77     Feb 18, 2024 Adding more media Controls 99 $0.00    2   
 
76     Feb 18, 2024 All systems working, hooking up rudder cables Controls 98 $0.00    10   
Lots of work, attached tail, run engine, avionics working, brakes bled, rudder pedals working
 
75     Nov 02, 2023 Long time no pix Engine 99 $99.00    12   
Trying to catch up on pix. Avionics are alive, engine is mounted, about to trim cowling in order to get engine started. Wiring done... Well nearly done.
 
74     Aug 01, 2023 More pix for updates from Android phone Fuselage 99 $0.00    8   
 
73     Aug 01, 2023 Been a while… Fuselage 99 $0.00    13   
 
72     May 19, 2023 Turtle deck and wheels Fuselage 5 $0.00    4   
Completed some goopy RTV stuff on the avionics cover and started playing with the landing gear.
Finding Real talcum powder is a challenge nowadays!?! Interior was finally shipped yesterday…
 
71     May 01, 2023 Finally received the avionics, inventory completed! Fuselage 10 $0.00    3   
 
70     May 01, 2023 Finally received the finish kit and inventory completed Fuselage 8 $0.00    6   
 
69     Feb 21, 2023 SB-00067 Fuselage 3 $15.00    4   
SB-00067
DATE POSTED
January 23, 2023
APPLIES TO
RV-12 and RV-12iS
DESCRIP�
Reinforcement of the WD-1223 Counterbalance Arm to prevent potential fatigue failure
 
68     Feb 09, 2023 Firewall, oil tank, hangar move, avionics tray Fuselage 50 $0.00    17   
Been a while. Brakes, rudder pedals, firewall, fuel lines,…
 
67     Dec 20, 2022 Lots of stuff - Tank, roll bar, baggage bulkhead Fuselage 30 $0.00    7   
 
66     Oct 17, 2022 Roll bar and fuel pump bracket Fuselage 16 $0.00    4   
 
65     Oct 10, 2022 Riveted left side skin and canopy deck Fuselage 8 $0.00    5   
 
64     Oct 09, 2022 Finally attaching side skins Fuselage 45 $0.00    6   
 
63     Aug 20, 2022 Left Longeron going on Fuselage 50 $0.00    4   
Longerons are the hardest thing so far. Those suckers just do not wanna cooperate.
 
62     Aug 09, 2022 Houston we have a canoe Fuselage 30 $0.00    10   
Assembled the front end with firewall and attached it. Getting long and heavier
 
61     Aug 03, 2022 Forward floor pans Fuselage 8 $0.00    3   
Lots of nut plates , prep, and many rivets
 
60     Jul 31, 2022 Fun times on the fuselage Morton skin. Fuselage 20 $0.00    9   
Finally put the big bottom (primed) skin on the fuselage. Looks great, and boy did it stiffen the entire structure. It's still amazingly light too. Good job Vans.
 
59     Jul 28, 2022 Finally putting skins on the fuselage! Fuselage 8 $0.00    7   
 
58     Jul 27, 2022 More fuselage work, COVID-19 Fuselage 60 $0.00    13   
Been a while. Went on vacation, got COVID-19, lost almost a month
 
57     Jun 21, 2022 Working on seat ribs, controls and support brackets Fuselage 16 $0.00    3   
 
56     Jun 16, 2022 Flaperon mixer and bearing brackets Fuselage 20 $0.00    4   
Also prepping seat ribs, priming,…
 
55     Jun 12, 2022 Baggage floor, next is rear soar recepticles Fuselage 15 $0.00    8   
 
54     Jun 05, 2022 Received kit and going at it Fuselage 40 $0.00    25   
Retrieved kit crates from freight company and started center section. So far so good. This is the most complicated phase by far.
 
53     May 23, 2022 Built portable wing caddies, prep for fuse kit Workshop 6 $0.00    3   
Used surplus stuff to build my own design (I think) of modular/portable wing caddies. Work great, and have a small footprint. Cleaned shop and repainted the floor to prep for the impending fuse kit.
 
52     May 21, 2022 Wings done, fuse coming! Wings 35 $0.00    8   
Both wings closed up and wired. Building wings caddies and prepping for the fuselage kit, which shipped! Only took 14 months to get shipped.
 
51     May 10, 2022 Near to closing right wing up. Wings 40 $0.00    7   
Been a while. Wing was flipped and upper skins placed, along with some tip stuff and the landing light installed.
 
50     May 02, 2022 Completed right, outer, underside skin Wings 7 $0.00    3   
 
49     May 02, 2022 Right wing assembly continues Wings 8 $0.00    6   
 
48     Apr 28, 2022 Hung left wing, rearranged shop, on to right wing Wings 8 $0.00    3   
Ouch, that hurt my back. Very nerve wracking.
 
47     Apr 27, 2022 Buttoned up left wing. Ready to store it. Wings 2 $0.00    5   
 
46     Apr 27, 2022 Left Landing Light in - closing tip Wings 16 $0.00    6   
 
45     Apr 15, 2022 Onto the left wing tip and lights Wings 11 $0.00    13   
 
44     Apr 12, 2022 Near to closing up the left wing Wings 15 $0.00    7   
 
43     Apr 02, 2022 Completed left bottom skins and started inspection plate Wings 9 $0.00    4   
 
42     Apr 01, 2022 Another wing panel Wings 3 $0.00    4   
Outboard left wing bottom attached
 
41     Mar 31, 2022 Finally skinning the wings - left 1st Wings 8 $0.00    4   
1st skin riveted , left underside
 
40     Mar 29, 2022 Prepping for the skins, install stub spars Wings 10 $0.00    8   
Finally received the missing stubs spars and stub spar doublers. Now I can put the skins on.
 
39     Mar 23, 2022 Installing landing lights Wings 2 $0.00    1   
 
38     Mar 16, 2022 Completed Service bulletin 53 Fuselage 3 $30.00    2   
Completed SB 53 for braces At tail bulkheads
 
37     Mar 01, 2022 ordered finish kit and avionics Wings 2 $99999.00    1   
trying to head off price increases. still waiting for everything....
 
36     Jan 25, 2022 Running wires , aoa tube, stall switch done, working on landing lights Wings 4 $0.00    1   
Since I'm waiting on back ordered Wing parts, the stub spars for the front of the wings, and my fuselage kit ( it will contain them) is very late with no delivery date, I'm skipping all over the place and doing all kinds of strange steps.
 
35     Jan 23, 2022 Flaperons done , wiring wings Wings 5 $0.00    1   
See completed flaperons hanging overhead. Can't skin the wings without back ordered parts, so skipping around a bit. A little tricky as I could work myself into a corner. Been there, done that. Still waiting on a very late fuselage kit.
 
34     Jan 11, 2022 Right flaperon ready for nose skins Wings 4 $0.00    1   
 
33     Jan 11, 2022 Right flaperon ready for skinning Wings 3 $0.00    1   
 
32     Jan 10, 2022 Started the right flaperon Wings $0.00    1   
I had to put some of the smaller parts on the spar just to convince my brain I was building the right flaperon, not the left!
 
31     Jan 09, 2022 Loctite the tie rod ends and hung the flaperon overhead Wings 3 $0.00    0   
 
30     Jan 08, 2022 Sent in an order for the finish kit Landing Gear $0.00    0   
 
29     Jan 07, 2022 Finished left flaperon Wings 4.5 $0.00    4   
 
28     Jan 07, 2022 Started skinning left flaperon Wings 2.5 $0.00    5   
 
27     Jan 06, 2022 Rear skins going on left flaperon Wings 8 $0.00    6   
Deburred all ready to go…
 
26     Jan 06, 2022 Left flaperon ready for skins Wings 15 $0.00    1   
 
25     Jan 03, 2022 Working left flaperon Wings 20 $0.00    1   
Deburring, priming, drilling…
 
24     Jan 01, 2022 All ribs installed Wings 20 $0.00    2   
Had a rough time getting rivets in between the inboard ribs, but finally made it happen.
Still missing stub spars, so moving on to the flaperons. Already drilled two holes in the 1st stainless counterweight. Scary.
 
23     Dec 26, 2021 Uh oh - fuselage kit Fuselage 1 $0.00    1   
First July, then September, then November, now no date at all for fuse kit crating…
 
22     Dec 26, 2021 Finished right wing ribs Wings 8 $0.00    3   
Waiting on stub spars and doublers…
 
21     Dec 26, 2021 Installing forward ribs - right wing Wings 5 $0.00    1   
Working around backordered parts makes life “ interesting “.
Moving forward on faith stuff will show up.
 
20     Dec 21, 2021 Rear ribs attached on both wings Wings 40 $10.00    2   
Had to replace only about 40 rivets…don't ask…(read those “Notes”!?!?) but finally have the rear spars on. Still waiting on spar doublers and stub spars. Dang it. Might move on to the flaperons instead.
 
19     Dec 16, 2021 Wing rib install Wings 20 $0.00    5   
Progress
 
18     Dec 15, 2021 Debur ribs Wings 60 $0.00    2   
Finished deburring all wing ribs…whew…
 
17     Dec 05, 2021 Work under way on wings - shop useable Wings 60 $0.00    6   
Organizing, deburring, preparing spars and ribs…try to keep tidy…
 
16     Dec 05, 2021 Received wing crates Wings 4 $900.00    10   
Picked up wing crates in Greenville ABF distribution center. No damage.
 
15     Oct 01, 2021 Vans tells me that I will hear from the shipping company bringing my fuselage and wing kits to Saluda. Wings 1 $0.00    1   
4 to 6 weeks to crate !?!
 
14     Jul 01, 2021 Building going well Workshop 0 $0.00    4   
 
13     Mar 27, 2021 Ordered the fuselage kit Fuselage 1 $7365.00    0   
Sent in the order form for the 12iS fuselage kit - 6 months to ship !?!
 
12     Mar 18, 2021 Wing kit crate date Empennage 0 $0.00    0   
Vans informed me the wing kit should ship early july. Ahhhhhh!!!!
 
11     Feb 04, 2021 Ordered wing kit from Vans Wings 2 $9623.51    0   
deposit in the amount of $2405.88
 
10     Feb 01, 2021 Picked up empennage kit Empennage 15 $2650.00    1   
Round trip road trip Nc to Fl to load up tail kit and tools in a rented uhaul
 
9     Jan 26, 2021 Picking up the tail kit next week Empennage 1 $0.00    0   
 
8     Jan 21, 2021 Covid killed me Tools 0.1 $0.00    0   
Covid messed me up. Looking for a more realistic project...switching to RV-12is.
 
7     May 12, 2020 Changed Target Aircraft - Now RV-14 ( IFR needs ) Tools 1 $0.00    0   
After much deliberation and research, based upon real-world-experiences, changed my choice from the RV-7 to the RV-14.
 
6     Apr 09, 2020 Ordered even more tools Tools 2 $0.00    0   
 
5     Apr 09, 2020 Completed toolbox and #1 practice piece Research 8 $0.00    4   
 
4     Mar 22, 2020 Vans Plans on USB Research 1 $13.56    0   
Ordered Vans USB drive with preview plans for RV-7
 
3     Mar 22, 2020 Registered for RV class and AirVentures 2020 Research 1 $474.00    0   
Vans RV class at AirVentures 2020 and camping and tickets (2) for entire week
 
2     Mar 22, 2020 Ordered Vans practice kits Research 1 $91.63    0   
Practice project #1 and tool box for practicing/learning
 
1     Mar 22, 2020 Ordered Tools from Cleveland and Brown Tools Tools 4 $0.00    0   
Ordered drill, rivet gun, hand squeezer, deburring tools, etc,...
  ------------ -------------- ------------- Totals1446.1    $121270.70    336   