EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Summary
Hours
Entries
Expenses
Dtl. Expenses
Flight Time
Viewers
Categories
Project:
thiggins
- Project Summary
- Optional PDF document function
Entry Titles Only
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
Cost
# Pictures
77
Feb 18, 2024
Adding more media
Controls
99
$0.00
2
76
Feb 18, 2024
All systems working, hooking up rudder cables
Controls
98
$0.00
10
Lots of work, attached tail, run engine, avionics working, brakes bled, rudder pedals working
75
Nov 02, 2023
Long time no pix
Engine
99
$99.00
12
Trying to catch up on pix. Avionics are alive, engine is mounted, about to trim cowling in order to get engine started. Wiring done... Well nearly done.
74
Aug 01, 2023
More pix for updates from Android phone
Fuselage
99
$0.00
8
73
Aug 01, 2023
Been a while…
Fuselage
99
$0.00
13
72
May 19, 2023
Turtle deck and wheels
Fuselage
5
$0.00
4
Completed some goopy RTV stuff on the avionics cover and started playing with the landing gear.
Finding Real talcum powder is a challenge nowadays!?! Interior was finally shipped yesterday…
71
May 01, 2023
Finally received the avionics, inventory completed!
Fuselage
10
$0.00
3
70
May 01, 2023
Finally received the finish kit and inventory completed
Fuselage
8
$0.00
6
69
Feb 21, 2023
SB-00067
Fuselage
3
$15.00
4
SB-00067
DATE POSTED
January 23, 2023
APPLIES TO
RV-12 and RV-12iS
DESCRIP
Reinforcement of the WD-1223 Counterbalance Arm to prevent potential fatigue failure
68
Feb 09, 2023
Firewall, oil tank, hangar move, avionics tray
Fuselage
50
$0.00
17
Been a while. Brakes, rudder pedals, firewall, fuel lines,…
67
Dec 20, 2022
Lots of stuff - Tank, roll bar, baggage bulkhead
Fuselage
30
$0.00
7
66
Oct 17, 2022
Roll bar and fuel pump bracket
Fuselage
16
$0.00
4
65
Oct 10, 2022
Riveted left side skin and canopy deck
Fuselage
8
$0.00
5
64
Oct 09, 2022
Finally attaching side skins
Fuselage
45
$0.00
6
63
Aug 20, 2022
Left Longeron going on
Fuselage
50
$0.00
4
Longerons are the hardest thing so far. Those suckers just do not wanna cooperate.
62
Aug 09, 2022
Houston we have a canoe
Fuselage
30
$0.00
10
Assembled the front end with firewall and attached it. Getting long and heavier
61
Aug 03, 2022
Forward floor pans
Fuselage
8
$0.00
3
Lots of nut plates , prep, and many rivets
60
Jul 31, 2022
Fun times on the fuselage Morton skin.
Fuselage
20
$0.00
9
Finally put the big bottom (primed) skin on the fuselage. Looks great, and boy did it stiffen the entire structure. It's still amazingly light too. Good job Vans.
59
Jul 28, 2022
Finally putting skins on the fuselage!
Fuselage
8
$0.00
7
58
Jul 27, 2022
More fuselage work, COVID-19
Fuselage
60
$0.00
13
Been a while. Went on vacation, got COVID-19, lost almost a month
57
Jun 21, 2022
Working on seat ribs, controls and support brackets
Fuselage
16
$0.00
3
56
Jun 16, 2022
Flaperon mixer and bearing brackets
Fuselage
20
$0.00
4
Also prepping seat ribs, priming,…
55
Jun 12, 2022
Baggage floor, next is rear soar recepticles
Fuselage
15
$0.00
8
54
Jun 05, 2022
Received kit and going at it
Fuselage
40
$0.00
25
Retrieved kit crates from freight company and started center section. So far so good. This is the most complicated phase by far.
53
May 23, 2022
Built portable wing caddies, prep for fuse kit
Workshop
6
$0.00
3
Used surplus stuff to build my own design (I think) of modular/portable wing caddies. Work great, and have a small footprint. Cleaned shop and repainted the floor to prep for the impending fuse kit.
52
May 21, 2022
Wings done, fuse coming!
Wings
35
$0.00
8
Both wings closed up and wired. Building wings caddies and prepping for the fuselage kit, which shipped! Only took 14 months to get shipped.
51
May 10, 2022
Near to closing right wing up.
Wings
40
$0.00
7
Been a while. Wing was flipped and upper skins placed, along with some tip stuff and the landing light installed.
50
May 02, 2022
Completed right, outer, underside skin
Wings
7
$0.00
3
49
May 02, 2022
Right wing assembly continues
Wings
8
$0.00
6
48
Apr 28, 2022
Hung left wing, rearranged shop, on to right wing
Wings
8
$0.00
3
Ouch, that hurt my back. Very nerve wracking.
47
Apr 27, 2022
Buttoned up left wing. Ready to store it.
Wings
2
$0.00
5
46
Apr 27, 2022
Left Landing Light in - closing tip
Wings
16
$0.00
6
45
Apr 15, 2022
Onto the left wing tip and lights
Wings
11
$0.00
13
44
Apr 12, 2022
Near to closing up the left wing
Wings
15
$0.00
7
43
Apr 02, 2022
Completed left bottom skins and started inspection plate
Wings
9
$0.00
4
42
Apr 01, 2022
Another wing panel
Wings
3
$0.00
4
Outboard left wing bottom attached
41
Mar 31, 2022
Finally skinning the wings - left 1st
Wings
8
$0.00
4
1st skin riveted , left underside
40
Mar 29, 2022
Prepping for the skins, install stub spars
Wings
10
$0.00
8
Finally received the missing stubs spars and stub spar doublers. Now I can put the skins on.
39
Mar 23, 2022
Installing landing lights
Wings
2
$0.00
1
38
Mar 16, 2022
Completed Service bulletin 53
Fuselage
3
$30.00
2
Completed SB 53 for braces At tail bulkheads
37
Mar 01, 2022
ordered finish kit and avionics
Wings
2
$99999.00
1
trying to head off price increases. still waiting for everything....
36
Jan 25, 2022
Running wires , aoa tube, stall switch done, working on landing lights
Wings
4
$0.00
1
Since I'm waiting on back ordered Wing parts, the stub spars for the front of the wings, and my fuselage kit ( it will contain them) is very late with no delivery date, I'm skipping all over the place and doing all kinds of strange steps.
35
Jan 23, 2022
Flaperons done , wiring wings
Wings
5
$0.00
1
See completed flaperons hanging overhead. Can't skin the wings without back ordered parts, so skipping around a bit. A little tricky as I could work myself into a corner. Been there, done that. Still waiting on a very late fuselage kit.
34
Jan 11, 2022
Right flaperon ready for nose skins
Wings
4
$0.00
1
33
Jan 11, 2022
Right flaperon ready for skinning
Wings
3
$0.00
1
32
Jan 10, 2022
Started the right flaperon
Wings
$0.00
1
I had to put some of the smaller parts on the spar just to convince my brain I was building the right flaperon, not the left!
31
Jan 09, 2022
Loctite the tie rod ends and hung the flaperon overhead
Wings
3
$0.00
0
30
Jan 08, 2022
Sent in an order for the finish kit
Landing Gear
$0.00
0
29
Jan 07, 2022
Finished left flaperon
Wings
4.5
$0.00
4
28
Jan 07, 2022
Started skinning left flaperon
Wings
2.5
$0.00
5
27
Jan 06, 2022
Rear skins going on left flaperon
Wings
8
$0.00
6
Deburred all ready to go…
26
Jan 06, 2022
Left flaperon ready for skins
Wings
15
$0.00
1
25
Jan 03, 2022
Working left flaperon
Wings
20
$0.00
1
Deburring, priming, drilling…
24
Jan 01, 2022
All ribs installed
Wings
20
$0.00
2
Had a rough time getting rivets in between the inboard ribs, but finally made it happen.
Still missing stub spars, so moving on to the flaperons. Already drilled two holes in the 1st stainless counterweight. Scary.
23
Dec 26, 2021
Uh oh - fuselage kit
Fuselage
1
$0.00
1
First July, then September, then November, now no date at all for fuse kit crating…
22
Dec 26, 2021
Finished right wing ribs
Wings
8
$0.00
3
Waiting on stub spars and doublers…
21
Dec 26, 2021
Installing forward ribs - right wing
Wings
5
$0.00
1
Working around backordered parts makes life “ interesting “.
Moving forward on faith stuff will show up.
20
Dec 21, 2021
Rear ribs attached on both wings
Wings
40
$10.00
2
Had to replace only about 40 rivets…don't ask…(read those “Notes”!?!?) but finally have the rear spars on. Still waiting on spar doublers and stub spars. Dang it. Might move on to the flaperons instead.
19
Dec 16, 2021
Wing rib install
Wings
20
$0.00
5
Progress
18
Dec 15, 2021
Debur ribs
Wings
60
$0.00
2
Finished deburring all wing ribs…whew…
17
Dec 05, 2021
Work under way on wings - shop useable
Wings
60
$0.00
6
Organizing, deburring, preparing spars and ribs…try to keep tidy…
16
Dec 05, 2021
Received wing crates
Wings
4
$900.00
10
Picked up wing crates in Greenville ABF distribution center. No damage.
15
Oct 01, 2021
Vans tells me that I will hear from the shipping company bringing my fuselage and wing kits to Saluda.
Wings
1
$0.00
1
4 to 6 weeks to crate !?!
14
Jul 01, 2021
Building going well
Workshop
0
$0.00
4
13
Mar 27, 2021
Ordered the fuselage kit
Fuselage
1
$7365.00
0
Sent in the order form for the 12iS fuselage kit - 6 months to ship !?!
12
Mar 18, 2021
Wing kit crate date
Empennage
0
$0.00
0
Vans informed me the wing kit should ship early july. Ahhhhhh!!!!
11
Feb 04, 2021
Ordered wing kit from Vans
Wings
2
$9623.51
0
deposit in the amount of $2405.88
10
Feb 01, 2021
Picked up empennage kit
Empennage
15
$2650.00
1
Round trip road trip Nc to Fl to load up tail kit and tools in a rented uhaul
9
Jan 26, 2021
Picking up the tail kit next week
Empennage
1
$0.00
0
8
Jan 21, 2021
Covid killed me
Tools
0.1
$0.00
0
Covid messed me up. Looking for a more realistic project...switching to RV-12is.
7
May 12, 2020
Changed Target Aircraft - Now RV-14 ( IFR needs )
Tools
1
$0.00
0
After much deliberation and research, based upon real-world-experiences, changed my choice from the RV-7 to the RV-14.
6
Apr 09, 2020
Ordered even more tools
Tools
2
$0.00
0
5
Apr 09, 2020
Completed toolbox and #1 practice piece
Research
8
$0.00
4
4
Mar 22, 2020
Vans Plans on USB
Research
1
$13.56
0
Ordered Vans USB drive with preview plans for RV-7
3
Mar 22, 2020
Registered for RV class and AirVentures 2020
Research
1
$474.00
0
Vans RV class at AirVentures 2020 and camping and tickets (2) for entire week
2
Mar 22, 2020
Ordered Vans practice kits
Research
1
$91.63
0
Practice project #1 and tool box for practicing/learning
1
Mar 22, 2020
Ordered Tools from Cleveland and Brown Tools
Tools
4
$0.00
0
Ordered drill, rivet gun, hand squeezer, deburring tools, etc,...
------------
--------------
-------------
Totals
1446.1
$121270.70
336
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.