272     Mar 19, 2024 Secure horizontal incidence adjustments Tail Feathers 1 $0.00    3   
271     Mar 18, 2024 Cowling work Engine 2.5 $0.00    6   
270     Mar 18, 2024 Pushrod ends all secured and locktite applied Wings 1 $0.00    3   
269     Mar 18, 2024 Wing root cuffs bonded Wings 2 $0.00    2   
268     Mar 16, 2024 Wing lower gap seal left side Wings .7 $0.00    2   
267     Mar 15, 2024 Wing lower gap seal right side Wings 1.2 $0.00    3   
266     Mar 14, 2024 Left flap gap seal Wings .7 $0.00    2   
265     Mar 13, 2024 Adjusting flap bellcranks (missed previously) Wings 1.2 $0.00    4   
264     Mar 13, 2024 Right side flap gap seal Wings 1.2 $0.00    2   
263     Mar 11, 2024 Rigging ailerons Wings 3 $0.00    3   
262     Mar 07, 2024 Fitting/adjusting ailerons Wings 2 $0.00    1   
261     Mar 06, 2024 Balance ailerons and paint flap gap seals Controls 1 $0.00    2   
260     Mar 02, 2024 Finish cut wing cuffs and paint edge Wings 1 $0.00    1   
259     Mar 01, 2024 Windshield bonding Fuselage 1 $0.00    5   
258     Feb 29, 2024 Z strips windshield riveted Fuselage .5 $0.00    2   
257     Feb 27, 2024 Windshield/skylight hold down strips riveted Fuselage 1.5 $0.00    2   
256     Feb 26, 2024 Riveting skylight hold down strips Fuselage 1 $0.00    2   
255     Feb 25, 2024 Front middle hold down strip added Fuselage 1 $0.00    1   
254     Feb 24, 2024 Cleco windshield & skylight Fuselage 1.5 $0.00    4   
253     Feb 23, 2024 Fitting windshield Fuselage 1.5 $0.00    3   
252     Feb 21, 2024 Boot Cowl part deux (but correct) Fuselage 3 $0.00    7   
251     Feb 20, 2024 Top of boot cowl with foam tape (wrong) Fuselage 2 $0.00    2   
250     Feb 18, 2024 Boot cowl mistakes (continued) Fuselage 3 $0.00    2   
249     Feb 17, 2024 Boot cowl closing fail Fuselage 3 $0.00    4   
248     Oct 17, 2023 Aileron cable tensioned Wings .5 $0.00    0   
247     Oct 16, 2023 Correct Aileron Cable Twist Wings 1 $0.00    0   
246     Oct 15, 2023 Torque Wing Attach bolts Wings 1 $0.00    0   
245     Jun 19, 2023 Masking stripes layout left Paint / Decals .5 $0.00    3   
244     Jun 18, 2023 Mask stripe lines right Paint / Decals .8 $0.00    3   
243     May 30, 2023 Cabin Door Right Fuselage 3 $0.00    2   
242     May 19, 2023 Air box assembly Engine 2 $0.00    7   
241     May 18, 2023 Manifold pressure line to ignition Engine 1 $0.00    10   
240     May 15, 2023 Registration forms sent to FAA Research 1 $0.00    1   
239     May 14, 2023 Phasing Ignition Coils, add ground wire Engine 3 $0.00    4   
238     May 13, 2023 Throttle & mixture cables anchored Controls 4 $0.00    6   
237     May 12, 2023 Install fuel injection servo (start) Engine 4.5 $0.00    5   
236     May 12, 2023 Securing various wires / bundles Avionics 3 $0.00    5   
235     May 11, 2023 Wasted time Bedliner floor cover. Interior Finish 1 $0.00    2   
234     May 11, 2023 LSE a ignition power wires configured Engine 1.5 $0.00    2   
233     Apr 15, 2023 ELT Install Avionics 6 $0.00    12   
232     Apr 14, 2023 O A T probe wire added to GSU 25 D-Sub Avionics 2 $0.00    5   
231     Apr 09, 2023 Solder phone and mic plugs Avionics 1.5 $0.00    2   
230     Apr 08, 2023 Header tank trim and fuel pump power wires Fuel System 1.0 $0.00    4   
229     Apr 05, 2023 Control grip moles connections Avionics 1 $0.00    2   
228     Apr 05, 2023 Lightspeed ignition wiring Engine 2 $0.00    3   
227     Apr 03, 2023 Coil mount brace / Lightspeed wiring Engine 3 $0.00    3   
226     Apr 02, 2023 Engine fittings and some electrical Engine 2 $0.00    3   
225     Apr 01, 2023 Ignition leads and oil cooler connections Engine 5 $0.00    12   
224     Mar 29, 2023 Alternator B lead and securing wires Engine 4 $0.00    8   
223     Mar 28, 2023 Securing wires Engine 3 $0.00    5   
222     Mar 27, 2023 Starter power cable Engine 1.5 $0.00    3   
221     Mar 26, 2023 Top side engine items Engine 2.5 $0.00    13   
220     Mar 24, 2023 Exhaust gaskets installed Engine 1 $0.00    1   
219     Mar 16, 2023 Oil cooler mounted Engine 1.5 $0.00    3   
218     Mar 15, 2023 Start oil cooler mount Engine 1 $0.00    1   
217     Mar 14, 2023 Baffle ties and EGT probes Engine 5 $0.00    10   
216     Mar 13, 2023 CHT probes, wrapping baffles Engine 3 $0.00    8   
215     Mar 12, 2023 LSE sensors mounted, other wiring Engine 5 $0.00    9   
214     Mar 11, 2023 Prep work for wiring engine Engine 2.5 $0.00    2   
213     Mar 10, 2023 Final prep & Hang engine Engine 3 $0.00    10   
212     Mar 09, 2023 Finish baffle frames Engine 5 $0.00    7   
211     Mar 08, 2023 Cooling baffles Engine 3 $0.00    7   
210     Mar 07, 2023 Cooling baffles inlet ramp support angles. Engine 4 $0.00    3   
209     Mar 06, 2023 Cooling baffles Engine 5 $0.00    15   
208     Mar 05, 2023 Ignition coils and cooling baffles Engine 6 $0.00    13   
207     Mar 03, 2023 Electrical study Engine 3 $0.00    9   
206     Mar 02, 2023 Uncrate engine Engine 1.5 $0.00    9   
205     Mar 01, 2023 Electrical on firewall Firewall 2 $0.00    3   
204     Feb 28, 2023 Firewall transducer manifold and red cube Firewall 5 $0.00    3   
203     Feb 26, 2023 Wiring stick grips Avionics 2 $0.00    5   
202     Feb 22, 2023 Switch antenna connectors Avionics 1.5 $0.00    2   
201     Feb 12, 2023 Fire Extinguisher bracket Instrument Panel 1.5 $0.00    5   
200     Jan 30, 2023 Battery box Fuselage 1 $0.00    3   
199     Jan 23, 2023 Throttle & Mixture cables mounted Firewall 1 $0.00    3   
198     Jan 21, 2023 Park brake cable installation Firewall 2 $0.00    5   
197     Jan 20, 2023 Route brake lines Firewall 2 $0.00    12   
196     Jan 19, 2023 Brake system components Firewall 1.2 $0.00    4   
195     Jan 18, 2023 Heat box and brake components Firewall 4 $0.00    6   
194     Jan 13, 2023 Gascolator & Ignition boxes fitted Firewall 3 $0.00    9   
193     Jan 12, 2023 Inventory Firewall Foreward kit (start) Workshop 0.8 $0.00    1   
192     Jan 12, 2023 Drilled subpanel for control cables Instrument Panel 1 $0.00    2   
191     Jan 12, 2023 Heater Box install start Firewall 1 $0.00    2   
190     Jan 07, 2023 Panel frame mods / remounting panel Instrument Panel 2 $0.00    3   
189     Jan 05, 2023 Remote mounting avionics Avionics 1.5 $0.00    4   
188     Jan 04, 2023 Lower Boot Cowl Riveted Fuselage 1.1 $0.00    4   
187     Jan 04, 2023 Fairings final tweak Landing Gear 2 $0.00    1   
186     Jan 03, 2023 Belly fairings fitting Landing Gear 2 $0.00    5   
185     Jan 02, 2023 Nut plates for gear leg fairings Landing Gear 2 $0.00    3   
184     Jan 01, 2023 Preparing to fit landing gear fairings Landing Gear 2 $0.00    3   
183     Dec 29, 2022 Mounted IBBS units (2) Avionics 1 $0.00    5   
182     Dec 17, 2022 Exploring placement alternatives Avionics 1.5 $0.00    2   
181     Dec 16, 2022 Rear rudder return cable finish Controls 1 $0.00    2   
180     Dec 15, 2022 Rear return cable for rudder Controls 2 $0.00    4   
179     Dec 14, 2022 Panel prep Instrument Panel 1 $0.00    7   
178     Dec 10, 2022 Trimming belly fairings Landing Gear 1 $0.00    1   
177     Dec 10, 2022 Aileron control cable attached to control stick Controls .5 $0.00    1   
176     Dec 10, 2022 Flap handle install Controls 1.5 $0.00    5   
175     Dec 08, 2022 Aileron cable pulleys installed Controls 3 $0.00    7   
174     Dec 06, 2022 Seat cushions finished Interior Finish .5 $0.00    6   
173     Dec 05, 2022 Seat cushions finished both seats. Interior Finish 2.5 $0.00    5   
172     Dec 04, 2022 Seat padding/cushions Interior Finish 2.5 $0.00    4   
171     Dec 03, 2022 Seat assembly Interior Finish 1.5 $0.00    1   
170     Dec 02, 2022 Seat assembly Interior Finish 1.2 $0.00    4   
169     Dec 01, 2022 Seat assembly Interior Finish 1 $0.00    2   
168     Nov 29, 2022 Seat back pieces and bottom of first seat installed Interior Finish 1.5 $0.00    4   
167     Nov 28, 2022 Seat frames assembled Interior Finish 2.5 $0.00    5   
166     Nov 27, 2022 Seat assembly Interior Finish 2 $0.00    4   
165     Nov 24, 2022 Mounted control stick assembly Controls 2 $0.00    3   
164     May 24, 2022 Sanding primer Wings 3.0 $0.00    0   
163     Feb 05, 2022 Wing tips body work Wings 2.5 $0.00    3   
162     Dec 31, 2021 Seat assembly Interior Finish 2 $0.00    0   
161     Oct 27, 2021 Picked up engine from RANS Engine 0 $0.00    5   
160     Oct 12, 2021 S10-S11 closeout riveted Fuselage .5 $0.00    2   
159     Oct 10, 2021 Prepping S10-S11 closeout Fuselage 1 $0.00    3   
158     Sep 26, 2021 Paint Booth assembly Paint / Decals 0 $0.00    1   
157     Sep 12, 2021 Wing tip Wings .2 $0.00    1   
156     Sep 08, 2021 Paint arrived Paint / Decals .5 $0.00    2   
155     Aug 29, 2021 Sealing RH filler cap to top wing skin Wings 2 $0.00    1   
154     Aug 17, 2021 R H root rib riveted in place Wings 1.5 $0.00    1   
153     Aug 15, 2021 RH filler opening leak check Wings 2 $0.00    2   
152     Aug 14, 2021 RH tank fittings installed Wings 2 $0.00    5   
151     Aug 09, 2021 R H tank filler cap fitting Wings 1.5 $0.00    3   
150     Aug 07, 2021 RH Tank fitting Wings 1 $0.00    4   
149     Jul 17, 2021 Fitting RH wing tank Wings 2 $0.00    2   
148     Jul 05, 2021 Fitting RH wing tip Wings 1.5 $0.00    3   
147     Jun 26, 2021 Trim right wing tip Wings 1 $0.00    1   
146     Jun 22, 2021 Finish riveting left wing root rib Wings 1.2 $0.00    1   
145     May 31, 2021 Rivet left root rib Wings 2.5 $0.00    3   
144     May 16, 2021 Left filler cap installed Wings 4 $0.00    7   
143     May 12, 2021 Left tank fittings Wings 1.5 $0.00    2   
142     May 09, 2021 Left tank filler cap / fitting openings Wings 4.0 $0.00    10   
141     May 08, 2021 Left fuel tank & root rib Wings 3.0 $0.00    3   
140     Apr 27, 2021 Fitting left wingtip Wings 1.5 $0.00    3   
139     Apr 25, 2021 Reglue open area left wingtip. Wings 2.0 $0.00    2   
138     Apr 17, 2021 Rivet doublers inside lift struts Wings 1.5 $0.00    3   
137     Apr 16, 2021 Glue first (left) wingtip Wings 2.0 $0.00    7   
136     Apr 12, 2021 Cutting form/jig to glue wingtips Wings 1.5 $0.00    2   
135     Apr 10, 2021 Wing tip cutting Wings 2.5 $0.00    3   
134     Apr 07, 2021 Wingtip support rib finish trimming Wings 1 $0.00    1   
133     Apr 04, 2021 Firewall deburred, priming forward floor, wingtips Fuselage 3.0 $0.00    11   
132     Mar 27, 2021 Finish instrument panel brow / visor Fuselage .7 $0.00    1   
131     Mar 25, 2021 Instrument panel brow Fuselage 1.0 $0.00    1   
130     Mar 21, 2021 Fitting boot cowl (finish pic) Fuselage .5 $0.00    1   
129     Mar 18, 2021 Fitting upper boot cowl skins Fuselage .7 $0.00    1   
128     Mar 17, 2021 Fitting upper boot cowl skins Fuselage 2 $0.00    5   
127     Mar 16, 2021 Fitting firewall strips Firewall 2.5 $0.00    6   
126     Mar 14, 2021 Upper boot cowl fitting Fuselage 3.0 $0.00    7   
125     Mar 07, 2021 Boot cowl stiffeners Fuselage 2.5 $0.00    4   
124     Mar 06, 2021 Fitting boot cowl Fuselage 1.0 $0.00    4   
123     Mar 04, 2021 Drilling belly skins to firewall Firewall 1 $0.00    2   
122     Mar 03, 2021 Cleco riveted firewall to fuselage Firewall 1 $0.00    2   
121     Mar 01, 2021 Deburred firewall, begin riveting Firewall 1 $0.00    0   
120     Feb 28, 2021 Turn over fuselage, more riveting Fuselage 3 $0.00    10   
119     Feb 26, 2021 Riveting belly & forward side skins Fuselage .5 $0.00    3   
118     Feb 25, 2021 Reassemble belly skins and forward side skins Fuselage 1.0 $0.00    0   
117     Feb 23, 2021 Add stiffeners to belly skin Fuselage .7 $0.00    1   
116     Feb 22, 2021 Belly and side skins deburring Fuselage 1.5 $0.00    0   
115     Feb 21, 2021 Fitting / drilling belly skin and side skins Fuselage 2 $0.00    3   
114     Feb 17, 2021 Fitting seat slide rails Fuselage 2.0 $0.00    3   
113     Jan 02, 2021 Tailcone top skins and S4 closeout Fuselage 5 $0.00    6   
112     Dec 26, 2020 Rear baggage floor Interior Finish 2 $0.00    1   
111     Dec 23, 2020 Pics of fuse to tail attach Fuselage 2 $0.00    4   
110     Dec 22, 2020 Rudder cable system Controls 1.5 $0.00    1   
109     Dec 20, 2020 Rudder cable system Controls 3 $0.00    5   
108     Dec 15, 2020 Riveted the big attach Fuselage 2 $0.00    4   
107     Dec 09, 2020 Magnetometer mount and work on the big attach Fuselage 3 $0.00    3   
106     Dec 06, 2020 Drilling attach fittings Fuselage 3 $0.00    6   
105     Dec 03, 2020 Drilling attach fittings Fuselage 3 $0.00    5   
104     Nov 29, 2020 Prep for cage to tail cone attach Fuselage 2 $0.00    12   
103     Nov 26, 2020 Tail one side skins attached Fuselage 5 $0.00    13   
102     Nov 24, 2020 Tailcone side skins prep Fuselage 1 $0.00    1   
101     Nov 23, 2020 Attach bulkheads to tailcone bottom Fuselage 2.0 $0.00    6   
100     Nov 22, 2020 Tailcone belly stringers, etc. continued Fuselage 1.5 $0.00    5   
99     Nov 21, 2020 Rivet longerons, stringers and access cover frames to belly skin of tailcone Fuselage 1.5 $0.00    2   
98     Nov 20, 2020 Tail one belly skin prep Fuselage 1 $0.00    1   
97     Nov 19, 2020 lol bulkheads done Fuselage 1.0 $0.00    2   
96     Nov 18, 2020 Bulkhead assembly Fuselage .7 $0.00    2   
95     Nov 17, 2020 Fuse bulkhead assembly. Fuselage 1.5 $0.00    3   
94     Nov 15, 2020 Assemble RH aileron. Wings 3.5 $0.00    3   
93     Nov 14, 2020 Finish RH flap Wings 1.5 $0.00    3   
92     Nov 12, 2020 RH flap construction Wings 2.0 $0.00    2   
91     Nov 11, 2020 Finish riveting lower skin, inspection cover mounts RH wing Wings 1.0 $0.00    4   
90     Nov 10, 2020 Nearly finish riveting lower skin RH wing Wings 3.5 $0.00    1   
89     Nov 08, 2020 Countersink leading edge/front spar RH wing Wings 2.5 $0.00    6   
88     Nov 07, 2020 Flip RH wing for bottom skin, fix tie down placement Wings 3 $0.00    4   
87     Nov 04, 2020 Scotchbright rivets smooth RH wing top skin. Wings 1 $0.00    1   
86     Nov 01, 2020 Flap & aileron gap seals RH wing Wings 3 $0.00    4   
85     Oct 29, 2020 Riveting top skin RH cont. Wings 1 $0.00    1   
84     Oct 27, 2020 Pick up FWF kit Firewall 0 $0.00    2   
83     Oct 27, 2020 Riveting top skin Wings 1.5 $0.00    1   
82     Oct 25, 2020 Match drill RH leading edge/spar Wings 5 $0.00    5   
81     Oct 24, 2020 Flap cable, electric wire, top skin start RH Wings 4 $0.00    3   
80     Oct 22, 2020 Aileron cable and guide RH Wings 1.0 $0.00    2   
79     Oct 18, 2020 Assemble interior of RH wing Wings 5 $0.00    5   
78     Oct 13, 2020 Bolt truss to front spar RH Wings 1 $0.00    3   
77     Oct 12, 2020 Strut truss fittings drilled/fitted RH Wings 1.2 $0.00    2   
76     Oct 11, 2020 RH landing light cut, bell cranks assembled Wings 2.5 $0.00    3   
75     Oct 10, 2020 Right wing started Wings 1 $0.00    3   
74     Oct 07, 2020 Test fit left aileron for clearance Wings .2 $0.00    2   
73     Oct 04, 2020 Left aileron assembly Wings 1.5 $0.00    5   
72     Sep 27, 2020 Assemble / rivet left flap, test fit on wing Wings 2.0 $0.00    13   
71     Sep 25, 2020 Left flap assembly Wings 1.0 $0.00    4   
70     Sep 22, 2020 Store wing, begin flap - left Wings .5 $0.00    3   
69     Sep 21, 2020 Rivet inspection cover rings, wing cradle Wings 1.5 $0.00    3   
68     Sep 20, 2020 Riveting bottom skin left wing (cont.) Wings 2.0 $0.00    4   
67     Sep 19, 2020 Rivet bottom skin left wing Wings 3.0 $0.00    5   
66     Sep 07, 2020 Fitting lower skin , drill leading edge (left wing) Wings 5.0 $0.00    8   
65     Sep 06, 2020 Plumb pitot lines 2nd time, inspection cover tabs clecoed Wings 2.0 $0.00    6   
64     Sep 05, 2020 Gretz pitot mount pt 3 Wings 1.0 $0.00    3   
63     Sep 03, 2020 Gretz pitot mount pt 2 Wings .5 $0.00    1   
62     Aug 30, 2020 Gretz pitot mount install- start Wings 1.5 $0.00    2   
61     Aug 24, 2020 Plumb pitot lines 1st method Wings 1.2 $0.00    1   
60     Aug 22, 2020 Wiring left wing Wings 1.5 $0.00    5   
59     Aug 19, 2020 Turn left wing over for bottom work Wings .5 $0.00    1   
58     Aug 16, 2020 Rivet flap /aileron gap seals (left wing) Wings 1.0 $0.00    4   
57     Aug 10, 2020 Begin fitting flap / aileron gap seals, drilling Wings 1.5 $0.00    1   
56     Aug 08, 2020 Continue riveting top skin (left wing) Wings 2.5 $0.00    5   
55     Aug 04, 2020 Riveting top skin (left wing), remembering Dad Wings 2.0 $0.00    4   
54     Aug 03, 2020 Pull countersink rivets leading edge top skin (left wing) Wings 1.5 $0.00    1   
53     Aug 02, 2020 Cleco top skin (left wing) Wings 1.5 $0.00    1   
52     Aug 01, 2020 Countersink front spar for top skin (left wing) Wings 1.0 $0.00    1   
51     Jul 31, 2020 Dimple leading edge upper wing skin Wings 1.0 $0.00    2   
50     Jul 30, 2020 Top wing skin left wing layed up, march drill to front spar Tools 2.5 $0.00    6   
49     Jul 26, 2020 Splice join aluminum 2x4’s Tools 0.1 $0.00    3   
48     Jul 25, 2020 Landing light lens hole cut out Wings 2.0 $0.00    5   
47     Jul 25, 2020 Landing light lens hole cut out Wings 2.0 $0.00    5   
46     Jul 23, 2020 Aileron cable (left) and wire grommets, flap cable Wings 2.0 $0.00    4   
45     Jul 22, 2020 Aileron and flap bell cranks install Wings 5.0 $0.00    3   
44     Jul 21, 2020 Rivet ribs to front spar, bolt truss rear Wings 2.0 $0.00    4   
43     Jul 19, 2020 Cleco ribs to rear spar Wings 2.5 $0.00    5   
42     Jul 14, 2020 Ribfest Wings 3.5 $0.00    7   
41     Jul 13, 2020 Wing truss joined to front spar Wings 1.5 $0.00    5   
40     Jul 12, 2020 Bellcrank assemblies left wing Wings 2.5 $0.00    4   
39     Jul 11, 2020 Wing spar doublers-left wing Wings 2.0 $0.00    6   
38     Jul 09, 2020 Piece gathering Wings 2.0 $0.00    2   
37     Jul 06, 2020 Deburring front spar / leading edge Wings 2.0 $0.00    1   
36     Jul 05, 2020 Elevator tips start to finish Empennage 7.0 $0.00    16   
35     Jul 04, 2020 Attach trim tab to elevator and rivet lower skin on elevator. Empennage 5.0 $0.00    6   
34     Jul 02, 2020 Attach trim tab hinges Empennage 1.5 $0.00    3   
33     Jul 01, 2020 Prep elevator for trim tab install Empennage 1.0 $0.00    2   
32     Jun 30, 2020 Rivet trim tab Empennage 1.5 $0.00    2   
31     Jun 29, 2020 Drill trim tab spar, one edge Empennage 2.0 $0.00    3   
30     Jun 28, 2020 Rivet top elevator skin Empennage 3.0 $0.00    4   
29     Jun 27, 2020 Elevator assembly Empennage 6.0 $0.00    6   
28     Jun 22, 2020 Elevator frame prep and assembly Empennage 2.0 $0.00    2   
27     Jun 15, 2020 Riveting horizontal stabilizer 3 Empennage 2.0 $0.00    4   
26     Jun 14, 2020 Riveting horizontal stabilizer skins 2 Empennage 2.0 $0.00    3   
25     Jun 13, 2020 Riveting Horizontal Stabilizer skins Empennage 2.0 $0.00    4   
24     Jun 11, 2020 Dimple Horiz Stab ribs & skins Empennage 2.0 $0.00    9   
23     Jun 10, 2020 Countersink Horiz Stab frame Empennage 1.0 $0.00    2   
22     Jun 09, 2020 Deburring horizontal stabilizer skins Empennage 1.0 $0.00    1   
21     Jun 08, 2020 Deburring horizontal stabilizer skins Empennage 1.2 $0.00    2   
20     Jun 06, 2020 Drill spars on horizontal stabilizer Empennage 4.0 $0.00    7   
19     Jun 04, 2020 Rivet servo ribs into elevator frame Empennage 1.5 $0.00    3   
18     Jun 03, 2020 Riveting elevator framework Empennage 1.5 $0.00    4   
17     Jun 02, 2020 Elevator horn install and start riveting elevator frame Empennage $0.00    0   
16     Jun 02, 2020 Elevator horn install and start riveting elevator frame Empennage $0.00    5   
15     May 31, 2020 Elevator frame layout and elevator horn fitting Empennage 2.5 $0.00    10   
14     May 30, 2020 Rolling elevator skins Empennage 2.0 $0.00    2   
13     May 25, 2020 Horizontal stabilizer skin prep Empennage 2.0 $0.00    5   
12     May 24, 2020 Tail pull handle and Horizontal Stabilizer frame Empennage 5.5 $0.00    10   
11     May 21, 2020 Rivet right side of vertical stabilizer Empennage 2.5 $0.00    3   
10     May 19, 2020 Finish riveting left side vertical stabilizer Empennage 1.5 $0.00    2   
9     May 18, 2020 Riveting vertical stabilizer Empennage .5 $0.00    0   
8     May 17, 2020 Vertical stabilizer skin and leading edge fitting Empennage 2.5 $0.00    5   
7     May 16, 2020 Vertical stabilizer pull handle and skin work Empennage 2.0 $0.00    3   
6     May 14, 2020 Vertical Stab frame riveting Empennage 1.5 $0.00    0   
5     May 13, 2020 Vertical stabilizer Empennage $0.00    4   
4     May 12, 2020 Vertical Stab Empennage 2.5 $0.00    2   
3     May 11, 2020 Rudder completed Empennage 2.5 $0.00    0   
2     May 11, 2020 Rudder completed Empennage 2.5 $0.00    3   
1     May 10, 2020 Start-Rudder Empennage 3.0 $0.00    4   
------------ -------------- -------------
Totals538.2    $0.00    1037   