227     Apr 04, 2022 Front Seat Belts Interior Finish 6 $0.00    5   
226     Apr 03, 2022 Main gear and toe Landing Gear 8 $0.00    1   
225     Mar 31, 2022 Elevator Control Cables and misc things Controls 3 $0.00    6   
224     Mar 30, 2022 Fuel Flow Test Fuel System 3 $0.00    7   
223     Mar 26, 2022 Wing Tip Landing Lights Wings Misc 6 $0.00    0   
222     Mar 25, 2022 Wing wiring Electrical 6 $0.00    1   
221     Mar 24, 2022 Fuel leak check Fuel System 5 $0.00    0   
220     Mar 21, 2022 Stabilizer & Elevator troubleshoot Controls 12 $0.00    0   
219     Mar 18, 2022 Wing to fuselage gap parts Wings Misc 10 $0.00    0   
218     Jan 12, 2022 Wing Struts installation Wings Misc 2 $0.00    1   
217     Dec 27, 2021 Mounting the wings & control surfaces Wings Misc 6 $0.00    16   
216     Dec 19, 2021 Instrument panel and forward, final details Instrument Panel 6 $0.00    4   
215     Dec 16, 2021 Prep for paint Paint / Decals 3 $0.00    8   
214     Dec 08, 2021 Cowl final details FWF 3 $0.00    2   
213     Oct 30, 2021 Windscreen fairing Doors/Window 6 $0.00    5   
212     Oct 08, 2021 Final boot cowl and avionics before cowl paint Fuselage 6 $0.00    8   
211     Oct 06, 2021 Interior lights Electrical 3 $0.00    2   
210     Sep 24, 2021 Avionics work Electrical $0.00    5   
209     Feb 11, 2021 Panel fabrication Instrument Panel $0.00    3   
208     Jan 27, 2021 Brake line connections and oil drain Landing Gear $0.00    4   
207     Jan 22, 2021 Avionics tray and EMS planning FWF 4 $0.00    0   
206     Jan 20, 2021 EGT, CHT probe installations FWF 1.5 $0.00    0   
205     Jan 19, 2021 Brake lines FWF 2.5 $0.00    0   
204     Jan 18, 2021 Firewall completion, engine re-installation and hookups FWF 12 $0.00    6   
203     Jan 11, 2021 Firewall completion FWF 8.7 $0.00    4   
202     Jan 08, 2021 Cowl deburring, camloc backplates, and engine removal FWF 1.8 $0.00    0   
201     Jan 07, 2021 Cowl final things FWF 2.5 $0.00    5   
200     Jan 06, 2021 Cowl air scoop and removal FWF 2 $0.00    4   
199     Jan 05, 2021 Bottom cowl scoop and inside fairing FWF 3 $0.00    0   
198     Jan 04, 2021 Cowl fabrication FWF 11 $0.00    8   
197     Dec 30, 2020 Cowl and firewall FWF 2 $0.00    5   
196     Dec 29, 2020 Primer and Mag Harness FWF 2 $0.00    0   
195     Dec 28, 2020 Oil door, Mag harness, Primer lines FWF 3 $0.00    4   
194     Dec 19, 2020 Bottom cowl and nose bowl FWF 4 $0.00    0   
193     Dec 18, 2020 Bottom cowl FWF 2 $0.00    0   
192     Dec 17, 2020 Bottom Cowl FWF 2 $0.00    0   
191     Dec 16, 2020 Nose bowl, misc FWF 3 $0.00    0   
190     Dec 15, 2020 Nose bowl FWF 2 $0.00    0   
189     Dec 14, 2020 Baffling: tension wires FWF 2.5 $0.00    0   
188     Dec 14, 2020 Top cowl riveting FWF 1.5 $0.00    2   
187     Dec 13, 2020 Top cowl fittings, dimpling, deburring FWF 3 $0.00    0   
186     Dec 12, 2020 Baffle seals done FWF 2 $0.00    2   
185     Dec 11, 2020 Baffle seals FWF 1 $0.00    0   
184     Dec 10, 2020 Baffle fabric seal FWF 2 $0.00    3   
183     Dec 09, 2020 Alternator, baffles final install, and fabric FWF 2 $0.00    0   
182     Dec 08, 2020 Baffles and engine bolt FWF 2 $0.00    0   
181     Dec 07, 2020 Oil door and baffles FWF 5 $0.00    3   
180     Dec 07, 2020 Oil door FWF 2 $0.00    0   
179     Dec 06, 2020 Baffles and upper cowl FWF 3 $0.00    0   
178     Dec 05, 2020 Baffles and upper cowl FWF 2 $0.00    1   
177     Dec 04, 2020 Front baffles, misc FWF 5 $0.00    0   
176     Dec 01, 2020 Baffling and misc FWF 2 $0.00    4   
175     Nov 29, 2020 Removing an engine from a PA-32 FWF 8 $0.00    52   
174     Nov 29, 2020 Rear Baffles FWF 2.5 $0.00    0   
173     Nov 28, 2020 Rear Baffles FWF 2.5 $0.00    3   
172     Nov 27, 2020 Bottom Cowl FWF 3 $0.00    2   
171     Nov 26, 2020 Bottom Cowl FWF $0.00    5   
170     Nov 25, 2020 Bottom cowl FWF 2.3 $0.00    4   
169     Nov 24, 2020 Exhaust hangers and lower cowl FWF 1.5 $0.00    2   
168     Nov 23, 2020 C-channels and misc FWF 4 $0.00    5   
167     Nov 22, 2020 C-channels FWF 4 $0.00    0   
166     Nov 21, 2020 Nose bowl, baffles, exhaust FWF 2.5 $0.00    2   
165     Nov 20, 2020 Prop install and removal, wood backplate, misc FWF 5 $0.00    5   
164     Nov 19, 2020 Front baffles and accessories FWF 3 $0.00    0   
163     Nov 18, 2020 Right side baffles FWF 3.5 $0.00    0   
162     Nov 17, 2020 Baffles FWF 2.5 $0.00    0   
161     Nov 16, 2020 Engine Mounting FWF 1.5 $0.00    3   
160     Nov 15, 2020 Engine mounting prep FWF 2 $0.00    3   
159     Nov 14, 2020 Prep for engine installation FWF 3 $0.00    3   
158     Nov 13, 2020 Rear heat outlet Interior Finish 2 $0.00    0   
157     Nov 12, 2020 Fuselage access covers Fabric Cover 2 $0.00    0   
156     Nov 11, 2020 Fuselage access covers Fabric Cover 1.5 $0.00    0   
155     Nov 10, 2020 Rudder cable exits Fabric Cover 1.5 $0.00    0   
154     Nov 09, 2020 Rudder cable exit backplate fab and misc tasks Fabric Cover 7 $0.00    0   
153     Nov 05, 2020 Under Door Fabric and float patches Fabric Cover 1 $0.00    0   
152     Nov 04, 2020 Under door fabric Fabric Cover 2.2 $0.00    0   
151     Nov 03, 2020 Under main door fabric areas Fabric Cover 2 $0.00    0   
150     Nov 02, 2020 Final shrinking part 2 Fabric Cover 2 $0.00    0   
149     Oct 27, 2020 Final shrinking Fabric Cover 2 $0.00    0   
148     Oct 26, 2020 Fuselage top Fabric Cover 1.5 $0.00    0   
147     Oct 26, 2020 Fuselage Tapes Fabric Cover 3.5 $0.00    0   
146     Oct 25, 2020 Reinforcing tape and rib/stringer lacing Fabric Cover 3 $0.00    0   
145     Oct 23, 2020 Top Fabric Fabric Cover 1.5 $0.00    0   
144     Oct 22, 2020 Left Side Fabric Fabric Cover 2 $0.00    0   
143     Oct 21, 2020 Left side fabric Fabric Cover 3 $0.00    0   
142     Oct 20, 2020 Let side fabric Fabric Cover $0.00    0   
141     Oct 19, 2020 Left side fabric Fabric Cover 2 $0.00    0   
140     Oct 18, 2020 Left Side fabric Fabric Cover 1.5 $0.00    2   
139     Oct 17, 2020 Left side fabric Fabric Cover 1 $0.00    1   
138     Oct 16, 2020 Avionics arrived Instrument Panel .5 $0.00    2   
137     Oct 16, 2020 Left Side Fabric Fabric Cover 1.5 $0.00    3   
136     Oct 15, 2020 Misc fabric tasks Fabric Cover 1.5 $0.00    1   
135     Oct 14, 2020 Misc fabric tasks FWF 2 $0.00    0   
134     Oct 13, 2020 Right Side Fabric Fabric Cover 2 $0.00    2   
133     Oct 12, 2020 Right side fabric - stringer to tail transition Fabric Cover 1 $0.00    2   
132     Oct 09, 2020 Right side fabric Fabric Cover 0.5 $0.00    0   
131     Oct 08, 2020 Right Side Fabric Fabric Cover 2.5 $0.00    4   
130     Oct 07, 2020 Right side fabric Fabric Cover 2.5 $0.00    1   
129     Oct 06, 2020 Right side fabric Fabric Cover 2 $0.00    0   
128     Oct 05, 2020 Fuselage rear access holes Fabric Cover 2.5 $0.00    0   
127     Oct 05, 2020 Right side fabric fit and tracing Fabric Cover 2 $0.00    0   
126     Oct 04, 2020 Prep for fuselage fabric Fabric Cover 2 $0.00    2   
125     Oct 03, 2020 Inclinometer Instrument Panel .5 $0.00    2   
124     Oct 02, 2020 Test fitting of left stabilizer and elevator Fabric Cover 2 $0.00    3   
123     Oct 01, 2020 Bottom Fabric Fabric Cover 6 $0.00    7   
122     Sep 30, 2020 Stringers Fuselage 10 $0.00    9   
121     Sep 29, 2020 Engine mount painting FWF 1 $0.00    10   
120     Sep 24, 2020 Fuselage Stringers Fuselage 1.5 $0.00    0   
119     Jun 02, 2020 Aileron Oratex from start to finish Fabric Cover 3 $0.00    17   
118     May 28, 2020 Filled gusset overlaps on flaps Fabric Cover 2 $0.00    1   
117     May 25, 2020 Prepping for Oratex work Fabric Cover 3 $0.00    1   
116     Mar 27, 2020 Seat fabric supports Fabric Cover 1 $0.00    4   
115     Mar 26, 2020 Covering Seats Fabric Cover 10 $0.00    1   
114     Feb 26, 2020 Oratex glue test Fabric Cover 2 $0.00    4   
113     Feb 13, 2020 Oratex research and prep. Fabric Cover .7 $0.00    0   
112     Feb 12, 2020 Trim cables Controls 1.7 $0.00    4   
111     Feb 11, 2020 Interrior planning Interior Finish 1 $0.00    0   
110     Feb 11, 2020 Trim cables Controls 1 $0.00    6   
109     Feb 09, 2020 Shrink wrap and trim cables Controls 1.2 $0.00    0   
108     Feb 02, 2020 Elevator cables Controls 2 $0.00    3   
107     Feb 01, 2020 Rudder cables complete Controls 1.3 $0.00    1   
106     Jan 31, 2020 Rudder steering horn Controls 1.5 $0.00    0   
105     Jan 29, 2020 Rudder cables continued Controls 1.9 $0.00    1   
104     Jan 28, 2020 Rudder cables Controls 2.2 $0.00    3   
103     Jan 27, 2020 Rudder hookups and Cleaning shop Fuselage 2.1 $0.00    6   
102     Jan 26, 2020 Rear heat, cowl tunnel, shop cleaning Fuselage 2.5 $0.00    0   
101     Jan 25, 2020 Bottom skin and rear heat Fuselage 2.2 $0.00    2   
100     Jan 24, 2020 Gear strut rubber seal Fuselage 2.5 $0.00    5   
99     Jan 23, 2020 Gear strut seal Fuselage 1.4 $0.00    1   
98     Jan 22, 2020 Bottom fuselage skin Fuselage 1.4 $0.00    0   
97     Jan 21, 2020 Fresh air vent tabs Interior Finish 1 $0.00    2   
96     Jan 20, 2020 Fresh air vents Interior Finish 1.6 $0.00    4   
95     Jan 20, 2020 Electrical planning Electrical 1 $0.00    0   
94     Jan 19, 2020 Fresh air and cabin heat vents Interior Finish 2.5 $0.00    6   
93     Jan 18, 2020 Trim cable Controls 1.5 $0.00    4   
92     Jan 17, 2020 Rear heat box Interior Finish 1.9 $0.00    1   
91     Jan 16, 2020 Windscreen Doors/Window 1.9 $0.00    1   
90     Jan 15, 2020 Windscreen Doors/Window 1.6 $0.00    3   
89     Jan 13, 2020 Windscreen Doors/Window .5 $0.00    1   
88     Jan 13, 2020 Boot cowl assembly Fuselage 1.5 $0.00    0   
87     Jan 05, 2020 Skylight structure Fuselage 1 $0.00    0   
86     Jan 04, 2020 Boot cowl Fuselage 1 $0.00    1   
85     Jan 04, 2020 Side window painting Paint / Decals 1.7 $0.00    2   
84     Jan 03, 2020 Tailpost paint Paint / Decals 2 $0.00    1   
83     Dec 31, 2019 Wing storage Wings Misc 1.4 $0.00    1   
82     Dec 27, 2019 Fuselage bottom skin Fuselage 1.1 $0.00    1   
81     Dec 26, 2019 Cleaning and misc things Fuselage 2 $0.00    0   
80     Dec 24, 2019 Unpacking brake calipers Landing Gear 1.5 $0.00    0   
79     Dec 23, 2019 Boot cowel vents Interior Finish 1.5 $0.00    1   
78     Dec 23, 2019 Baggage door skin finishing Doors/Window 1.5 $0.00    0   
77     Dec 22, 2019 Main wheel assembly Landing Gear 1 $0.00    1   
76     Dec 22, 2019 Forward baggage door pin Doors/Window 1.5 $0.00    3   
75     Dec 21, 2019 Forward baggage door Doors/Window 1.3 $0.00    2   
74     Dec 20, 2019 Forward baggage door Doors/Window 2.2 $0.00    0   
73     Dec 19, 2019 Forward baggage door Doors/Window 1.4 $0.00    1   
72     Dec 18, 2019 Baggage doors Doors/Window 2.1 $0.00    6   
71     Dec 17, 2019 Rear baggage dooor Doors/Window 2.2 $0.00    1   
70     Dec 16, 2019 Left window and baggage doors Doors/Window 2.2 $0.00    2   
69     Dec 15, 2019 Left rear window Doors/Window 2 $0.00    0   
68     Dec 14, 2019 Left side rear window welding Doors/Window 3.5 $0.00    6   
67     Dec 13, 2019 Left side rear window Doors/Window 2.2 $0.00    4   
66     Dec 12, 2019 Fuel system fishing touches Fuel System 1.5 $0.00    3   
65     Dec 11, 2019 Left window frame Doors/Window 2 $0.00    2   
64     Dec 10, 2019 Left window frame continued Doors/Window 1.5 $0.00    4   
63     Dec 09, 2019 Left window frame Doors/Window 1.7 $0.00    0   
62     Dec 08, 2019 Fuel system leak check Fuel System 1.5 $0.00    0   
61     Dec 07, 2019 Fuel line final hookups Fuel System 2 $0.00    0   
60     Dec 06, 2019 Rear window planning Doors/Window 2.2 $0.00    1   
59     Dec 05, 2019 From Gascolator to Firewall Fuel System 1.5 $0.00    3   
58     Dec 04, 2019 Door flanges and left forward fuel line Fuel System 2 $0.00    5   
57     Dec 03, 2019 Left side rear fuel line and brake planning Fuel System 1.8 $0.00    2   
56     Dec 02, 2019 Right door flange and fuel lines continued Fuel System 2.5 $0.00    0   
55     Nov 27, 2019 Door flange riveting Fuselage 2 $0.00    4   
54     Nov 26, 2019 Fuel valve Modification take 2 Fuel System 1 $0.00    1   
53     Nov 26, 2019 Baggage door flange Fuselage 1.5 $0.00    0   
52     Nov 25, 2019 Door flange riveting Fuselage 1.5 $0.00    0   
51     Nov 24, 2019 Forward right fuel line and flange penetrations Fuel System 2.5 $0.00    5   
50     Nov 23, 2019 Lower Fuselage fuel lines Fuel System 2 $0.00    2   
49     Nov 22, 2019 Fuel Line Installation Fuel System 2.3 $0.00    6   
48     Nov 21, 2019 Control stick install Controls 2 $0.00    2   
47     Nov 20, 2019 Shop Organization and Strut work Wings Misc 5 $0.00    0   
46     Nov 13, 2019 Wing mounting day! Wings Misc 10 $0.00    19   
45     Nov 12, 2019 Wing mounting prep Wings Misc 2 $0.00    5   
44     Nov 10, 2019 Wing strut assembly and carpentry day Wings Misc 7 $0.00    1   
43     Nov 08, 2019 Wing mounting day prep Wings Misc 1.5 $0.00    0   
42     Nov 07, 2019 Cleaning up Paint / Decals 1.5 $0.00    0   
41     Nov 06, 2019 Finish painting fuselage, drill wing strap fittings Paint / Decals 2 $0.00    4   
40     Nov 05, 2019 Top coat fuselage Paint / Decals 2 $0.00    1   
39     Nov 04, 2019 Fuselage scuff and paint prep Paint / Decals 2 $0.00    4   
38     Nov 03, 2019 Prep for fuselage paint Paint / Decals 1.5 $0.00    0   
37     Nov 02, 2019 Prep for fuselage paint Paint / Decals 2 $0.00    0   
36     Oct 31, 2019 Second color coat Paint / Decals 4 $0.00    15   
35     Oct 30, 2019 Color coat on wings Paint / Decals 5 $0.00    8   
34     Oct 29, 2019 Primer Paint / Decals 2 $0.00    2   
33     Oct 29, 2019 Scuff Fuselage Primer Paint / Decals 2 $0.00    0   
32     Nov 17, 2011 Spacer bars Wing Spars 5 $0.00    1   
31     Nov 16, 2011 Spar spacer bars Wing Spars 3 $0.00    0   
30     Nov 14, 2011 Spar plates and web blanks Wing Spars 9 $0.00    1   
29     Nov 09, 2011 Spar plates Wing Spars 4 $0.00    0   
28     Nov 08, 2011 Capstrip deburring Wing Spars 6 $0.00    0   
27     Nov 07, 2011 Flying to pickup spar web blanks and capstrip deburring Wing Spars 6 $0.00    2   
26     Nov 06, 2011 Spar plates and capstrip deburring Wing Spars 5 $0.00    0   
25     Nov 03, 2011 Spar capstrips Wing Spars 3 $0.00    3   
24     Oct 31, 2011 Stiffener angle sanding Wing Ribs 5.5 $0.00    0   
23     Oct 26, 2011 Aileron and flap rib flanging Flap/Aileron 7 $0.00    0   
22     Oct 25, 2011 Flint River sandbar Flying 0 $0.00    1   
21     Oct 17, 2011 Stiffener angles Wing Ribs 9 $0.00    1   
20     Oct 14, 2011 Center rib flanging and end rib flanging Wing Ribs 5.5 $0.00    1   
19     Oct 02, 2011 Rib flanging Wing Ribs 10 $0.00    1   
18     Sep 25, 2011 Rib lightening hole flanging Wing Ribs 9 $0.00    0   
17     Sep 13, 2011 Ribs misc Wing Ribs 11 $0.00    1   
16     Sep 10, 2011 Ribs and stiffener angles Wing Ribs 8 $0.00    1   
15     Sep 09, 2011 Hammering nose and center ribs Wing Ribs 3 $0.00    0   
14     Sep 04, 2011 Hammering Nose Ribs Wing Ribs 8 $0.00    0   
13     Aug 25, 2011 Kitfox Annual Inspection 16 $0.00    1   
12     Aug 21, 2011 Nose rib relief notches, deburring Wing Ribs 6 $0.00    1   
11     Aug 12, 2011 Rib trimming, relief notches Wing Ribs 5 $0.00    0   
10     Aug 10, 2011 Rib cutting, routing Wings Misc 4 $0.00    0   
9     Aug 05, 2011 Rib drilling, routing, deburring Wing Ribs 9.5 $0.00    0   
8     Aug 01, 2011 Rib drilling, deburring Wing Ribs 7 $0.00    0   
7     Jul 29, 2011 Routing, cutting, drilling, sanding Wing Ribs 11 $0.00    0   
6     Jul 11, 2011 Cutting, drilling, routing Wing Ribs 18.5 $0.00    0   
5     Jul 10, 2011 Cutting aluminum blanks Wing Ribs 3 $0.00    1   
4     Jun 29, 2011 Finished form blocks and started cutting blanks Wing Ribs 12 $0.00    1   
3     Jun 22, 2011 More form block work Wing Ribs 19 $0.00    1   
2     Jun 21, 2011 Cutting wing form block with band saw Wing Ribs 1.5 $0.00    1   
1     Jun 20, 2011 Wing form block and garage setup Wing Ribs 2 $0.00    2   
------------ -------------- -------------
Totals749.4    $0.00    504   