Project: JerAmyRV-10     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours # Pictures
124     Apr 02, 2024 Workshop Ongoing Workshop 1   
123     Feb 01, 2024 Barn is getting really close to finished Workshop 1   
122     Nov 29, 2023 No -10 build progress, but the barn progress continues Workshop 0   
121     Oct 14, 2023 Laser Cut Parts Inventory and Inspection Wings 2 1   
120     Oct 14, 2023 Well, we finally decided to build the barn Workshop 1   
119     Sep 17, 2023 Deburring of tailcone continues Empennage 1.5 0   
118     Sep 16, 2023 Deburring Tailcone Empennage 2.7 0   
117     Sep 09, 2023 Tailcone disassembled Empennage 1.5 0   
116     Sep 08, 2023 Tailcone finalization before disassembly Empennage 0.5 0   
115     Sep 04, 2023 Tailcone - nearing the finish of assembly round 1 Empennage 1.5 3   
114     Aug 28, 2023 Update later - refer to notes in build instructions Empennage .7 0   
113     Aug 26, 2023 Drilled tail cone top skins and machined HS stiffeners Empennage 2.5 1   
112     Aug 23, 2023 2nd tailcone top skin attached Empennage 1 0   
111     Aug 21, 2023 Skin deburring and first top skin of tailcone attach Empennage 3.2 2   
110     Aug 05, 2023 Final drilled rest of tailcone Empennage 1 0   
109     Jul 31, 2023 Final drilled left side skin Empennage .7 0   
108     Jul 30, 2023 Drilling Right Longeron and Starting Final Drilling of the tailcone side and bottom skins Empennage 1.5 3   
107     Jul 29, 2023 Drilling Left Longeron Empennage 2 1   
106     Jul 27, 2023 Tailcone parts machining and assembly Empennage 2.5 3   
105     Jul 26, 2023 Assembled more of the tailcone, work on parts Empennage 1 0   
104     Jul 23, 2023 Finished riveting one side of the VS Empennage 3 7   
103     Jul 17, 2023 Attach the rudder stabilizer and did some Vertical Stabilizer rivets on the leading edge Empennage 2.5 3   
102     Jul 16, 2023 Tailcone left skin attach and J-channel drilling Empennage 3 3   
101     Jul 10, 2023 Tailcone flip and rear bulkheads attach Empennage 1 2   
100     Jul 08, 2023 Tailcone Right side skin attach and stiffener drilling Empennage 1 0   
99     Jul 04, 2023 Tailcone bottom - initial assembly Empennage 2.3 1   
98     Jun 13, 2023 J-channel marking and prep for initial tailcone assembly Empennage 4 3   
97     Jun 12, 2023 Finished cutting J-channels Empennage 2 0   
96     Jun 11, 2023 Fun with J-channels Empennage 2 0   
95     Jun 04, 2023 Tailcone bulkhead deburring and match drilling Empennage 3 1   
94     May 10, 2023 Tailcone Work (pgs 10-3 and 10-4) Empennage 1.5 1   
93     May 01, 2023 Tailcone initial assembly Empennage 1 4   
92     Apr 30, 2023 Tapped the Tie Down Bracket Empennage 0.2 0   
91     Apr 29, 2023 Elevator Deburring complete - On to tailcone fabrication Empennage 3.5 0   
90     Apr 25, 2023 More Elevator Skin Deburring Empennage 1 0   
89     Apr 24, 2023 Elevator Deburring Continued Empennage 1 1   
88     Apr 23, 2023 Elevator deburring continues Empennage 2.5 0   
87     Apr 17, 2023 Deburring of Elevator Parts Empennage 0.9 0   
86     Apr 16, 2023 Elevator assembly and disassembly Empennage 5 3   
85     Apr 11, 2023 Right Elevator Top Skin Drilling Empennage 0.3 1   
84     Apr 10, 2023 Cleveland Order Tools 1   
83     Apr 10, 2023 Invoice from Vans for replacement part Empennage 1   
82     Apr 08, 2023 Right elevator top skin attach and trailing edge cut Empennage 1.4 0   
81     Apr 06, 2023 Quick drilling on the Elevator, assembly and looking for parts Empennage 1 0   
80     Apr 04, 2023 Elevator Deburring and Assembly Empennage 0.3 0   
79     Apr 03, 2023 Elevator Assembly Empennage .7 1   
78     Apr 02, 2023 Elevators - Some drilling and assembly Empennage 0.5 0   
77     Mar 21, 2023 Quick work on the elevators Empennage 0.3 0   
76     Mar 18, 2023 Done with HS for now, moving on to Elevators Empennage 2 2   
75     Mar 11, 2023 HS Nose Ribs Riveting Complete Empennage 1.2 2   
74     Mar 07, 2023 HS Riveting Continues Empennage 1 1   
73     Mar 06, 2023 Quick rivets Empennage 0.2 1   
72     Mar 05, 2023 Dimpling and (Finally) some rivets in the HS (namely, nose ribs and skin) Empennage 4.5 3   
71     Mar 04, 2023 HS Skin Dimples Empennage 1 1   
70     Feb 26, 2023 Dimpling of the Horizontal Stabilizer Empennage 3.5 3   
69     Feb 25, 2023 Machine Countersinks…598 of them Empennage 2.5 3   
68     Feb 19, 2023 Horizontal Spar Assembly Construction Empennage 2.5 4   
67     Jan 15, 2023 Finally, some rivets! Empennage 3 6   
66     Oct 09, 2022 Priming...at long last Empennage 4 1   
65     Aug 30, 2022 Work on the E-903/904 assembly (elevators) Empennage 1.5 2   
64     Jul 23, 2022 Building E-903 and E-903 and E-913 Empennage 1.5 0   
63     Jul 13, 2022 Elevator Rib Drilling Empennage 1 1   
62     May 25, 2022 Finished organizing Wing Kit Workshop 2 1   
61     Apr 30, 2022 Elevators Empennage 2 0   
60     Apr 30, 2022 Aggregate Inventory of Wing Parts Wings 12 2   
59     Apr 02, 2022 The Wings have arrived Wings 4 3   
58     Mar 21, 2022 Wing Crating Cost Wings 0   
57     Feb 21, 2022 Finished drilling HS skins Empennage 1.6 0   
56     Feb 19, 2022 Drilling Part 1 - Horizontal Stabilizer Empennage .7 0   
55     Feb 15, 2022 Wings full amount Wings 0   
54     Feb 15, 2022 Finished Cleco'ing the Horizontal Stabilizer Empennage .5 2   
53     Feb 13, 2022 Uh-oh Cleaveland Order Tools 0   
52     Feb 13, 2022 Horizontal Stabilizer, things are looking like airplane parts Empennage 3.5 4   
51     Feb 12, 2022 Putting the HS Ribs and Spars together Empennage 3.5 4   
50     Jan 24, 2022 Simple bit of edge deburring Empennage 1.5 0   
49     Jan 23, 2022 Nose Spar Debur finish up and some HS cradles Empennage 3 4   
48     Jan 22, 2022 Deburring and shaping HS-1004 Inspar Ribs Empennage 1.5 0   
47     Jan 11, 2022 Long time no post - HS spar work (so much deburring) Tools 3.5 3   
46     Dec 25, 2021 MCS on the HS Spar Empennage .5 0   
45     Dec 24, 2021 Lots and Lots of Drilling and Cleco-ing Empennage 1.5 0   
44     Nov 14, 2021 Final Drilling and deburring of HS-1008L/R Empennage 1 0   
43     Nov 13, 2021 Working on HS-1008L/R Empennage 3 3   
42     Aug 30, 2021 M12 Rivet Puller and Assorted Cleaveland Order Tools 0   
41     Aug 29, 2021 Assemble VS, Dimple Rudder Skins, rivet rudder stiffeners Empennage 3 6   
40     Aug 28, 2021 Dimple VS skins and rudder skins Empennage 1 0   
39     Aug 28, 2021 DRDT-2 Table Build Workshop 5 3   
38     Aug 27, 2021 Rudder Dimpling, Trailing Edge Countersink Empennage 1.7 2   
37     Aug 26, 2021 Rudder Work, Dimpling and Rivets - 7-7 #2-4 Empennage 1.2 3   
36     Aug 25, 2021 VS Spar Riveting and Rudder work [6-5 #1, #12, #13; 7-7 #1 Empennage 1.8 1   
35     Aug 24, 2021 Finished up rivets on the rear VS spar Empennage 1 2   
34     Aug 23, 2021 VS Rear Spar Riveting (6-4, #6) Empennage 1 3   
33     Aug 22, 2021 Dimpling and Rivets on the Vertical Stab spars Empennage 1.6 5   
32     Aug 21, 2021 First Rivets on the Vertical Stab! Empennage .7 1   
31     Aug 15, 2021 Prep and First run of Primer for the Vertical Stab and Rudder Parts Priming 8 6   
30     Aug 10, 2021 Finished up Step 8 and 10 on 7-6 Empennage 1.4 3   
29     Aug 09, 2021 Finished Rudder Match Drilling Empennage 1.6 3   
28     Jul 17, 2021 7-6 Leading Edge Match Drill Empennage .7 0   
27     Jun 27, 2021 Rudder work - 7-6 Assembly Empennage 4 1   
26     Jun 26, 2021 Rudder work - spar assembly 7-4 and 7-5 Empennage 3.5 1   
25     Jun 14, 2021 Wing Kit Ordered Wings 0   
24     Jun 13, 2021 Vertical Stab Parts all ready for priming Empennage 2 1   
23     Jun 12, 2021 Work on getting VS parts ready up to priming steps Empennage 2 1   
22     Jun 05, 2021 Bit of Counter Sinking on the VS Empennage .7 0   
21     May 28, 2021 Inventory of some Back-Ordered parts and a bunch of deburring Empennage 3 1   
20     May 20, 2021 Cut Stiffeners and some deburring Empennage 1 3   
19     May 19, 2021 Prepped Rudder Parts Empennage 3 1   
18     May 11, 2021 VS rib debur Empennage .5 0   
17     May 08, 2021 Finished VS Skin final drill and started debur Empennage 1 0   
16     May 02, 2021 Vertical Stabilizer - First Skin Attach Empennage 2.5 2   
15     May 01, 2021 Part Prep for VS Skeleton Empennage 3.5 1   
14     Apr 30, 2021 Deburring of VS-1003, VS-1014L/R, and VS-1008 Empennage 1 0   
13     Apr 28, 2021 Vertical Stab - Work Begins Empennage 4 0   
12     Apr 23, 2021 More Tool Acquisition Tools 1   
11     Apr 23, 2021 Light Box and OP-51 completed Practice Kit 1   
10     Apr 17, 2021 Inventory Completed Empennage 3 2   
9     Apr 16, 2021 More inventory Empennage 1 0   
8     Apr 13, 2021 Empennage Arrives and Initial Unpacking Empennage 2 3   
7     Apr 09, 2021 Workshop Starting Point Workshop 3   
6     Apr 09, 2021 Completed Toolkit Practice Kit 1   
5     Mar 06, 2021 Inventory and Organize Practice Kits Practice Kit 0   
4     Mar 05, 2021 Cell Phone Kit Practice Kit 1   
3     Feb 22, 2021 Toolkit Organization Tools 1   
2     Feb 22, 2021 Ordered Toolkit Tools 0 0   
1     Feb 22, 2021 Ordered Empennage Kit Empennage 0 0   
------------ -------------
Totals212.8    169   