Entry #CreatedTitleCategoryHours     Cost # Pictures
60     Jun 04, 2020 Riveted fuel tanks on Wings 3 $0.00    1   
After filling tanks completely full and letting them set for 5 days, I was happy to have no leaks! Went ahead and riveted them on .
 
59     May 29, 2020 Dissassembled Carb Fuel System 1 $0.00    1   
Disassembled carb for minor overhaul.
 
58     May 29, 2020 Baggage compartment & Elevator push rod tunnel. Fuselage 8 $0.00    3   
Today I worked on finishing the elevator push rod tunnel installation and also fabricated the optional baggage compartment panels. Then I installed the previously fitted top skin formers aft of the seat. I also filled both fuel tanks to be sure that there are no leaks before installing them to the wings.
 
57     May 14, 2020 Fitting wings and flaps to fuselage etc Wings 14 $0.00    12   
Cut flaps to length, installed inboard rib on both flaps after cutting. Installed drive horn for flap linkage. Mad spring mounts for flap retainer for folding wings. Finished fitting wing walk doubler and riveted it on. Finished riveting wing skins on. Ready for fuel tank install.
 
56     May 12, 2020 Aileron and flap rigging Wings 12 $0.00    8   
Installing bell cranks, push rods and joiners for aileron and flap controls. Finished installing control stick. Finished flap handle. Prepped for cutting flaps s12 inches shorter.
 
55     Apr 29, 2020 Installed optional folding wing components. Wings 4 $0.00    6   
Fitted wing support brackets to fuselage which included drilling through the side skins and one additional hole through a gusset on the forward hole of bracket. Fabricated the universal joint on the brackets and also the wing support slide tubes so they are ready to install later on.
 
54     Apr 29, 2020 Flap lever and linkage Controls 3 $0.00    2   
Installed flap lever and adjuster arms.
 
53     Apr 24, 2020 Aileron bell crank installations. Controls 6 $0.00    7   
Installed bearings in bell cranks and made aileron push tubes. Cut clearance for bell crank on number 1 wing rib on left wing.
 
52     Apr 23, 2020 Installed Wings Wings 6 $0.00    8   
Installed wings and adjusted the guide plates and rollers. Checked wing incidence after leveling fuselage. Then we measured triangulation from firewall to back corners of each wing. It was withing 1/32"". Very happy with how easy this step was, lock pins slide in effortlessly after proper adjustment. Drilled rear spar holes once everything was set. Drilled aileron joiner and removed wings. Installed nylon spacers for rear spars. Began assembly of aileron push tubes.
 
51     Apr 22, 2020 Finished installing elevator trim cable. Completed final assembly of tail section. Installed spar guide blocks and adjusters. Installed flap detent plate. Controls 6 $0.00    5   
Finished installing elevator trim cable. Completed final assembly of tail section. Installed spar guide blocks and adjusters. Installed flap detent plate.
 
50     Apr 21, 2020 Riveted tail section after rigging. Controls 2 $0.00    0   
Riveted tail section after rigging.
 
49     Apr 21, 2020 Riveted tail section after rigging. Controls 2 $0.00    1   
Riveted tail section after rigging.
 
48     Apr 21, 2020 Riveted bottom forward skin on, worked on fitting rudder pedals. Fuselage 3 $0.00    0   
Riveted bottom forward skin on, worked on fitting rudder pedals.
 
47     Apr 21, 2020 Cheek and joggle fitment, exhust tunnel. Fuselage 8 $0.00    1   
Fit left side cheek former's and skin. Finished fitting both cheeks, de burred and dimpled cheeks and former's. Began fitting joggle strips for cowling.
 
46     Apr 20, 2020 Installed aileron hinges and riveted skins on to right wing. Wings 6 $0.00    1   
Riveted right skins on, drilled and installed both aileron hinges to rear spars.
 
45     Apr 20, 2020 Riveted more ribs. Ran pitot tube. Conduit Wings 7 $0.00    2   
Riveted left wing ribs to main spar. Installed pitot tubing through ribs. Installed plastic conduit through ribs for wiring. Installed bearings in aileron bell cranks. Squared left wing for skinning.
 
44     Apr 19, 2020 Fuselage construction Fuselage $0.00    1   
 
43     Apr 19, 2020 O-320 A1A Assembly Engine 40 $0.00    7   
Assembly and powder coating of O-320.
 
42     Apr 16, 2020 Elevator balance, rudder cables, return springs etc Controls 12 $0.00    7   
Installed elevator balance weight, installed rudder cables, installed rudder return springs and bracket, installed rudder pedal adjusters. Fitted rudder horn stops. Ran elevator trim cable. Checked rudder travel.
 
41     Oct 29, 2019 Finished elevator aft push tube and painted it. Worked on elevator balance weight brackets. Made master cylinder extensions and mounted master cylinders. Set brake pedal locations. Controls 7 $0.00    6   
Finished elevator aft push tube and painted it. Worked on elevator balance weight brackets. Made master cylinder extensions and mounted master cylinders. Set brake pedal locations.
 
40     Oct 28, 2019 Removed vertical stabalizer to install elevator down stop. Worked on elevator aft push pull tube. Controls 4 $0.00    4   
Removed vertical stabilizer to install elevator down stop. Worked on elevator aft push pull tube.
 
39     Oct 15, 2019 Removed Elevators and riveted inner ribs and drive horns onto inner ribs. Reinstalled elevators and re leveled. Drilled hole in drive horn for heim bearing installation per build manual. Fuselage 5 $0.00    0   
Removed Elevators and riveted inner ribs and drive horns onto inner ribs. Reinstalled elevators and re leveled. Drilled hole in drive horn for heim bearing installation per build manual.
 
38     Sep 13, 2019 Installed elevators and leveled and fixtured for elevator drive horn installation Fuselage 2 $0.00    5   
Installed elevators and leveled and fixtured for elevator drive horn installation
 
37     Sep 12, 2019 Assembled and installed control stick assembly. Installed nylon slide nblocks for wing spars. Fuselage 14 $0.00    4   
Assembled and installed control stick assembly. Installed nylon slide nblocks for wing spars.
 
36     Sep 11, 2019 Installed rudders and brake pedals. Installed upper and lower nylon blocks for spar sliders. Fuselage 4 $0.00    0   
Installed rudders and brake pedals. Installed upper and lower nylon blocks for spar sliders.
 
35     Aug 21, 2019 Bottom skin fitting, assembly of rudder and brake pedals. Fuselage 8 $0.00    0   
Did final fit of bottom skin and prepped for final riveting. Started assembling rudder and brake pedals.
 
34     Aug 20, 2019 Upper panel, seat back construction. Fuselage 12 $0.00    11   
Built forward upper fuselage panel between inst cluster and firewall. Built seat back assembly.
 
33     Aug 01, 2019 Fit front cheek former's. Fuselage 5 $0.00    4   
Fit front cheek former's.
 
32     Jul 26, 2019 Fit vertical stabilizer, worked on main gear Fuselage 9 $0.00    10   
Fit vertical stabilizer and up drilled and bolted on to tail cone and horizontal. Fit and prepped main landing gear for paint. Made attach brackets for main gear and painted all components. Mounted tires to wheels.
 
31     Jul 25, 2019 Fit and up drilled all horizontal brackets Fuselage 5 $0.00    1   
Fit and up drilled all horizontal brackets and mounted horizontal with bolts. Began fitting vertical stabilizer.
 
30     Jul 10, 2019 Fit horizontal tail and brackets Fuselage 5 $0.00    4   
Fit horizontal tail and brackets. Leveled and squared horizontal to fuselage. Trimed horizontal to fit tail cone. Appled service bulliten to correct angle of incidence to 0 degrees.
 
29     Jun 20, 2019 Joining tail cone to front cage. Fuselage 14 $0.00    5   
Fit front fuselage to tail cone, remove, debur and dimple holes. Bolt two together.
 
28     Jun 19, 2019 Started fitting skins to fuselage cage. Fuselage 4 $0.00    3   
Started fitting skins to fuselage cage.
 
27     Jun 12, 2019 Tailcone final assembly Fuselage 8 $0.00    2   
Assembled and worked on final assembly of tail cone. Finsihed all riveting except bottom skin to longerons.
 
26     Jun 06, 2019 Tail spring mount and tail cone rear. Fuselage 16 $0.00    4   
Finished assembling tail cone and tail spring mount. Dissassembled for debur and dimpling.
 
25     Jun 02, 2019 Worked on assembly of push rod tube cover. Fuselage 4 $0.00    1   
Worked on assembly of push rod tube cover.
 
24     May 22, 2019 Assembled side panels and bottom panel to bulkheads, squared assembley and updrilled. Fuselage 8 $0.00    3   
Assembled side panels and bottom panel to bulkheads, squared assembley and updrilled.
 
23     Apr 24, 2019 Assembled upper formers and upper skins on rear fuselage. Fuselage 3 $0.00    3   
Assembled upper formers and upper skins on rear fuselage.
 
22     Apr 22, 2019 Fitted longerons & stiffners to rear tail cone panels. Wings 8 $0.00    1   
Fitted longerons and stiffners to rear tail cone side pannels. Disassemled, deburred and dimpled rear cone side panels.

 
21     Apr 21, 2019 Fitted and assembled bulkheads. Fuselage 5 $0.00    1   
Fitted and assembled bulkheads.
 
20     Apr 16, 2019 Installed elevator balance weight, installed rudder cables, installed rudder return springs and bracket, installed rudder pedal adjusters. Fitted rudder horn stops. Ran elevator trim cable. Checked rudder travel. Controls 12 $0.00    0   
Installed elevator balance weight, installed rudder cables, installed rudder return springs and bracket, installed rudder pedal adjusters. Fitted rudder horn stops. Ran elevator trim cable. Checked rudder travel.
 
19     Apr 10, 2019 Fitted fuel tanks to wings Wings 8 $0.00    3   
Fitted fuel tanks to wings and drilled holes where needed to tank attachment to spars. Deburred and dimpled. Countersunk spars where needed.
 
18     Feb 22, 2019 Left & Right fuel tank assembly proceedure. Wings 33 $0.00    13   
Assembled left fuel tank, installed fuel sender and made float arm to specs. Fitted fuel cap flanges and fuel tank drains. Dissasembled, deburred and dimpled left tank. Cleaned and scuffed skin. Installed fuel sender and used Flamemaster B2 while riveting fuel cell together. Same process used for right tank.
 
17     Feb 19, 2019 Built fuel tank jig. Fuel System 2 $0.00    4   
Made fuel tank jig for fuel tank construction.
 
16     Feb 18, 2019 Finished wings, on to fuel cells. Wings 12 $0.00    1   
Installed wing skins and leading edge skin. Deburred and dimpled all skins. Deburred ribs and dimpled ribs. Countersunk spars, riveted rear spr plate on, dimpled rear spar, installed skins on.
 
15     Feb 17, 2019 Squared and leveled right wing, began installing upper wing skins. Wings 2 $0.00    1   
Squared and leveled right wing, began installing upper wing skins.
 
14     Feb 09, 2019 Installed pitot tube connection and riveted the skins on the left wing. Wings 4 $0.00    3   
Installed pitot tube connection and riveted the skins on the left wing.
 
13     Feb 08, 2019 Debur, dimple and countersink. Wings 4 $0.00    2   
Debuured and dimpled the left wing ribs and countersunk main spars. Installed skins back on to wing. Checked all hole alignment and dimples.
 
12     Feb 07, 2019 Debur, dimple repeat. Wings 8 $0.00    3   
Worked on deburring and dimpling left wing skins. Installed pitot doubler and pitot fitting. Started deburring ribs and preparing to dimple ribs. Finished dimpling left wing skins.
 
11     Feb 06, 2019 Removed skins from left wing for deburring and dimpling. Made inspection plates for both wings and installed left plate on skin. Wings 8 $0.00    3   
Removed skins from left wing for deburring and dimpling. Made inspection plates for both wings and installed left plate on skin.
 
10     Feb 05, 2019 Fitted all skins and updrilled to #40 on left wing. Wings 7 $0.00    5   
Fitted all skins and updrilled to #40 on left wing.
 
9     Feb 03, 2019 Mounted right wing ribs and riveted. Wings 5 $0.00    3   
Riveted right wing ribs to main spar. Started on left wing.
 
8     Feb 02, 2019 Shortened rear spars as per plans for sport wing. Cut holes in rear spars for aileron drive linkage. Wings 2 $0.00    1   
Shortened rear spars as per plans for sport wing. Cut holes in rear spars for aileron drive linkage.
 
7     Jan 31, 2019 Spar construction Wings 52 $0.00    7   
Spent 52 hours assembling both wing spars using hydrolic squeezer from SPA. Worked out great!
 
6     Jan 24, 2019 Wing construction Wings $0.00    8   
Wing construction
 
5     Jan 17, 2019 Aileron Construction Controls 16 $0.00    8   
Started and finished ailerons.
 
4     Dec 22, 2018 Flap construction Controls 11 $0.00    1   
Construction of flaps and installation of flap hinges.
 
3     Jan 26, 2018 Building of the empennage. Empennage 62 $0.00    12   
Photos of the horizontal stabilizer, vertical stabilizer, elevator and rudder.
 
2     Jan 09, 2018 Kit Delivered, Inventory checked. Unpacked Workshop 5 $0.00    3   
Kit delivered, had some damage to cowling, but everything was fine. Unpacked everything, checked for damage and organized the parts and hanger.
 
1     Dec 31, 1969 Set up wing jigs and began working on wing ribs. Wings 16 $0.00    4   
Set up wing jigs and began modifying the wing ribs according to build manual.
  ------------ -------------- ------------- Totals562    $0.00    230   