Project: N524JL/N87JL     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours # Pictures
196     Mar 28, 2024 Elevator pushrod Fuselage 1 3   
195     Mar 28, 2024 HS drill and install. Fuselage 6 5   
194     Mar 27, 2024 Static port install Fuselage 2 1   
193     Mar 26, 2024 Began canopy-roll bar Canopy 6 2   
192     Mar 25, 2024 Back at it….. fresh air vents. Fuselage 3 2   
191     Mar 12, 2024 Back on track Workshop 1   
190     Feb 29, 2024 BIG DAY!!!!!! Workshop 3   
189     Feb 28, 2024 Brake lines Fuselage 5 5   
188     Feb 27, 2024 Panel inserts Instrument Panel 10 2   
187     Feb 27, 2024 Sub panel Fuselage 20 4   
186     Feb 26, 2024 Vinyl Wrap swatches Instrument Panel 1 1   
185     Feb 26, 2024 Custom Switches Instrument Panel 4 1   
184     Feb 15, 2024 Panel lay out Instrument Panel 6 7   
183     Feb 06, 2024 Foreword deck mock-up Fuselage 2 5   
182     Feb 03, 2024 Gear weldments Fuselage 12 3   
181     Jan 29, 2024 Completed flap components…. Fuselage 10 9   
180     Jan 24, 2024 Flaps Fuselage 12 4   
179     Jan 19, 2024 Began covers in the foreword fuse Fuselage 10 7   
178     Jan 17, 2024 Seats completed Fuselage 8 4   
177     Jan 05, 2024 Baggage bulkhead cover and seatbelt anchors Fuselage 10 6   
176     Jan 03, 2024 Braided teflon brake and cabin fuel hose kits Fuselage 1   
175     Jan 01, 2024 Tunnel cover pieces Fuselage 4 4   
174     Dec 30, 2023 Seat hinges Fuselage 4 4   
173     Dec 21, 2023 Side steps Fuselage 15 8   
172     Dec 18, 2023 Gussets and top skins Fuselage 10 9   
171     Dec 14, 2023 Seatbelt anchors Fuselage 2 2   
170     Dec 14, 2023 695 gussets complete Fuselage 2 1   
169     Dec 11, 2023 Began positioning F-695 gussets Fuselage 2.5 1   
168     Dec 09, 2023 F-757 Gusset and side rails Fuselage 8 8   
167     Dec 08, 2023 Riveted aft deck Fuselage 1.5 2   
166     Dec 06, 2023 Aft deck Fuselage 5 3   
165     Dec 05, 2023 FLIPPED THE CANOE Fuselage 1 2   
164     Dec 05, 2023 Finished fuselage riveting Fuselage 6 0   
163     Dec 01, 2023 3M Firewall sealant arrived Fuselage 2 2   
162     Nov 17, 2023 Did SB00036 Service B’s 6 4   
161     Nov 13, 2023 Began riveting side skins Fuselage 15 1   
160     Nov 06, 2023 Beginning to rivet fuse Fuselage 4 4   
159     Nov 02, 2023 The carbon panel arrived from aerosport Instrument Panel 1 1   
158     Nov 01, 2023 Completed fuselage prep after disassembly Fuselage 25 5   
157     Oct 10, 2023 Completed fabrication Fuselage 26 11   
156     Sep 25, 2023 Rudder pedals drilled to the longeron. Fuselage 10 5   
155     Sep 13, 2023 James Cowling/plenum/MK3 air in Engine/Cowling 1 1   
154     Sep 12, 2023 Upgraded rudder pedals Fuselage 12 9   
153     Sep 08, 2023 Tank attach bracket angles Fuselage 9 4   
152     Sep 06, 2023 F684 gusset and firewall mount Fuselage 7 6   
151     Sep 03, 2023 Finish kit inventory complete Fuselage 7 1   
150     Aug 25, 2023 Auxiliary and lower longerons Fuselage 11 7   
149     Aug 22, 2023 Build selfie ;) Fuselage 0 1   
148     Aug 21, 2023 Gear weldmant through F772 Fuselage 6 7   
147     Aug 20, 2023 Straps Fuselage 1 1   
146     Aug 20, 2023 Fuselage work continued Fuselage 10 4   
145     Aug 16, 2023 Began fitting firewall Fuselage 3 1   
144     Aug 15, 2023 Finish kit arrived! Fuselage 2   
143     Aug 13, 2023 Bending conical bend F770 Fuselage 3 11   
142     Aug 11, 2023 Center section and aft Fuselage 20 7   
141     Aug 10, 2023 *PHONE AND BUILD PHOTOS GONE* Fuselage 1   
140     Jun 11, 2023 706 bulkhead complete (autopilot) Fuselage 6 4   
139     Jun 09, 2023 706 bulkhead Fuselage 10 6   
138     Jun 08, 2023 Rudder block Fuselage 2 1   
137     Jun 07, 2023 705 bulkhead rivet and finish. Fuselage 8 4   
136     Jun 04, 2023 705 bulkhead Fuselage 5 8   
135     Jun 01, 2023 705 Bulkhead begin Fuselage 7 6   
134     May 30, 2023 Completed center section Fuselage 6 5   
133     May 24, 2023 Firewall complete Fuselage 4 3   
132     May 23, 2023 Began spar center section work Fuselage 8 6   
131     May 09, 2023 Fuselage started! Firewall. Fuselage 3 3   
130     May 07, 2023 Push pull tubes complete (wings done for now) Wings 1 0   
129     May 05, 2023 Push pull tubes Wings 3 2   
128     Apr 28, 2023 Propeller ordered Propeller 0   
127     Apr 28, 2023 Engine ordered Engine/Cowling 0   
126     Apr 27, 2023 Flap hinge work and finish Wings 5 2   
125     Apr 20, 2023 Ailerons and flaps attached Wings 15 3   
124     Mar 30, 2023 Wire purchase Avionics 1   
123     Mar 21, 2023 Weld aileron rods Wings 2 4   
122     Mar 03, 2023 Flaps started Wings 24 14   
121     Mar 01, 2023 Ailerons complete Wings 8 3   
120     Feb 22, 2023 Drilled/dimpled counterweight and leading edge skins Wings 8 5   
119     Feb 16, 2023 Riveting the ailerons Wings 5 7   
118     Feb 08, 2023 Begin ailerons Wings 8 2   
117     Feb 01, 2023 Roll Servo mount Wings 1 1   
116     Jan 23, 2023 Annnddd the arduous inventory has begun Fuselage 3   
115     Jan 17, 2023 Aileron brackets & flap/aileron braces Wings 6 4   
114     Jan 13, 2023 Pitot mast&tube install Wings 6 3   
113     Jan 05, 2023 Fuselage kit has arrived!! Fuselage 2   
112     Dec 15, 2022 Placed right wing in stand and started assembly Wings 5 1   
111     Dec 14, 2022 Left wing complete(ish) Wings 4.5 2   
110     Dec 08, 2022 Bulk of avionics ordered Avionics 1 2   
109     Dec 03, 2022 Right wing begins Wings 5 1   
108     Dec 01, 2022 Hangar issues and a temporary fix Workshop 0   
107     Nov 28, 2022 Left aileron& flap brackets Wings 4 3   
106     Nov 20, 2022 Right tank finished and tested Wings 12 2   
105     Oct 26, 2022 Left tank leak test…. Wings 1 2   
104     Oct 21, 2022 Left tank complete Wings 20 12   
103     Oct 04, 2022 Fuel tanks start of the sticky Wings 6 6   
102     Sep 28, 2022 Rivet the left leading edge to the spar Tools 7 8   
101     Sep 20, 2022 Avionic tools in from stein Tools 1   
100     Sep 14, 2022 Countersink spar& begin preparing skins Wings 12 8   
99     Sep 12, 2022 Left leading edge rivet Wings 8 3   
98     Sep 08, 2022 Upgraded rudder pedals arrived Wings 1   
97     Sep 06, 2022 Repeat for the right tank… Wings 17 2   
96     Aug 27, 2022 Fuel flange and drain Wings 3 3   
95     Aug 26, 2022 Tank access panel Wings 3.5 5   
94     Aug 26, 2022 Tank attach brackets Wings 4.5 6   
93     Aug 21, 2022 Tank/ baffle countersink Wings 3 2   
92     Aug 20, 2022 Stiffeners&Z brackets Wings 3 3   
91     Aug 18, 2022 Tank stiffeners… Wings 2 2   
90     Aug 18, 2022 Fuel tank mock up/fit Wings 8 3   
89     Aug 16, 2022 Leading edge cradle and leading edge Wings 20 5   
88     Aug 12, 2022 Wing jig built / skeleton hung Wings 20 3   
87     Aug 08, 2022 Conduit supports riveted Wings 4 2   
86     Aug 05, 2022 Main ribs riveted Wings 5 1   
85     Jul 28, 2022 Wing wire conduit fab Wings 4.5 4   
84     Jul 24, 2022 Ribs complete Wings 8 7   
83     Jul 15, 2022 Uggghhhhhhhh Wings 20 1   
82     Jul 06, 2022 THE RIBS Wings 2 1   
81     Jul 06, 2022 Aileron spars complete Wings 3 8   
80     Jul 02, 2022 Spar doublers F&E/Final drill fork Wings 4 10   
79     Jun 30, 2022 Aileron spar construction start Wings 6 3   
78     Jun 27, 2022 Finish tie down and bell crank brackets Wings 5 6   
77     Jun 23, 2022 Tie down bracket cont'd Wings 1 3   
76     Jun 21, 2022 Tie down fabrication Wings 8 3   
75     Jun 13, 2022 K1000-4 platenuts (f-704g) Wings 1 2   
74     Jun 10, 2022 Countersink/prime/access panels Wings 11 11   
73     Jun 01, 2022 Tank attach nut plates Wings 4 4   
72     May 20, 2022 Inventory…Inventory….Inventory Wings 15 7   
71     May 19, 2022 WINGS ARE HERE! Wings 1 1   
70     May 11, 2022 Countersinking tips and finish Wings 3   
69     May 05, 2022 Wing tip continued work Wings 3   
68     Apr 11, 2022 Started making reinforcements Wings 3   
67     Apr 05, 2022 Zip Tips arrived!! Wings 7   
66     Nov 09, 2021 Rolled LE and FINISH Empennage 5 2   
65     Oct 29, 2021 Attached trim tab Empennage 4 3   
64     Oct 18, 2021 Trim tab assembly and rivet Empennage 6 6   
63     Oct 12, 2021 Closing up the left elevator& beginning trim tab completion Empennage 6 3   
62     Oct 06, 2021 Left elevator riblet and trim servo Empennage 5.5 11   
61     Sep 25, 2021 Right elevator complete Empennage 4 5   
60     Sep 16, 2021 *****Right elevator flush rivets under horn******* Empennage 1 4   
59     Sep 06, 2021 Right elevator skeleton/end ribs Empennage 3 5   
58     Sep 03, 2021 Bending the elevators Empennage 1 3   
57     Aug 18, 2021 Elevator trim reinforcement plate Empennage 1.5 3   
56     Aug 17, 2021 Elevator stiffeners Empennage 6 2   
55     Aug 16, 2021 Rolling the rudder leading edge Empennage 2 2   
54     Aug 10, 2021 Trailing edge time Empennage 5 7   
53     Aug 04, 2021 Rudder skins on Empennage 5 4   
52     Jul 30, 2021 Rivet the rudder skeleton time Empennage 4 5   
51     Jul 25, 2021 New TE wedge in Empennage 4 1   
50     Jul 15, 2021 The TE wedge…. Empennage 2 5   
49     Jul 14, 2021 Rudder counterweight Empennage 2 3   
48     Jul 12, 2021 Getting ready for the TE Empennage 3.5 1   
47     Jul 10, 2021 Longeron yoke Tools 0   
46     Jul 10, 2021 Rudder ………….. Empennage 3 3   
45     Jul 08, 2021 Beveled counterbalance skin Empennage 2 3   
44     Jul 03, 2021 Rudder cont Empennage 1.5 2   
43     Jul 02, 2021 Began the rudder skeleton. Empennage 5.5 2   
42     Jun 25, 2021 Email from Damien at Aveo Wings 0   
41     Jun 22, 2021 Rudder stiffeners complete Empennage 6 4   
40     Jun 19, 2021 Wings ordered Wings 0   
39     Jun 15, 2021 Beginning rudder Empennage 3 2   
38     Jun 11, 2021 Vertical stabilizer finished Empennage 6 4   
37     Jun 08, 2021 Vert ribs Empennage 3 2   
36     Jun 06, 2021 Vert spar Empennage 3 4   
35     Jun 05, 2021 VERT CONT Empennage 3 2   
34     May 28, 2021 Starting the Vertical Stabilizer Empennage 5 3   
33     May 24, 2021 Finished the horizontal stabilizer!!! Empennage 8 5   
32     May 22, 2021 Front spar and left stabilizer Empennage 8 6   
31     May 19, 2021 No going back….. Empennage 8 5   
30     May 14, 2021 Dirty hands… Empennage 13 3   
29     May 12, 2021 New tool Empennage 1   
28     May 06, 2021 Hole enlarged/response Empennage 1 2   
27     May 04, 2021 Drill HS00001/702/714/710 Empennage 3 1   
26     Apr 30, 2021 VA146 bearing Empennage 3 4   
25     Apr 28, 2021 HS00005&HS00006 Empennage 12 5   
24     Apr 27, 2021 First look at a stabilizer!! Empennage 5 3   
23     Apr 22, 2021 Flange tool Empennage 1 1   
22     Apr 21, 2021 HS 714-710 bend& radius Empennage 4 3   
21     Apr 10, 2021 702 Cont Empennage 3   
20     Apr 10, 2021 ......702 notch continued Empennage 4   
19     Apr 10, 2021 Ok, so here it goes.... 702 notch!! Empennage 3   
18     Apr 10, 2021 Transition to the front spar. Empennage 3 4   
17     Apr 07, 2021 Rear spar Empennage 3.5 1   
16     Apr 06, 2021 Inventory time Empennage 3 1   
15     Apr 04, 2021 It arrived!! Empennage 2   
14     Mar 28, 2021 Practice kits finished Practice 13 4   
13     Mar 26, 2021 Official owner Empennage 1   
12     Mar 17, 2021 EMPENNAGE ORDERED Empennage 1   
11     Mar 12, 2021 Practice kit arrived Practice 5   
10     Mar 10, 2021 Die and bit holder Tools 3 1   
9     Mar 01, 2021 Workshop ready Workshop 1   
8     Feb 12, 2021 More tools purchased Tools 0   
7     Feb 12, 2021 Bought a 29 gallon air compressor Tools 3 1   
6     Feb 02, 2021 Practice Kit(ordered) Research 1 0   
5     Feb 02, 2021 Cleveland Tools Purchase Tools 1 0   
4     Feb 01, 2021 Two more small tables Workshop 12 0   
3     Jan 30, 2021 Purchased and built tables Workshop 12 2   
2     Jan 28, 2021 Years of....... Research 0   
1     Jan 28, 2021 MDF Tops/Saw Workshop 3 0   
------------ -------------
Totals1026    673   