Project: Geek     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
174     Apr 07, 2024 Inspected Inspection 2 $0.00    0   
173     Mar 23, 2024 Registration and AWC Submission Inspection 1 $0.00    1   
172     Feb 21, 2024 Hangar!! Workshop 1 $0.00    4   
171     Jan 17, 2024 Yaw Dampener Avionics 3 $0.00    4   
170     Jan 01, 2024 Just Waiting Research .1 $0.00    0   
169     Nov 28, 2023 Cracked Door Glass Repair Fuselage 7 $0.00    4   
168     Nov 19, 2023 Door Window Repair Fuselage 4 $0.00    1   
167     Nov 06, 2023 Door Latches Fuselage 2 $0.00    1   
166     Nov 05, 2023 Window Crack Fuselage 0.1 $0.00    1   
165     Oct 30, 2023 Interior Interior Finish 6 $0.00    5   
164     Oct 17, 2023 Camera and cowling fasteners Fuselage 4 $0.00    5   
163     Oct 09, 2023 Quarter Windows Fuselage 4 $0.00    2   
162     Sep 26, 2023 Strakes, Interior and wing tips Fuselage 4 $0.00    4   
161     Sep 21, 2023 Looks Like a Plane Fuselage 10 $0.00    4   
160     Sep 12, 2023 Doors, Nameplate and Alternator Fuselage 15 $0.00    6   
159     Aug 25, 2023 Door Hinges and VGs Fuselage 3 $0.00    4   
158     Aug 23, 2023 Baggage Area, Wing Close Out and Cowling Heat Liner Fuselage 12 $0.00    5   
157     Jul 29, 2023 Garmin G3X, Compass Rose and Stuff Avionics 7 $0.00    2   
156     Jul 24, 2023 Dynavibe Bracket Propeller 6 $0.00    5   
155     Jul 18, 2023 Prop, Sills, Controls and Engine Start Engine 9 $0.00    5   
154     Jul 08, 2023 Wind Screen, Glare Shield, Taxi Lights Fuselage 14 $0.00    6   
153     Jul 01, 2023 Turtle Deck, Trim Panels, and Glare Shield Fuselage 15 $0.00    7   
152     Jun 27, 2023 Flaperons, Turtle Deck and Feed Through Wings 12 $0.00    5   
151     Jun 22, 2023 Tail Feathers Empennage 11 $0.00    5   
150     Jun 19, 2023 Wing Tips and Flaperon with Taxi Lights Wings 11 $0.00    9   
149     Jun 11, 2023 Turtle Deck Fuselage 9 $0.00    4   
148     Jun 08, 2023 Lower Cowl and Waiting for Paint to Dry Fuselage 7 $0.00    4   
147     Jun 05, 2023 Painting Cowlings and wing tips Fuselage 7 $0.00    2   
146     May 24, 2023 Windscreen Fuselage 10 $0.00    3   
145     May 13, 2023 Springs, Intake and Flaperons Engine 12 $0.00    3   
144     May 08, 2023 Intake Mod, Fuel Gauge and Wing Struts Engine 9 $0.00    3   
143     Apr 30, 2023 Intake Engine 5 $0.00    4   
142     Apr 26, 2023 Brake Bleeding Landing Gear 3 $0.00    4   
141     Apr 19, 2023 Cowling, Exhaust and Thermostat Fuselage 9 $0.00    4   
140     Apr 10, 2023 Cowling, Naca Duct and Seat Brace Fuselage 7 $0.00    4   
139     Apr 03, 2023 Cowling, Wing and Wiring Fuselage 18 $0.00    8   
138     Mar 26, 2023 Naca Duct, Radiator and Wing Wire Fuselage 9 $0.00    7   
137     Mar 22, 2023 Cowling, Radiator and Naca Duct Fuselage 22 $0.00    10   
136     Mar 12, 2023 Cowling, Pitot System and a little Avionics Fuselage 15 $0.00    4   
135     Mar 03, 2023 No Smoke and Troubleshooting Avionics 35 $0.00    5   
134     Feb 14, 2023 ECU and Grounds Engine 12 $0.00    7   
133     Feb 01, 2023 Engine Mount and Stuff Engine 10 $0.00    5   
132     Jan 27, 2023 Brake Lines Fuselage 4 $0.00    2   
131     Jan 25, 2023 NACA Vent and Console Fuselage 10 $0.00    5   
130     Jan 20, 2023 Boot Cowl and Firewall Fuselage 8 $0.00    4   
129     Jan 15, 2023 Wiring Avionics 35 $0.00    3   
128     Dec 31, 2022 Wiring Avionics 18 $0.00    4   
127     Dec 19, 2022 Panel and stuff Avionics 14 $0.00    7   
126     Dec 08, 2022 Wiring, Wheels and Panel Fuselage 14 $0.00    4   
125     Nov 28, 2022 Sticks, Capacitor, Heater and Tail Light Controls 22 $0.00    6   
124     Nov 18, 2022 Rudder Install GPS Antenna and Tail Light Tail Feathers 8 $0.00    4   
123     Nov 13, 2022 Landing Gear, Firewall, Heater, Headset Panel Firewall 18 $0.00    7   
122     Nov 02, 2022 Baggage, Main Gear and Vertical Fuselage 9 $0.00    3   
121     Oct 28, 2022 Covering Fuselage 5 $0.00    2   
120     Oct 17, 2022 Panel and ELT Fuselage 14 $0.00    5   
119     Oct 08, 2022 Brakes and Instrument Panel Fuselage 8 $0.00    2   
118     Oct 03, 2022 Static Ports, Fuel and Brake Lines, Tail Wheel Fuselage 16 $0.00    8   
117     Sep 24, 2022 Vertical Stab and Rudder Fuselage 14 $0.00    5   
116     Sep 17, 2022 Vert Stab and Misc Fuselage 11 $0.00    6   
115     Sep 13, 2022 More Covering Fuselage 16 $0.00    7   
114     Sep 04, 2022 Left Side, Horiz Stab and Strut Cover Fuselage 17 $0.00    3   
113     Aug 28, 2022 More Skin Fuselage 18 $0.00    7   
112     Aug 20, 2022 Taillight Wiring, Landing Gear Fairings and Fuel Sights Tail Feathers 14 $0.00    9   
111     Aug 16, 2022 Elevator and Gear Fairings Tail Feathers 10 $0.00    6   
110     Aug 12, 2022 Bottom skin and Elevatoor Fuselage 14 $0.00    6   
109     Aug 06, 2022 Bottom Skin and Stuff Fuselage 7 $0.00    5   
108     Jul 31, 2022 Left Wing and Trim Boose Controls 9 $0.00    5   
107     Jul 15, 2022 Port Wing Plumbing Wings 10 $0.00    9   
106     Jul 09, 2022 Finished Stbd Wing Cover and Started Port Wiring Wings 12 $0.00    6   
105     Jul 07, 2022 Covering Wings 12 $0.00    6   
104     Jun 30, 2022 Wing n Stuff Wings 9 $0.00    6   
103     Jun 20, 2022 Paint, ELT and Skin Wings 6 $0.00    5   
102     Jun 09, 2022 Horizontal Stab and Transponder Empennage 7 $0.00    8   
101     Jun 08, 2022 Inspection Panels Fuselage 15 $0.00    6   
100     Jun 01, 2022 Elevator Rig Controls 7 $0.00    7   
99     May 30, 2022 Clean Up and Fix Stuff Fuselage 4 $0.00    4   
98     May 28, 2022 Fuel Quantity Site Gauge and Wire Trough Fuel System 7 $0.00    4   
97     May 03, 2022 GTX-45R Mount Avionics 6 $0.00    4   
96     May 03, 2022 Trim and Elev Rig Fuselage 3 $0.00    4   
95     Apr 20, 2022 Trim Tab, Panel and Engine Fuselage 2 $0.00    3   
94     Apr 14, 2022 Header Tank Install Fuselage 3 $0.00    3   
93     Apr 10, 2022 Various Stuff and Header Tank Fuselage 5 $0.00    7   
92     Apr 10, 2022 Various Fuselage $0.00    0   
91     Mar 29, 2022 Two Point Door Latchs Fuselage 15 $0.00    6   
90     Mar 21, 2022 GPS Antenna Mount Avionics 8 $0.00    6   
89     Mar 14, 2022 Headset Wiring Avionics 4 $0.00    3   
88     Mar 05, 2022 Comms and Roll Servo Avionics 10 $0.00    8   
87     Mar 01, 2022 Mounts and Wiring Avionics 6 $0.00    6   
86     Feb 27, 2022 Avionic Mounts and Installation Avionics 10 $0.00    7   
85     Feb 16, 2022 IFF Location Avionics 3 $0.00    2   
84     Feb 12, 2022 Trim Servo Install, Rear Mounting Plate and Access Avionics 9 $0.00    10   
83     Feb 06, 2022 Auto Pilot Servos Avionics 5 $0.00    8   
82     Feb 03, 2022 Wiring and Baggage Bag Fuselage 5 $0.00    6   
81     Feb 01, 2022 Horizontal Stab Close Out and Console Empennage 9 $0.00    6   
80     Jan 24, 2022 Door and Closeout Fuselage 6 $0.00    9   
79     Jan 21, 2022 Doors Fuselage 15 $0.00    9   
78     Jan 17, 2022 Door Frame, Window and Center Console Fuselage 5 $0.00    3   
77     Jan 15, 2022 Stringers Fuselage 3 $0.00    4   
76     Jan 12, 2022 VHF Antenna, Door frames and Wiring Fuselage 9 $0.00    6   
75     Jan 05, 2022 Left Window, Baggage Floor and VHF Antenna Fuselage 5 $0.00    9   
74     Jan 03, 2022 Seat Pan and Window Fuselage 3 $0.00    5   
73     Jan 01, 2022 Small Stuff Fuselage 7 $0.00    5   
72     Dec 29, 2021 Seat, Stringer, Door Jamb and Windows Fuselage 13 $0.00    11   
71     Dec 20, 2021 Center Console and Rudder Cables Controls 14 $0.00    8   
70     Dec 13, 2021 Rudder Pedals Controls 11 $0.00    6   
69     Dec 10, 2021 Floorboards and Rudder Pedals Fuselage 16 $0.00    12   
68     Dec 04, 2021 Center Console and Flap Lever Fuselage 12 $0.00    7   
67     Nov 30, 2021 Controls, Flap Detent and Floor Boards Controls 10 $0.00    9   
66     Nov 22, 2021 Controls and Things Controls 18 $0.00    5   
65     Nov 11, 2021 Control Shaft Bearing Controls 3 $0.00    4   
64     Nov 10, 2021 Rudder Fairing and Top Caps Empennage 14 $0.00    6   
63     Oct 28, 2021 Vertical Stab Ribs and Fairing Empennage 7 $0.00    6   
62     Oct 21, 2021 Vertical Stab and Rudder Ribs Empennage 8 $0.00    6   
61     Oct 17, 2021 Horiz Stab and Trim Motor Empennage 6 $0.00    4   
60     Oct 15, 2021 Horiz Stab and Rudder Empennage 8 $0.00    6   
59     Oct 10, 2021 Horizontal stab and Elevator Empennage 20 $0.00    9   
58     Oct 04, 2021 More Horiz Stab Work Empennage 12 $0.00    11   
57     Sep 29, 2021 Horizontal Stab and Elevator Empennage 10 $0.00    4   
56     Sep 27, 2021 Storage and Tail Wings 4 $0.00    4   
55     Sep 23, 2021 Primer Done and Reaming Wings 6 $0.00    5   
54     Sep 20, 2021 Tips and Flaperons Wings 8 $0.00    4   
53     Sep 03, 2021 Electrical Cables Wings 12 $0.00    3   
52     Aug 21, 2021 Wing Tips Wings 2 $0.00    4   
51     Aug 18, 2021 Flaperons Mounted Wings 4 $0.00    4   
50     Aug 15, 2021 More Flaperons Wings 5 $0.00    5   
49     Aug 14, 2021 Left Flaperon Wings 6 $0.00    1   
48     Aug 12, 2021 Right Counterbalance Wings 5 $0.00    6   
47     Aug 11, 2021 Flaperons Wings 6 $0.00    6   
46     Aug 03, 2021 Pitot System Wings 7 $0.00    9   
45     Jul 29, 2021 Wing Tip Attachment Strips Wings 6 $0.00    5   
44     Jul 24, 2021 Wing Tip Install Wings 9 $0.00    6   
43     Jul 06, 2021 More Landing Lights and wing tips Wings 8 $0.00    5   
42     Jul 01, 2021 Landing Light Fairing and Leading Edge Wings 4 $0.00    6   
41     Jun 21, 2021 Little More Landing Light Wings 3 $0.00    7   
40     Jun 21, 2021 Landing Light Fairing Wings 3 $0.00    5   
39     Jun 18, 2021 Wing Tips and Leading Edge Wings 12 $0.00    12   
38     Jun 09, 2021 Wing Sweep Testing,Pitot Tube Fit Check and More Wings 6 $0.00    10   
37     Jun 06, 2021 More Wing Work Wings 6 $0.00    3   
36     Jun 03, 2021 Rib 2 Wings 9 $0.00    9   
35     May 28, 2021 Fuel Tanks and Butt Rib Close Outs Wings 8 $0.00    11   
34     May 20, 2021 Rudder Pedal Blocks Controls 3 $0.00    3   
33     May 17, 2021 Fuel Tanks Wings 5 $0.00    7   
32     May 14, 2021 Spars primed inside Wings 2 $0.00    7   
31     May 11, 2021 FWD Brace Paint Fuselage 2 $0.00    2   
30     Apr 30, 2021 Tank Sloshing Wings 6 $0.00    7   
29     Apr 24, 2021 Magnetometer Mount Wings $0.00    9   
28     Apr 21, 2021 Catching Up Wings 4 $0.00    9   
27     Apr 19, 2021 More Pitot Tube and OAT Wings 2 $0.00    5   
26     Apr 18, 2021 Pitot Tube Mount Wings 6 $0.00    7   
25     Apr 17, 2021 Jury Struts Wings 6 $0.00    6   
24     Apr 14, 2021 Right Butt Rib Fitting Wings 4 $0.00    6   
23     Apr 12, 2021 Left Wing Butt Rib Wings 5 $0.00    3   
22     Apr 10, 2021 Right Wing Wings 2 $0.00    2   
21     Apr 08, 2021 Finished Right Wing Rib 1 stack and finalized small parts Wings 3 $0.00    6   
20     Apr 07, 2021 Right Wing Rib 1, flaperon doublers and Last left wing doubler Wings 4 $0.00    3   
19     Apr 05, 2021 Rib 1 Right Wing Wings 4 $0.00    6   
18     Apr 03, 2021 Left Wing Rib 1 Stack Wings 2 $0.00    6   
17     Apr 02, 2021 Short Day - Left Rib 1 stack Wings 2 $0.00    2   
16     Apr 01, 2021 Left Wing Progress Wings 3.5 $0.00    4   
15     Mar 31, 2021 Fuselage Jig Tools 6 $0.00    2   
14     Mar 29, 2021 Finished Varnishing wing and installed flaperon doubler Wings 3 $0.00    1   
13     Mar 28, 2021 As Promised Wings 2.5 $0.00    2   
12     Mar 27, 2021 Another Exciting Day of Varnish Wings 3 $0.00    3   
11     Mar 19, 2021 Varnish Rib 1 stack Wings 2.5 $0.00    2   
10     Mar 18, 2021 More Wing work Wings 7 $0.00    11   
9     Mar 17, 2021 Right Wing Strut Mounts and Rib 1 Flaperon Bracket Wings 6 $0.00    3   
8     Mar 16, 2021 It's a Dirty Job But Someone Has To Do It Wings 6 $0.00    7   
7     Mar 15, 2021 More Doublers Wings $0.00    1   
6     Mar 14, 2021 Installed Wing Mounts and prep'd Left Rib 1 Wings 6 $0.00    1   
5     Mar 13, 2021 Drill Cleco Repeat Wings 6 $0.00    6   
4     Mar 12, 2021 Bracket drilled and ready Wings 2.5 $0.00    1   
3     Mar 12, 2021 Fitting wing strut mounts - left wing Wings 2 $0.00    4   
2     Mar 11, 2021 Sanding Wings and Rolling Fuselage Research 6.5 $0.00    2   
1     Mar 09, 2021 Ubiquitous Inventory Research 7 $0.00    3   
------------ -------------- -------------
Totals1392.7    $0.00    894   





NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.