 
67     Apr 01, 2020 Stabilizer Skeleton Empennage 3 $0.00    3   
Initial work putting together the horizontal stabilizer skeleton. Upper and lower doublers on rear spar.
 
66     Mar 29, 2020 Stabilizer Empennage .5 $0.00    1   
 
65     Mar 29, 2020 Parts Inventory Empennage 1.5 $0.00    4   
Unpack, inspect, check inventory. All present and accounted for.
 
64     Mar 27, 2020 Pick Up At Estes Tail Feathers 2 $0.00    4   
Went to Estes in SA to bring Tail kit, Slats / Flaperons kits back to shop. Unloaded parts.
 
63     Mar 26, 2020 ACF-50 Crankshaft Engine .5 $0.00    2   
To protect the crankshaft while waiting further build out I slathered on ACF-50 and got it in the journal areas too.
 
62     Mar 25, 2020 110 HP Head Search Engine 2 $0.00    0   
Found a possible source for 110 Head. Contacted Mike's Corvair Parts. Since I have one head at William's hanger, casting #3856759, Mike is going to look to see if he has one around his main store.
 
61     Mar 07, 2020 Parts Rack Workshop 3 $0.00    2   
High tech finished parts rack made of 2x4. Shop organization.

See this link: https://corvair750.com/personal-blog/finished-parts-rack/
 
60     Mar 06, 2020 Sky Ranch Engine Manual Research 2 $0.00    0   
Introduction. Start Chapter 1: Fatigue Analysis
 
59     Mar 02, 2020 Zenith Order Tail Feathers 1 $0.00    0   
Ordered Zenit Tail / Slats / Flaperons from Zenith. 2 week lead time. Shipping to Estes in San Antonio.
 
58     Feb 29, 2020 Rudder Final Rivet Empennage 3 $0.00    5   
Final riveting of the rudder after returning from Green Cove Springs where I built the Corvair short block.
 
57     Feb 24, 2020 Short Block Engine 1 $0.00    2   
Drive from Green Cove Springs Florida to Seguin Texas. 16 hours starting Sunday at 130pm arriving Seguin Monday about 11am. Move TZero into shop.
 
56     Feb 23, 2020 Short Block Engine 3 $0.00    6   
Rear oil housing install. Oil pickup install. Gold top and gold oil pan.
 
55     Feb 22, 2020 Short Block Engine 12 $0.00    22   
Installed oil gallery plugs. Put TZero in engine build stand. Put in crankshaft, camshaft, and aligned them. Lubed the cam lobes. Closed the case and torqued correctly. Put on 5th bearing case. Drilled and pinned 5th bearing. Put on gasket material and torqued 5th bearing housing correctly. Put on 5th bearing oil seal. Installed safety shaft and prop studs.
 
54     Feb 21, 2020 Case Inspection Engine 3 $0.00    5   
At William Wynne's hangar inspected TZero case for cleanliness. Restored all threads. William removed a case dowl pin from an older case because processing at SPA had lost the dowel pin in mine. Noted my original case bolts / nuts not returned. Other bolts instead.
 
53     Feb 16, 2020 Rudder Parts Trimming / Deburring Empennage 2.6 $0.00    1   
Trim nose skin. Tried to use Homebuilt Help technique of cutting with blade -- I didn't have the right blade. This turned into a PITA because of the excess filing I had to do. When cut with shears, line was straighter in the end and much faster to file. Can't do each hole deburr on skins -- will take too long. Need to give in and do the flat file technique to knock burrs off. Can buff out minor scratches with Scotch-Brite. Still have to deburr skeleton ribs and spar and second side of rear skin.
 
52     Feb 15, 2020 Rudder Rear Skin / Nose Skin Empennage 3.6 $0.00    5   
Drill out all holes to final size, in rear skin and nose skin. Separate parts for deburring. Mark up the nose skin for final cutting.
 
51     Feb 13, 2020 Rudder Rear Skin / Nose Skin Empennage 1.5 $0.00    2   
Put nose skin in place. Drill more holes.
 
50     Feb 10, 2020 Rudder Rear Skin Empennage 1.5 $0.00    4   
Work on rudder rear skin, placement and drilling out pilot holes and A4 holes.
 
49     Feb 08, 2020 Rudder Skeleton Riveting Empennage 2.4 $0.00    5   
Rivet rudder skeleton.
 
48     Feb 02, 2020 Plans analysis / HomebuiltHelp Video Research 2 $0.00    0   
Reviewed the sheet metal materials requirements for scratch building the horizontal stabilizer. Also viewed homebuilthelp video for scratch building metal aircraft. Ordered two more videos, one on tail section, one on rudder. Will review Rudder before riveting skeleton and working on the skins.
 
47     Jan 28, 2020 Rudder work Empennage 2.5 $0.00    2   
Had a problem with drilling too deep on the rudder bottom spar and was unsure of fit for rudder horn against rudder spar. Conferred with Zenith. Horn fits spar perfectly, decided to replace bottom rib instead of using a doubler.
 
46     Jan 27, 2020 Rudder Assembly Empennage 2.7 $0.00    4   
Began drilling rudder spar doublers to spar, marked out locations of ribs.
 
45     Jan 25, 2020 Rudder Empennage 1 $0.00    6   
Uncrate Rudder Kit. Inventory all parts.
 
44     Jan 24, 2020 Unpack Tools Tools 1 $0.00    1   
Unpack and inspect Zenith toolkit. Inventory all quantities.
 
43     Jan 24, 2020 Unpack Tools Tools 1 $0.00    0   
Unpack and inspect Zenith toolkit. Inventory all quantities.
 
42     Jan 18, 2020 Aircraft Fabrication Bench Workshop 8 $0.00    4   
Build aircraft fabrication bench.
 
41     Jan 14, 2020 Toolkit Tools $0.00    0   
Ordered complete toolkit from Zenith for CH 750.
 
40     Jan 14, 2020 Rudder Empennage .5 $0.00    0   
Ordered Rudder Kit
 
39     Jan 13, 2020 Ordered Options Plans Research .2 $0.00    0   
Ordered Options Plans from Zenith, since I want wing lights, dual stick, folding wings, etc
 
38     Jan 12, 2020 Engine Cleaning Engine 1.7 $0.00    0   
More tube, hardware, and valve cover cleaning.
 
37     Jan 10, 2020 Engine Cleaning Engine 3.6 $0.00    3   
Cleaned all kinds of parts including pushrod tubes, head clamps, clamp bolts, baffles, baffle hardware, valve cover. Some pushrod tubes may not be useable because of internal pitting which I don't approve of and find not acceptable. Plan to have William Wynne review.
 
36     Jan 10, 2020 Engine Shipping Engine 2 $0.00    2   
Crated and shipped engine case to Sport Performance Aviation LLC to have it bored to be a 3.0L engine.
 
35     Jan 09, 2020 Engine Cleanup Engine 1 $0.00    0   
Cleaned up case bolts and nuts to fasten case together to ship to Sport Performance Aviation LLC.
 
34     Jan 08, 2020 Engine Parts Engine 2 $0.00    0   
Ordered following components for rebuild from Sport Performance Aviation: Case bore service, case cleaning service, 5th Bearing Crankshaft Service w/New gear, crank core charge (refundable), 5th Bearing Journal - 2nd Gen, 5th Bearing Housing Kit, CV1100 Cam and Lifters, CV200-HV Rear Assembly, CV3301 - E/P distributor, Gold Billet oil pan, Oil pan installation kit, Starter kit
 
33     Jan 05, 2020 Workshop Reorg Workshop 5 $0.00    0   
More stuff, making more space. Need to get rid of a wood lathe, maybe in trade for an orbital spindle sander.
 
32     Jan 04, 2020 Workshop Reorg Workshop 5 $0.00    0   
Removing things I just don't want to be in the way. Like what? Well, like a Kubota T1880, tools to be sold on EBAY (forget facebook marketplace it's useless), and goat feeding supplies (goats donated to another person's cause. Next up will be selling a 2005 Sportster 883 - 1200 conversion. It's got go, and that's what I want it to do (though it was good to me).
 
31     Dec 31, 2019 Engine Cleaning Engine 1.2 $0.00    3   
Clean head attachment hardware. Inspect rocker arms. Not considered useable according to William Wynne's specs. Will have to find replacement. ACF-50 all head attachment components, useable or unuseable. Threw away pushrods.
 
30     Dec 30, 2019 Engine Cleaning Engine .9 $0.00    1   
Clean 6 pushrod tubes.
 
29     Dec 29, 2019 Engine Cleaning Engine 3.5 $0.00    3   
Removed gasket material from rear oil case housing. Wire brushed oil pump housing bolts and cover plate. Cleaned oil pump gears.
 
28     Dec 17, 2019 CH750 Plans / Drawings Research 2 $0.00    0   
Begin evaluating material needs for Rudder, Horizontal Stabilizer, Elevator, slats, and flaperons. Find material suppliers. Begin looking at tool acquisition sources / costs. Begin reading Zenair Construction Standards.
 
27     Dec 15, 2019 Workshop organizing Workshop 1 $0.00    0   
Beginning to remove unneeded items. Plan for changes to allow successful build.
 
26     Dec 14, 2019 Engine Cleaning Engine 3 $0.00    5   
Finished cleaning left case and prep for sending to Florida. Began cleaning heads. Evaluation of head quality. Pictures sent to FlyWithSPA / FlyCorvair for a review. Two cylinders may be too damaged for reconditioning.
 
25     Dec 12, 2019 Engine Cleaning Engine 2 $0.00    0   
Remove rust and scale from case studs.
 
24     Dec 09, 2019 Engine Cleaning Engine 1.5 $0.00    0   
Engine internal, external, and lifter bores. Also a few more screw holes in base of case half. Removed gasket material. Ready to clean the case studs.
 
23     Dec 08, 2019 Engine Case Cleaning Engine 2 $0.00    3   
Left case cleaning. External. Internal. Oil galleries and all screw / dowl holes. Flush oil passageways. Remove scum and varnish.
 
22     Dec 06, 2019 Engine Assembly Instruction Research 2 $0.00    3   
Corvair engine assembly, DVD 1 by William Wynne. Covered putting crank and cam back into engine, placing case halves together, tightening.
 
21     Dec 06, 2019 Case / Cam Engine 1.5 $0.00    2   
Left case half cleaning. Exterior and interior. Oil galleries. Lifter bores. Clean cam, treat with ACF-50, wrap in plastic, ready to take to Florida.
 
20     Dec 01, 2019 Sheetmetal Scratch Technique review Research 2 $0.00    0   
Reviewed creation of form blanks from plans for aircraft parts using common woodshop tools, methods for cutting sheet metal, bending metal to form parts. First couple of chapters of Homebuilt Help's "Scratch Building Basics for Metal Aircraft".
 
19     Nov 29, 2019 Engine cleaning Engine 3 $0.00    3   
Finished cleaning right case half. Removed rust / scale from case studs. Cleaned stud threads. Treated all studs with ACF-50 and wrapped in plastic for temp storage before taking to Floriday. Cleaned but camshaft and cam gear. Restored rear oil case attachment hardware to near orginal condition. Restored old head nuts (but will not reuse due to minor munging). All treated with ACF-50 and stored.
 
18     Nov 24, 2019 Engine crankshaft Engine 2 $0.00    2   
Finished cleaning engine crankshaft. All passages flushed with solvent. Main bearing and connecting rod throw journals cleaned with light application of scotch brite 7447. Slathered in ACF-50 and wrapped for storage until delivery to Florida for processing into flight engine crankshaft.
 
17     Nov 22, 2019 Engine Case and Crankshaft Engine 2 $0.00    4   
Almost finished cleaning R(ight) case half. All holes cleaned. Oil gallery cleaned. Surfaces cleaned and dowl holes cleaned. Still needs to have studs de-rusted / de-scaled. Minor pitting on some gasket surface areas that is not significant. No pitting on case mating surface. Internal surfaces clean enough for assembly.
 
16     Nov 17, 2019 Case and Crankshaft cleaning Engine 1.8 $0.00    3   
Gasket removal. Discovered that gasket remover does a great job of getting stubborn varnish out of internal areas that are hard to get at. Crankshaft cleaning / minor polishing. Flushed all the crankcase oil passages thoroughly with solvent. Note that in first crankshaft pic the first two throws have very mild surface corrosion. In second picture it is gone -- just a bit of light rubbing with Scotch-Brite 7447.
 
15     Nov 15, 2019 Case cleaning Engine 1 $0.00    0   
Case detailing, removing dirt on outside, varnish on inside. Removed oil gallery plug for later cleaning.
 
14     Nov 13, 2019 AC 43.13-1B Engine Research .5 $0.00    0   
Chapter 8 Engines, Fuel, Exhaust, and Propellers 8.1 to 8.13
 
13     Nov 09, 2019 Detail cleaning Engine 2.5 $0.00    2   
Parts cleaner / lots of Scotch-Brite 7447
 
12     Nov 06, 2019 AC 43.13-1B Wiring Research .7 $0.00    0   
9 Environmental Protection and Inspection, 10 Service Loop Harnesses, 11 Clamping, 12 Wire Insulation and Lacing String Tie, 13 Splicing
 
11     Nov 02, 2019 Case Cleaning / Crankshaft inspection Engine 2 $0.00    3   
More case cleaning. Crankshaft inspection and attempt removal of woodruff key. Wouldn't come out. Taking to William Wynne / Dan Weseman.
 
10     Oct 30, 2019 AC 43.13-1B Research 1 $0.00    0   
6 Aircraft Electrical Wire Selection, 7 Table of Acceptable Wires, 8 Wiring Installation INspection Requirements
 
9     Oct 28, 2019 Engine Cleaning Engine 2 $0.00    3   
Cleaning case halves.
 
8     Oct 25, 2019 AC 43.13-1B Research .7 $0.00    0   
11.5 Electrical Wire Rating -- read it but still need to work through the examples.
 
7     Oct 21, 2019 Engine Core Teardown Engine 4.5 $0.00    4   
Remove stuck cylinders by whatever means necessary without damaging case. Result: Success. Crank looks serviceable as well as heads, case, and the oil routing end case.
 
6     Oct 17, 2019 Engine Core Teardown Engine 2.5 $0.00    3   
Remove front of case / bell housing. Split case by unding case bolts. Remove cylinder 5 by pounding on underside of piston stuck in cylinder. Same technique pounded piston out of cylinder 3. William Wynne recommended cutting slots (weak spots) on interior of cylinder wall to help break cylinder out of case.
 
5     Oct 14, 2019 AC43.13-1B 11.1 - 11.4 Research 1.5 $0.00    0   
11.1 Inspection and Care of Electrical Systems
11.2 Storage Batteries
11.3 Inspection of Equipment Installation
11.4 Inspection of Circuit-Protection Devices
 
4     Oct 11, 2019 Engine Core Teardown Engine 3 $0.00    2   
Remove fan housing. Unable to get crank to rotate, so had to cut through rods (recommended by William Wynne). Cut through rods to be able to remove cylinders. After cutting through 4, began to be able to rotate crank while cylinders 1 & 2 still attached by rod. Undid rod bolts. Unable to remove rod cap. Sawed through both remaining rods. Tapped rod bolts out using previously removed rod with bolts set on the rod bolts not coming off and tapping lightly.
 
3     Oct 07, 2019 Engine Core Teardown Engine 2.5 $0.00    6   
Remove pushrod tubes and pushrods. Remove head stud bolts and rocker retainers. Remove cylinder bottom cooling baffle. Remove cylinder heads.
 
2     Sep 25, 2019 Engine Core Teardown Engine 1.5 $0.00    5   
Remove exhaust logs, engine cooling baffles (end pieces). Remove harmonic balancer. Remove distributor retaining screws. Left distributor in until understanding if it can be just pulled out. Videos can be found here: https://corvair750.blogspot.com/2019/09/steady-progress.html
 
1     Sep 18, 2019 Engine Core Teardown Engine 1.5 $0.00    5   
Began tearing down core engine for flight engine conversion rebuild. Engine serial No: T04I3RG, Heads S/N: 3856743. This identifies as a 1965-1969 95 HP Corvair engine core.

Power washed. Removed sheet metal and accessories including carburetor and some vacuum lines.