285     Apr 07, 2024 Moving right along Wings 50 $0.00    17   
Lots has been going on. Aileron cables are in, flaps springs installed with the gasket. Pitot tube mast is installed, pitot and AOA plumbing are done. Inspection cover back plates are installed with all the nut plates for the covers to attach. Gas tank cover has all the holes upsized for #6 screws. Curtis drain hole has been cut. Trailing edges of the flaps and ailerons are all lined up and riveted
 
284     Feb 21, 2024 Wingtip trailing edge closeout Wings 2 $0.00    2   
Photo failure as I forgot to take a photo of the wood, but I used wood to create a wingtip trailing edge closeout and did not take a photo of the wood. The wood was shaped to the extended rib and out to the trailing edge of the aileron. I used Hysol epoxy to put it in place then clamped it as you can see in the photo

The trailing edge of the wingtip will be the inside edge of the green tape. The wood is in the space between the two green tapes.
 
283     Feb 20, 2024 Wingtip pin hole filling and sanding Wings 6 $0.00    0   
After applying too much filler, I sanded for well over 5 hours. I still need to prime as this really allows you to see the remaining pin holes and they will be filled with 3M bondo.
 
282     Feb 08, 2024 Wing Tip Light Base Lighting 2 $0.00    1   
I used carbon fiber to create a base for the light
 
281     Feb 08, 2024 Right wing tip fitted Wings 4 $0.00    4   
Right wing tip is drilled and cleco'd as well as the wing tip light base mount is glued in place with some kind of fancy Kitfox epoxy
 
280     Feb 06, 2024 Fuel Tank fittings Wings 2 $0.00    2   
Three of the four (one is backordered) were installed and lines were drawn to drill holes in ribs for fuel lines
 
279     Feb 06, 2024 Main Skin Riveted Wings 4.5 $0.00    2   
Today the main wing skin on the right wing was riveted except for the last (trailing edge) row as the stiffener need to go in there and it will likely be painted first.

At some point between the age of 5 and 61 peeling plastic off of metal ceased to be fun
 
278     Feb 04, 2024 Right Wing Photo Dump Wings 100 $0.00    37   
I have been super busying doing the right wing and not posting, so here is a big dump. Lots of time was spent figuring things out and going down rabbit holes, the left wing will be a lot quicker and I will do a detailed daily step by step. Lots of time spent on the leading edge light and the conduit for the wiring.

Several BH builders expressed concern about the leading edge light as far as compromising the integrity of the D-spar. I used a backing plate (with the anchor nuts, .020 lens, and a .025 lens cap, so there are 4 layers including the wing skin. This bay, 2nd to last, is significantly stiffer than any other bay in the entire wing.

Wingtip attach/drilling locations have been marked, but can't do that until after the skin is riveted.
 
277     Nov 03, 2023 PAINT! Boot Cowl 5.5 $0.00    6   
Well, today was a visual day.

It was a serious milestone! I filled and sanded the nosebowl about 30 times, all be it at the end with 400 and 600 grit sandpaper. How long does a cycle of filling and sanding take? About 4 hours each time. It was like chasing a GHOST! But today it was all worth it

Tomorrow the engine cowl gets riveted to the nose bowl and will all be painted.

Happy Days


 
276     Nov 02, 2023 Paint Prep Boot Cowl 6.5 $0.00    0   
Not much visual to show, just sanding and priming getting ready to paint
 
275     Oct 31, 2023 General pre-paint prep Boot Cowl 6 $0.00    0   
I just upsized holes in the boot cowl for #6 screws, installed a bunch of nut plates, did a bit of riveting on doublers
 
274     Oct 30, 2023 Nose bowl is all primed Engine Cowl 1.5 $0.00    0   
Took a ton of time, but the nose bowl is finally ready for phase 1
 
273     Oct 30, 2023 Fixed a faulty Carb Heat sensor reading Avionics 2 $0.00    0   
I had a bad splice that was resulting in no carb heat reading, redid the splice and checked it with the ohm meter this time
 
272     Oct 30, 2023 Boot cowl removal for painting Boot Cowl 3 $0.00    1   
Hey, someone too my plane apart

Kidding aside, I am preparing for painting the boot cowl. Both the boot cowl and the firewall are dimpled for flush rivets. Now it is prep for painting time.

I took the opportunity to finally trouble shoot my faulty Carb Heat sensor issue, I had a bad splice leading to the D-Sub, so redid that, this time I checked it on the ohm meter to make sure all was good.
 
271     Oct 29, 2023 Fill, sand, prime and repeat Engine Cowl 5 $0.00    3   
It was like Groundhog Day only in hours. I am on my 7th time. Looks like bottom cowl is now at an acceptable level to get it through Phase 1, which after Phase 1 I will paint the engine cowl.
 
270     Oct 29, 2023 Upsized holes for #6, #8 screws and #4 Rivets Engine Cowl 4 $0.00    4   
Final upsizing to finished the engine cowl connections
 
269     Oct 28, 2023 More nose Bowl sanding Engine Cowl 5 $0.00    3   
I was sanding with 400 grit sandpaper prepping for primer and held the nose bowl up to the light and saw more pinholes…. So it was back to filling and sanding again. After sanding all the filler off I found one more area, filled and sanded that then primed. The primed nose bowl will need a bit of sanding then a final coat of priming
 
268     Oct 27, 2023 Installation of Sky Bolt fasteners Engine Cowl 2 $0.00    6   
Installed in the 2 “U”Channels and the nose bowl
 
267     Oct 26, 2023 Baffle Seal Baffling 6 $0.00    5   
It has been a slow process of getting everything cut and lined up, but making progress slowly
 
266     Sep 03, 2023 Drilled the TW Spring for mounting Empennage 1 $0.00    3   
Upsized the hole in the tailwheel spring to a 5/16th's first with the drill press, then using a reamer. It is installed using a close tolerance bolt AN175-15. It is now a super tight fit.

Oh yeah, this is a great way to ruin a brand new drill bit
 
265     Sep 03, 2023 95% done with pre-engine start cooling Baffling 5 $0.00    7   
95+% of my baffling/engine cooling prior to engine start are completed, it was a multi month process. �e last part was slicing the rear silicone so slide into the U-supports for a night airtight fit.
 
264     Sep 01, 2023 Silicone sheets installed Baffling 6 $0.00    6   
Installed nearly the last of the silicon sheets for the cooling, I have the under the front ramp to do, but that is super ease. I actually doubled up the “thin” black stuff that cam with the Vans kit so it would be stiffer. I just did not want the red/orange visible below the front ramps

Tomorrow starts the trimming
 
263     Aug 31, 2023 Co-Pilot Scat Tube protection Cabin Air 2.5 $0.00    2   
Wrapped the muffler to cabin with anti-chaff tape in case there is any rubbing. Wrapped the front to muffler section with Kevlar heat shield to protect the scat tube from exhaust tubes and did a double standoff to ensure there is no contact. Did a triple safety wire on the Kevlar shield which also has adhesive on the back side
 
262     Aug 31, 2023 Rear seal installation Baffling 4 $0.00    1   
Of course there was more more on the engine cooling
 
261     Aug 30, 2023 Clamped wires Engine .5 $0.00    2   

​​​​​​​Put an adel clamp on the lower spark plug lines and CHT and EGT probe wires
 
260     Aug 30, 2023 Silicone to baffling Baffling 5 $0.00    3   
Still working on cooling, installed the silicone on the baffling on both sides and applied RTV to seal it up.
 
259     Aug 28, 2023 Final baffle day, except for the silicone Baffling 8 $0.00    7   
Primed all my baffling parts, painted the parts that are visible through the air intake.

Installed the front ramps and back sections, support braces are permanently in place. I also riveted the oil cooler plenum to the back baffle and RTV'ed it
 
258     Aug 27, 2023 Air Ducts plumbed Baffling 6.5 $0.00    3   
Cabin heat and carb heat are plumbed. Lots more work on the baffling with support pieces to stabilize everything.
 
257     Aug 26, 2023 Left Front Ramp Baffling 2.5 $0.00    1   
Riveted together, primed and painted
 
256     Aug 25, 2023 Cabin heat, oil cooler, plug lines run Baffling 6 $0.00    8   
Drilled the holes for the spark plug gaskets

Drilled and cut hole for the oil cooler plenum that attaches to the back of the baffling

Finished the holes, scat tubing and tube fitting for the co-pilot cabin heat
 
255     Aug 23, 2023 Trimmed sides and bracketed front intake area Baffling 8 $0.00    6   
Lots of progress on the baffling today. �got all the side pieces fitted, the front intake area is now fitted and the brackets have been drilled and cleco'd

Long Slow process, 8 hours in it today 
 
254     Aug 22, 2023 Front Ramp baffling area Baffling 4.5 $0.00    4   
Another day or measuring 20 times, then a few more times, then cutting, drilling, match drilling and cleco'ing parts together.

Baffling is a slow process, but cooling is important
 
253     Aug 11, 2023 Baffling Baffling 6 $0.00    5   
I have been chipping away at the baffling, it has been slow going and at times mentally defeating. made some good progress today and got everything match drilled
 
252     Aug 05, 2023 Baffling Engine 4 $0.00    10   
It was a day of measuring 3 times and cutting once… Of course I was sneaking up on the final shape, so there was sometimes 2, but more often 3-4 cuts required to reach the final shape/height.
 
251     Aug 05, 2023 Brakes Landing Gear .5 $0.00    2   
After monitoring the tire pressure for three days, I decided to reattach the brake pads. NOT my favorite activity! All safety wired and ready to go. One of the new tubes for the GY 26's had a valve leak and I replaced the valve 3 days ago
 
250     Aug 05, 2023 Control Cables Engine 1.5 $0.00    1   
Yesterday I cut the firewall pass through for the Carb Heat cable, today I reattached the Throttle and Mixture, I measured and cut the Carb Heat cable, attached it. The carb heat cable needed a stand off on the bracket for the adel clamp.
 
249     Aug 05, 2023 Control Engine $0.00    0   
 
248     Aug 04, 2023 Odds and Ends Engine 5 $0.00    3   
Re-attached a hose on cylinder #1

Grounded the engine block to the firewall negative stud

Started the Baffling process which is a bit baffling

Drilled the hole in the firewall for the carb heat control cable and set the cable in the pass through
 
247     Aug 03, 2023 Nose Bowl Sanding is finished Engine Cowl 6 $0.00    1   
I don't want to do that again!!! But it turned out great. Thousands of pinholes filled and sanded super smooth
 
246     Aug 02, 2023 More Nose Bowl sanding Engine Cowl 9 $0.00    0   
Perfection is the enemy of completion

Sanded the nose bowl for 9 hours
 
245     Aug 01, 2023 Changed tires Landing Gear 2 $0.00    1   
I installed Goodyear 26's as they are a lot more durable than the 26” ABW's I had planned on using. The smaller GY's are super durable and have a smaller profile so should help with a few mph speed
 
244     Aug 01, 2023 Sanding Nose Bowl Engine Cowl 5.5 $0.00    1   
This is what 5 1/2 hours of sanding looks like after yesterday's application of the pinhole filler. The blue spots are superfill in a few areas that needed filling
 
243     Jul 31, 2023 Sanding the Nose Bowl Engine Cowl 6 $0.00    3   
Sanding and filling, rinse and repeat. Had to fill at least 4 times to get it to my satisfaction. Of course you sand in between each filling. Then I painted on pinhole filler as all fiberglass has pinholes. It was a long and dirty day
 
242     Jul 31, 2023 Air Box Fiberglass Engine Cowl 1.5 $0.00    1   
Layed up fiberglass from the front top of the airflow system. This had to be fiberglass as the engine cowl is rounded and the top of the airflow box.

 
241     Jun 26, 2023 Finished the Low Pressure lip and.. Engine Cowl 7 $0.00    3   
I finished the low pressure lip and it looks amazing. It is primed and cleco'd in. I also final sanded the air scoop lower frame and it is now ready for pin hole priming
 
240     Jun 25, 2023 Air Scoop Frame Engine Cowl 1.5 $0.00    0   
Final fit of the lower frame that fits on the bottom of the air scoop. There was a bit of trimming and sanding to get the top of the frame to fit up against the scoop
 
239     Jun 25, 2023 Low Pressure Lip 2 Engine Cowl 2 $0.00    3   
Final sanded and then applied paint on pin hole filler

I also drilled and cleco'ed in place for the final fitting prior to applying the pin hole filler
 
238     Jun 24, 2023 Prepped and primmed lower door skins Doors 2 $0.00    4   
Sanded edges, prepped skins and applied two coats of primer
 
237     Jun 24, 2023 Lower Air Scoop cover Engine Cowl 1 $0.00    0   
Looks like it is finally sanded to an acceptable smoothness
 
236     Jun 24, 2023 Lower Lip Continued Engine Cowl 3 $0.00    0   
Still sanding and filling to get the look just right. Slow process
 
235     Jun 23, 2023 Final Installed Wing Root Panels Interior Finish 4.5 $0.00    2   
After two coats of primer and two coats of flat black paint I installed the wing root panels. Headset jacks and sight gauges also installed in the panel
 
234     Jun 23, 2023 Drilled and cleco'ed NACA Ducts Boot Cowl 2 $0.00    2   
Fitted and drilled in the NACA ducts for cooling in the cockpit
 
233     Jun 23, 2023 Sanding low Pressure lip Engine Cowl 1.5 $0.00    4   
Used a belt sander to get the low pressure lip smoothed out. Then filled in the low spots with more SuperFill
 
232     Jun 22, 2023 Air scoop frame Engine Cowl 3 $0.00    3   
Lots of sanding after filling in depressions and imperfections with SuperFill. Of course then there were more to fill, so lots more sanding tomrrow
 
231     Jun 22, 2023 Low Pressure Lip Engine Cowl 2 $0.00    5   
Popped the low pressure lip out of the mold, measured and cut it to my desired sizing, then of course I added a BUNCH of SuperFill just because I love sanding. For the record, I hate sanding. But SuperFill and sanding will allow for the best/smoothest end result
 
230     Jun 21, 2023 Low Pressure Lip fabrication Engine Cowl 8 $0.00    11   
First I had to create a mold to put on the bottom of the cowl to allow for the glassing. The mold too 5 hours alone as it had many complex curves that joined in the two corners. Then the mold was mounted via packing tape to the cowl and then glassed with 5 layers of fiberglass
 
229     Jun 18, 2023 SkyBolt installation Engine Cowl 3 $0.00    5   
All holes drilled and cleaned up for both the receptacles and fasteners on the cowl doors
 
228     Jun 18, 2023 Sight Gauges Fuel System 2.5 $0.00    1   
Fabricated exactly from the Bearhawk manual

90 degree bulkhead an fitting, Univair float ball, 5052 tubing
 
227     Jun 15, 2023 Riveting the piano hinges to the top cowl Engine Cowl 3 $0.00    5   
Riveted the top cowl to the piano hinges and the cowl doors to the piano hinges. �wn the middle is a line of rivets that is a “U” channel stiffener for the top cowl.

I did screw up in a big way…. I had the top cowl all perfectly flush riveted to the piano hinges and then ding… ding… ding I realized I forgot to attach the “U” channel to the bottom of the piano hinge. � I had to drill out the rivets and redo the riveting. �uff happens
 
226     Jun 13, 2023 Air Scoop re-engineering Engine Cowl 2.5 $0.00    10   
I mentally engineered this while I was away working as I felt the fiberglass one I built was too heavy.
 
225     May 12, 2023 Trimmed and installed carb airscoop Engine Cowl 3.5 $0.00    3   
Lots of measuring and marking as I had to make sure this was cut properly. The factory made part comes too long and is trimmed to length based on your engine setup. Once cut to length, I drilled holes in the scoop then transfer drilled to the cowl and cleco'd in
 
224     May 12, 2023 Installed Balance Tubes in Ailerons Wings 1.5 $0.00    2   
Installed the balance tubes and riveted them in
 
223     May 11, 2023 Aileron Balance tubes Wings 5 $0.00    4   

Filled the aileron counterbalance tubes with #9 shot, I got them to within 0.2 oz of one another, I think that is good enough. �ne came out a bit heavy, I think using larger shot would make for a lighter weight. �pounds 6 ounces was my weight.

I also countersunk and primed the rivet holes where the tube attaches to the aileron
 
222     May 11, 2023 Bottom Cowl cut out for exhaust Engine Cowl 2 $0.00    3   
Cur out the relief for the exhaust and started on a template for the cowl lip
 
221     May 11, 2023 AirBox Engine Cowl 9 $0.00    10   
Been working on the Companion since I got home from work Monday. �Mainly working on the bottom cowl and the carb airbox with a few other goodies thrown in.

It was with much trepidation that I started cutting into the bottom cowl that took so long to get perfect, but it needed a big hole so it got a big hole. �viously it is a start small and enlarge as needed. �arted by tracing the carb for positioning, then took the cowl off set the airbox on it and then started tracing the outline once again starting a bit small allowing for cutting more to fit.

With the airbox on, I can now install the Carb Heat control cable, so I did that as well.
 
220     Apr 12, 2023 Finished the bottom cowl, and completed the cowl doors Engine Cowl 7 $0.00    11   
Today was a great day, very visual as I continued yesterday's engine cowl work

This is a cool trick a fellow builder showed me, use 2-3” tape using the “inner edge” where you want to final trim your cowl. The install the cowl use more tape and line up the outside edges of the tape and the inside edge will be EXACTLY where you want to trim to. Very simple and effective

Then just trim, in the photo it would be a case of trimming the right edge

So I finished the left bottom cowl today and drilled and cleco'd it to the U Channel

Next was the cowl doors. I held the doors up while lining up the front leading edge to the top cowl and marked the piano hinge on the door both front and back. The I removed the hinge from the top cowl and sandwiched the door between the side hinges and clamped it to the work table. The point of this is to have perfectly matched attach holes on the top and door. Using the top holes to drill through the door skin and other side of the piano hinge

Next was to figure out how to match drill the holes for the bottom cowl, U channel and the door skin. The 5 holes drilled will be where the SkyBolt fastener attaches the door to the U Channel and bottom cowl. I used a flush pull rivet on holes 1, 3 and 5, then strap/match drilled holes 2 and 4, then drilled out the 3 rivets and cleco'd in the door on holes 2 and 4 then match drilled hole 3, 5 and 1

The green tape is where I need to make minor trims to make it perfect, then I will sand the edges to take and sharp spot off and finally roll the edges

Repeat for the other side and boom you have doors

Full photo to show where things are to date
 
219     Apr 12, 2023 From sheet metal to bottom cowl Engine Cowl 8 $0.00    8   
It was a day of measuring, cutting, fitting, measuring, deep breaths, more cutting and fitting and then some drilling. Go slow, you can always take more off, but you can't add on
 
218     Apr 04, 2023 Finished the top cowl with the piano hinges installed Engine Cowl 6.5 $0.00    9   
Engine cowl is fitted and cleco'ed to both the nose bowl and the boot cowl/fuselage. Piano hinges are sandwiched between the “U” channel and skin.

I also got started on the bottom cowl, the top attach point (U Channel) installed and they are 0.5�o and 0.4�evel to the reference point which is the top of the door frame
 
217     Apr 03, 2023 Top Section cut and cleco'ed to the nose bowl Engine Cowl 5 $0.00    8   
There was a lot of measuring prior to cutting. Initially I cut it slightly oversized to get a better idea of the fit, then cut it down to the desired size

I drilled the holes in the front edge of the top then match drilled and cleco'ed into the nose bowl.
 
216     Apr 03, 2023 Redoing part of the boot cowl Boot Cowl 4 $0.00    6   
I really dislike redoing things, but a part of my boot cowl had been bothering me and being I am starting to work on the engine cowl I decided to redo the top front part of the boot cowl.
Yep, it was time to use some poster board to add a bit to the previous piece as rather than being overlapped by the side cowl, this new piece is going to overlap for a cleaner and smoother transition
 
215     Mar 31, 2023 Tool tray Tools .5 $0.00    1   
Put together this rolling tool tray. WOW I wish I had this from the beginning. It is the new hot “thing” in our building community. It is really nice just rolling everything around with you.
 
214     Mar 31, 2023 Finished the nose bowl backing Engine Cowl 7 $0.00    8   
Lots of poster board templates as the edges of the nose bowl don't allow for straight lines. Really happy how this will allow for extremely sturdy/rugged attach hardware
 
213     Mar 31, 2023 Upper Nose Bowl Engine Cowl 1 $0.00    1   
Installed a metal strip to reinforce the fiberglass nose bowl for attachment purposes
 
212     Mar 31, 2023 Removable Center Section of Glare Shield Boot Cowl 10 $0.00    3   
This was a long process that had several redesigns through the process. In the end I went with doublers on the two sides and front and will attach with flathead screws via nutplates. Very happy with the outcome
 
211     Mar 31, 2023 Removable Boot Cowl $0.00    0   
 
210     Mar 27, 2023 Removable Top Section Boot Cowl 1.5 $0.00    1   
Cut to size, drilled holes and cleco'ed in place. The holes to attach to the other cowl parts will be drilled tomorrow
 
209     Mar 27, 2023 Naca Duct Boot Cowl 2.5 $0.00    2   
Placed the duct in the boot cowl cut out and got the correct angle for the hose fitting. Then had to drill a large hole (step drill) which was not big enough, so a lot of dremeling and the hose fitting slide into position and was JB Welded in place

 
208     Mar 26, 2023 3rd time was the charm Boot Cowl 5.5 $0.00    4   
Yesterday I set out to make front-middle section for the glare shield and then a removable center section so I have access to the avionics in the future.

I made two yesterday and neither were correct, so today was the 3rd iteration and it came out nice.

Tomorrow I will finalize the already “rough cut” removable part.
 
207     Mar 23, 2023 Boot Cowl avionics access Boot Cowl 3 $0.00    0   
While working on an avionics box this morning I realized I would potentially have a huge problem at some point in the future with a lack of access under the glare shield. I reinstalled the boot cowl, set the windshield on and made a plan to reconfigure the glare shield. Should not be overly difficult
 
206     Mar 22, 2023 Cotter Pins and Safety Wiring Landing Gear 1.5 $0.00    6   
Just buttoning things up as I finish up the Fuselage and get ready for wings

Put cotter pins on the upper gear legs and the lower gear leg. Put safety wire on the brake pads
 
205     Mar 22, 2023 ELT Gremlin fixed Avionics 3 $0.00    2   
Could not work on the nose bowl today, the superfill did not dry overnight as it was too cold in the hanger, so….

I had to get the ELT working, it took:

Several trips crawling back into the tail playing with switches
2 trips to Walgreens
2 trips to ACE
2 phone calls

Who would have known the system needed two different odd sized batteries to make the system work. But the remote horn and panel remote are all working now.
 
204     Mar 21, 2023 Nose Bowl Engine 1 $0.00    0   
Sanding and filling imperfections.
 
203     Mar 21, 2023 Flying Wires Tail Feathers 2 $0.00    4   
Flying wires are on and tail is set. Both H-Stabs are within 0.1�f the datum point on the fuselage. I'll call that good
 
202     Mar 20, 2023 Nose Bowl Engine 3 $0.00    0   
Sanded and filled more holes with superfill. Filled two connection points with JB Weld for extra strength
 
201     Mar 20, 2023 Cotter Pins Tail Feathers 2 $0.00    0   
Installed all the cotter pins on the tail feather connections.
 
200     Mar 19, 2023 General Stuff Controls 7 $0.00    7   
Over two days I had to UN-F^ck some things.
1) had to remove the fuel selector, gascolator and fuel lines so I could re-clock the 45�N fitting for my fuel line attachment
2) day two of messing with trim tabs to get them right, of course the left trim tube that bolts into the horn was not in the bolt hole, so had to UNDO that and then get it lined up and re-bolted
3) my elevator trim horn was just barely rubbing on the left longeron, so had to file a bit off. This was very time consuming doing it without disassembling which would have taken MORE time most likely. I kept filing and testing for contact. Eventually I got it so it did not cut or leave any mark when I put a piece of paper between the longeron and horn.


I also had to bend my bar that attaches to the trim tab arm to clear the elevator/horizontal in the full up elevator position. Used a tube bender to get the job done

I also gave my fuel caps the New Zealand treatment, this entails drilling a hole in both the upper and lower parts of the fuel cap for a diameter to squeeze fit a roll pin, then enlarge the bottom section to all for the roll pin to easily fit through. Knipex pliers are a must for roll pins
 
199     Mar 16, 2023 Breather system completed Engine 1 $0.00    0   

Also installed the over-pressure “T” for the Anti-Splat breather system.
 
198     Mar 16, 2023 Radio PTT Avionics 2 $0.00    0   
PTT gremlin was found and eliminated, it was a ground issue in the pilot side from the stick to the Deutsch connector. �th stick PTT were perfectly with a positive confirmation as “loud and clear” from inside the hanger.
 
197     Mar 08, 2023 Remote Oil Filter, Oil Hoses, Breather tube Engine 5 $0.00    9   
Installed the AirWolf remote oil reservoir and all of the oil system hoses.

Installed the breather tube and terminated it into the exhaust to burn off any excess oil.
 
196     Mar 07, 2023 Fired Up the Panel Avionics 13 $0.00    2   
Two days of work to pull everything together, get the wiring all service looped and secured. This included remounting the ACM (red box), hooking up all the D-Subs. I had to untangle and reposition the harness wires many times to try to make it the most clean and efficient. Both avionics trays are now permanently secured. Wires are looped and secured via standoffs from a bar between the two fuselage bars that the avionics trays are adel clamped to.
 
195     Mar 01, 2023 Sanded nose bowl Engine 3 $0.00    1   
Sanded the edges smooth to the touch, will need to fill some holes with superfill

Searched for flat steel stock 12 gauge for a brace to fit into the channel which the top cowl fits onto
Put hub caps on
 
194     Feb 28, 2023 Nosebowl Engine 2 $0.00    4   
Mounted and initial fit of the nosebowl. Leveled and centered.

Positioning of the nosebowl made it obvious I needed a 1 3/4” prop hub spacer
 
193     Feb 28, 2023 Cable Control Bracket Engine 3 $0.00    1   
This is version 5, and the final version. I extended the mixture clamp to better serve the angle of the mixture arm movement
 
192     Feb 27, 2023 Installed engine pre-heater Engine .5 $0.00    1   
Pretty easy, screw in and safety wire
 
191     Feb 26, 2023 Oil Sump Plug Removal Engine .5 $0.00    1   
Unsuccessfully!!!

The plug must have sealant, will need to use heat to remove it.

Reason for removing is to install the Anti-Splat oil heater
 
190     Feb 26, 2023 Data plate installation Fuselage 1 $0.00    1   
Made backing for the data plate, glued it to the inside of the fabric under the left horizontal, drilled holes for data plate
 
189     Feb 26, 2023 Clean up and protect aft wiring Avionics 2.5 $0.00    2   
Aft wires got a hose sleeve and spiral wrap to protect them from abrasion. Installed a zip tie wrap holder on the firewall to secure wires.

Made a diode jumper for the starter solenoid
 
188     Feb 25, 2023 Added Alternator Shunt and changed Fuse Location Avionics 2.5 $0.00    2   
I had to splice in connectors for the shunt in the alternator wiring.

I also moved the alternator fuse closer to the power source to be more efficient
 
187     Feb 23, 2023 Ignition Key Power Avionics .5 $0.00    1   
Attached the key switch power to the main power buss
 
186     Feb 23, 2023 Alternate USB Plugs Avionics 1 $0.00    0   
Mounted and wired the behind the panel USB plug. Grounds are attached to the buss and the power is attached to the D-Sub
 
185     Feb 23, 2023 Alternator / Voltage Regulator Avionics 3 $0.00    3   
Mounted the regulator on the firewall and ran all the wires to their respective locations both to and from the regulator. Installed the 2amp inline fuse on the wire that attaches to the main power buss
 
184     Feb 23, 2023 Torqued Engine Mount Engine 1 $0.00    1   
I finally got around to torquing the engine mounts to the desired 37 ft.lbs. I had to add some washers to have the castle nuts in the correct orientation.
 
183     Feb 22, 2023 Wire Routing/Planning Avionics 4 $0.00    6   
I decided it would be dangerous to start cutting wires and connecting/splicing wires before I had a solid plan for how the wires would be routed so as to have known wire lengths to deal with. So today I put fasteners on the firewall, mocked up standoffs for the engine mount and ran the wires through sleeves to make everything very clean.

I have attached a photo showing how my mentor used hose and high temp zit ties for routing wires

I will use this method to make standoffs from the engine mount, here are my temporary attach points to get create my wire routing.

Attached are photos of the routing and sleeves I am using to keep thing clean looking.

The above (last photo) will have the red/white/black wires spliced to the yellow/black/red wires and the sleeve will be slid to the left through the zip tie location. All zip ties will be high temp zip ties, the ones you see are GripTies that are easily removable.

I am trying to be as creative as possible to make things as clean looking as possible.
 
182     Feb 21, 2023 Left Wing wiring. Lighting 4 $0.00    5   
Left wing wires are all plugged into the D-Subs
Ignition key switch ground and power were added
EMS wire routing laid out and ready to me connected
 
181     Feb 20, 2023 Right wing/Fuselage end wiring Lighting 6 $0.00    9   
Measured and fished the right wing wires down the sleeve in front of the right door frame. All were 18 ga. shielded wires, the landing lights and wingtip lights were 4 conduit, GoPro power supply was a single shielded 18 gauge. My pins that load into my D-Subs only allow for 20-22ga. so I had to splice in 22 ga. wire using solder splices, all connections were finished in heat shrink tube for a nice clean look. Grounds were made using the shielding and a solder spliced pigtail.

Final routing for the EMS wires was made, right side will be routed from the left to right along the firewall using adel clamps. EMS wires for EGT's and CHT's will be routed down the engine mount to avoid clutter and create working space in the future
 
180     Feb 16, 2023 Electrical Cables Avionics 1.5 $0.00    0   
Made the electrical cables for:
Alternator to 60amp fuse
60amp fuse to master
Starter solenoid to starter
Main battery negative to firewall passthrough stud
 
179     Feb 15, 2023 Control cable installation and passthrough Controls 8.5 $0.00    8   
Throttle and mixture are vernier assist, so the panel holes had to be upsized to fit. Throttle cable diameter is larger so I used a sphere passthrough, all others used a grip no slip passthrough

Installed the fuel firewall passthrough and installed the EI Gold Cube for fuel flow meter
 
178     Feb 06, 2023 Magnetos Engine 3 $0.00    0   
Ok, 2 hours of the three hours was spent scratching my head and researching the P-Leads to the magnetos. Planned out the ignition switch wiring and the digital feed from the magnetos to the tachometer.
 
177     Feb 06, 2023 Sky Light Fuselage 2 $0.00    0   
Bolted down the left sky light
 
176     Feb 06, 2023 Ground Bus Avionics 2 $0.00    0   
Installed the ground bus and a brass 5/16” brass bolt with the head cut off to run negative through the firewall. The brass bolt allows the engine and battery to be grounded
 
175     Feb 04, 2023 Wiring and EMS Progress Engine 5 $0.00    11   
Drilled holes in the exhaust and mounted the EGT probes

Installed circuit breaker from the alternator to the master solenoid. Made up the wiring from alternator to the master.

Cut hole in firewall for the EMS wires, installed the Avery FW pass through and fished the wires through
 
174     Feb 02, 2023 Installed Solenoids Engine 1 $0.00    2   
Installed the master and starter solenoid on the firewall
 
173     Feb 02, 2023 Control Cable Bracket Engine 3 $0.00    5   
I re-did the control cable bracket with stiffer .080” T-3 2024 sheet metal. I put in 3/4” aluminum angle for the adel clamps to hold the cable sleeves
 
172     Feb 01, 2023 Oil cooler fittings Engine 2.5 $0.00    0   
Took a lot of time clock the an fittings for the oil system hoses.
 
171     Jan 15, 2023 Installed screws on the right center and skylight overhead Fuselage 3 $0.00    3   
Took hours to install about 25 screws. I used nylon washers, crush washer and acorn nuts
 
170     Jan 13, 2023 Wiring Day, hooking up network harnesses and building D-Subs Avionics 5 $0.00    10   
Installed Comm and GPS antennas. Installed D-Sub for the gps to connect to the network system

Control Stick PTT, spliced the two grounds into one for the D-Sub. After the spliced used shrink wrap and installed the D-Sub. All plugged into the ACM

Temporarily installed the pilot side headset jacks

Hooked up all the network harnesses creating a huge mess that will be cleaned up and secured with service loops.
 
169     Jan 12, 2023 Metal Center Overhead IN Placde Fuselage 2.5 $0.00    8   
Installed (with clecos) the metal center overhead. All weatherstripped and fitted for final screws to be installed
 
168     Jan 11, 2023 Terminated coaxial cable end Avionics 1 $0.00    0   
ADBS, Comms and Transponder coaxial cable ends were installed on the cables and attached to the appropriate avionics
 
167     Jan 11, 2023 Installed Skylights Fuselage 4 $0.00    3   
I applied weatherstripping on the three sides that fit into the channels, weatherstripping under outside section more for cushion than weather. Had to tap them in with a rubber mallet as the fit was very tight. I used I/16th” nylon washers under the glass and inside the channel to put upward pressure on the glass so the weatherstripping would press against the channel. They will bolted in when the center metal section is installed
 
166     Jan 11, 2023 Painted the overhead middle section and inspection covers Paint / Decals 2 $0.00    3   
Repainted the middle overhead section which is metal, also painted the plastic inspection covers. Color as identical but look different due to lighting
 
165     Jan 08, 2023 Alternator Installation Engine 3 $0.00    2   
Should not have taken 3 hours but it did. Drilled safety wire holes on the support arm, deburred and primed the drilled area.
 
164     Jan 07, 2023 Measuring for cables Engine .5 $0.00    1   
Measured the cable lengths so I can order them
 
163     Jan 07, 2023 Throttle/Mixture bracket Engine 2 $0.00    5   
The Vans bracket did not fit my carb setup, so it was time to fabricate
 
162     Jan 05, 2023 Reinforcement patch on handle area Fuselage 2 $0.00    2   
Added reinforcement patch by using a 3” tape to bolster the durability of the handle area on both sides
 
161     Jan 05, 2023 Battery Box and Cabin Heat Firewall 3.5 $0.00    3   
Battery box had to be slightly adjusted as it was angled in and a bit too tight for the battery. Cabin heat pass through are all installed.
 
160     Jan 04, 2023 Holes in Firewall Firewall 4 $0.00    5   
Mounted the brake fluid reservoir, battery box and drilled holes for the 2 cabin heat pass through.
 
159     Jan 03, 2023 Door Windows and Skins Fuselage 5 $0.00    1   
Finally finished upsizing the holes in the Lexan windows to 3/16”s, upsized the door skins to 11/64”s. Had to redo a door skin panel as I upsized the WRONG row of holes. Be careful and drill the correct holes.
 
158     Dec 31, 2022 Upsizing window frame and glass holes Fuselage 2.5 $0.00    1   
Upsized the holes in 4 stages on the window frames from 1/16th to 11/64th, upsized to 11/64th on both upper windows, need to go one more size up to 3/16th

Door skins will be next to match the frames for the #8 screws
 
157     Dec 30, 2022 Window Framing Fuselage 6 $0.00    4   
Measured all the window framing pieces, marked and punched the hole locations. Drilled holes 1/16”, will upsize tomorrow. Holes in the window will be oversized for the possible changes due to temperature variation. Lots of measuring and math to get the holes evenly spaces for each framing piece
 
156     Dec 28, 2022 Door window frames Fuselage 3 $0.00    6   
Used flat aluminum 1/16” to create a window frame to sandwich the window. Top swing up doors were fairly easy, bottom door was much more difficult with lots of angles. I did the top two and the bottom left door
 
155     Dec 28, 2022 Finished AP Servo Harness Avionics 3 $0.00    6   
Wired the D-Sub plugs at the servos, secured the wires and connected. Shrink tubing goes into the D-Sub plug and has another layer that terminates at the plug housing.
 
154     Dec 27, 2022 Installed Connectors for the Control Sticks Avionics 2.5 $0.00    4   
Laid out the PTT wire routing, installed a grip tie tie down to secure the wires/tubes to the deutsch connector. Installed the male deutsch connector to the pilot and co-pilot PTT wiring. Triple shrink wrapped the wires leading to the deutsch connector. Secured the roll servo harness wire to the tie down. Safety wired the connection to the roll servo
 
153     Dec 27, 2022 Trim Actuator covers Tail Feathers 2 $0.00    5   
Made two covers with the slot for the trim actuating lever
 
152     Dec 26, 2022 PPT and AP Harness Avionics 3.5 $0.00    6   
Cut hole in floorboard under right seat to all the routing of the PTT wires from the control stick to pass down and forward as well as the AP Servo wires to pass up to the servos. Installed the Servos in the brackets and secured with safety wire.
 
151     Dec 24, 2022 Engine Monitors and CHT's Avionics 5.0 $0.00    5   
Cut a hole in my left avionics tray to allow the EGT/CHT and Engine Thermo wires down for the firewall pass-through on the left side. Final mounted the Backup Battery and Engine monitor box on the tray as well as the ACM. ACM might need to come off as it is blocking access to one of the adel clamps needed to secure it to the tubing. AP harness wires are all laid out, just waiting to decide on the final/exact routing then cut to length and install the D-Sub. Installed the CHT probes
 
150     Dec 23, 2022 More Wiring Avionics 2.5 $0.00    3   
Working on control stick and AP servo wiring
 
149     Dec 21, 2022 Wiring Avionics 4 $0.00    9   
The control PTT wiring with disconnect modules and the wires from the disconnect to the COM harness which is spiral wrapped. The AP servos are now wired and the D-Sub attached to both servos.
 
148     Dec 16, 2022 Final mounting of the Oil Cooler Engine 2.5 $0.00    3   
Brackets made with nutplates using flush rivets so the oil cooler sits flush to the angle support

Need to remake the bottom support as the final fitting lifted the outside edge of the oil cooler about 1/4”.
 
147     Dec 15, 2022 Wire routing Avionics 2 $0.00    2   
Worked out the wiring layout from the forward station up to the right avionics tray. Ordered spiral wrap to secure the wires together. More to come
 
146     Dec 15, 2022 Oil Filter Engine 3 $0.00    4   
Using angle and fuel lines I secured (temporarily) oil cooler to the firewall.
 
145     Dec 13, 2022 Nutplates and trays Avionics 5 $0.00    4   
Fitted boxes on the top and the ACM on the bottom. I used 1” nylon spacers on the bottom to give relief from bolt heads and the fuselage tubing for the ACM. Everything is still loose fit in regard to the bolts as there will be more on and off to cut holes in the tray for wires to pass through and install grommets
 
144     Dec 11, 2022 Avionics Trays Avionics 3 $0.00    4   
Final Cut the trays after installing the fresh air scat tubing so I see the clearance needed. Drilled holes for the nutplates, then primed and installed the nutplates
 
143     Dec 11, 2022 Windows Fuselage 7 $0.00    2   
Yesterday I picked up a lower door to begin the framing process of securing the windows in place only to notice one was cracked. Lower doors have a difficult shape and this took a good 4 hours to fit a new one. Luckily I had leftover .125 glass

Then I sanded and sanded and then sanded some more, so all windows all have super smooth edges
 
142     Dec 08, 2022 Hanging the engine Engine 5 $0.00    5   
YEP, took five hours to get the engine mounted. Not fun but it is done. Lots of adjustments with the hoist, lots of drift pins, lots of crushing. I did use a ratchet strap to squeeze the lower engine mount holes to line up with the engine case holes.
 
141     Dec 07, 2022 Trimmed Avionics Tray Avionics 1 $0.00    1   
Trimmed the avionics tray so there is very little overhang in the middle to eliminate the tray edge form possibly chaffing wires/harnesses
 
140     Dec 07, 2022 Cover Plates Controls 3 $0.00    3   
I had re-make the rectangular cover plates for the rear horizontal stabilizer. The original cover was made and holes drilled when layer flat, but the fuselage has a curve and the holes no longer lined up. So it was a redo
 
139     Dec 06, 2022 Wire conduit and Running wires Avionics 2.5 $0.00    6   
Cut the conduit and then ran the headset jacks so they can be mounted on the wing root panel. Ran the Comms coaxial cable through the conduit to the right avionics tray

Started attaching the wiring harnesses to check for proper lengths reach.

Checked several mounting locations for the ACM.
 
138     Dec 06, 2022 Avionics Box Trays Avionics 1.5 $0.00    4   
Used the template to mark up and then cut the trays for the remote avionics. One for each side.
 
137     Dec 05, 2022 NACA Cuts Boot Cowl 2 $0.00    1   
Took a few tools and a lot of patience, but the NACA cuts are in for the “air conditioning”
 
136     Dec 04, 2022 Exhaust Suspension Engine 2 $0.00    1   
Had to do a bit of bending to the exhaust attach ring to match the angle of the supports. The support tubes that attach to the engine mount had to be shortened.
 
135     Dec 02, 2022 Mounted the Prop Propeller 1.5 $0.00    2   

The prop was mounted temporarily so I can get the magnetos timed. No need to have the prop on at this time. The hub will stay on though.
 
134     Dec 02, 2022 Mounting the Exhaust Engine 3 $0.00    4   
I ordered a Vetterman exhaust based on great recommendations. I have had it for a couple of months, but only opened the box today. It looked like a jigsaw puzzle. But a look at the directions and it became clear what needed to be done. Except you can't tighten down the top pieces that mount to the cylinder because you then can't fit the next part. Ask me how I know. So there was a bit of putting one, taking off, loosening etc. I am very impressed by the exhaust. I measured from two points to two to have the dual pipes to have the same angle.
 
133     Dec 02, 2022 Hung the engine Engine 1.5 $0.00    6   
I removed a magneto, used lot of duct tape to protect the engine mount from scratches. In the end it was pretty easy by following a “how to” posted to the internet but some Vans builders
 
132     Dec 01, 2022 Inspection covers Fuselage 1.5 $0.00    2   
Due to a less than idea fit, I redid the forward horizontal stabilizer inspection covers
 
131     Nov 12, 2022 Prep for primer Boot Cowl 4 $0.00    1   
Removed the plastic, touched up the edges to remove any sharpness. Next was to use scotch bright to prepare for self etching primer. Each piece for two coats of primer per side
 
130     Nov 11, 2022 Installed the Panel Avionics 2 $0.00    6   
Hung the panel for the initial fitting, it will need to be removed to drill holes for the throttle and mixture
 
129     Nov 11, 2022 Installed eats and finalized Seatbelts Interior Finish 2.5 $0.00    3   
Seats are in and the seatbelts are all set. LAst step was to add the bungee to the front of the seat as a retainer for the crotch strap
 
128     Nov 10, 2022 Firewall and Engine Mount reinstall action Engine 3 $0.00    3   
Reinstalled the firewall and engine mount in preparation for the engine to be mounted.
 
127     Nov 10, 2022 Prepped, Primed and reinstalled the boot cowl Boot Cowl 6.5 $0.00    3   
Removed the plaster from the fitted boot cowl, used scotch bright as prep for the priming. Primed and then wet sanded with 600 grit to finish the priming process and prepare for the final painting. This was all about getting set for the panel installation.
 
126     Nov 09, 2022 Back on the Gear Landing Gear 6 $0.00    3   
Had to remove the bushwheels from one set of wheels, install them on the ones for my brakes, then go through the long process of installing everything
 
125     Nov 06, 2022 Seat Belt attach points Fuselage 1 $0.00    2   
Had to tap drill the two outside seatbelt attach points and install helicoils for the AN4 bolt as it is not possible to do a pass through
 
124     Nov 06, 2022 Seat Belt attach points Fuselage 1 $0.00    2   
Had to tap drill the two outside seatbelt attach points and install helicoils for the AN4 bolt as it is not possible to do a pass through
 
123     Nov 06, 2022 Covering is done Fuselage 9 $0.00    9   
Finished all the seam tapes today. The top of the empennage to vertical to a lot of work, but that is not a surprise with the compound curves
 
122     Nov 03, 2022 Left and Right side covering finished Fuselage 6.5 $0.00    7   
Finalized the left and right sides which were troublesome due to a compound curve.

Cut the final piece and taped off the top for the glue lines
 
121     Nov 02, 2022 Left side finished Fuselage 6 $0.00    3   
Left side covering is finished, only thing left is taping the seams which will be all done at the very end
 
120     Oct 31, 2022 Covering the Vertical Stabilizer Fuselage 7 $0.00    6   
Finally finished the Vertical. I used separate pieces of fabric for both right and left sides to be able to get the fabric to lay down so I could rib stitch the lowest rib.
 
119     Oct 27, 2022 Prepped for Left Side Covering Fuselage 3 $0.00    7   
Static, AOA and Pitot lines were plumbed, ADSB and Transponder antennas were installed and hooked up to the coaxial cables
 
118     Oct 21, 2022 Right side Fabric Fuselage 6 $0.00    6   
Made a lot of progress today with tacking and shrinking. I got the window and both inspection holes cut out as well
 
117     Oct 20, 2022 Cut both right and left fabric and attached left Fuselage 8 $0.00    3   
Both right and left were cut to size and lined for glue. Right side fabric was glued as was the right side fuselage. Tacked the fabric on the side stringers
 
116     Oct 19, 2022 Prep for covering Fuselage 4.5 $0.00    4   
Riveted in the outer window frames and permanently set the inspection cover backing plates
 
115     Oct 18, 2022 Inspection Covers Fuselage 1 $0.00    3   
Made the backing and covers for the tail feather attachements, made the covers for the forward horizontal attach location
 
114     Oct 18, 2022 Bottom Covering Complete Fuselage 15 $0.00    4   
Two days and 15 hours later and the bottom of the fuselage is covered. It was pretty easy, I did need a second pair of hands for an hour or so moving the large fabric piece back and forth several times from the fuselage to the table
 
113     Oct 17, 2022 Prepped for Covering Fuselage 2 $0.00    2   
Attached 2x4's to the fuselage engine mount holes to be able to rotate for covering. Removed the gear (gear since covered). Inverted to start on the bottom
 
112     Oct 17, 2022 Gear Covered Landing Gear 18 $0.00    10   
Covered the gear, only tricky thing was trying to make the brake line coming out of the coving to look as clean as possible.
 
111     Aug 23, 2022 Right side Cargo enclosure Fuselage 3 $0.00    7   
Installed the right side cargo wall and started taping for the window installation.
 
110     Aug 15, 2022 Left side cargo covering Fuselage 4 $0.00    5   
I had planned to do both the left cargo wall and left window, but life got in the way. Left cargo wall is now in.
 
109     Aug 12, 2022 Fitting of the skylights Fuselage 2.5 $0.00    7   
I measured, measured, and measured, then…..

Yep today was skylight day. Right wide was perfect for width, but needed one trimming cut after the initial cut. Left side required two length trims, but both are fitted. It was surprisingly easier than I thought, I was expecting the worst with the compound curve.
 
108     Aug 11, 2022 Finished covering Tail Feathers Tail Feathers 50 $0.00    17   
Tail Feathers are completely covered and stored. It was a long arduous process, but with the Oratex it is nice when you get the covering on it is finished, no pointed and such.
 
107     Aug 11, 2022 Cargo wall window covering Paint / Decals 1 $0.00    4   


I have been trying to get my head around the covering/lining of the cargo area sides. I have a plan now, so brought home the outside half of the left window frame to attach the fabric to the frame. I am happy how this turned out, just note it is not shrunk/final fitted so it looks a bit messy at this time.
 
106     Jun 19, 2022 Trim Tabs, Elevators and Horizontals covered Paint / Decals 25 $0.00    9   
It was a long slog but all tailfeathers but the rudder are covered.
 
105     Jun 16, 2022 Horizontal Stab Covering Paint / Decals 8 $0.00    19   
Making progress, but it is very slow to get it right
 
104     Jun 16, 2022 Horizontal Stab Covering Paint / Decals 8 $0.00    18   
Making progress, but it is very slow to get it right
 
103     Jun 09, 2022 Covering Elevators and Trim Tabs Paint / Decals 31.5 $0.00    13   
After my original diabolical with covering, I got a two day lesson on covering with Oratex. I finished up at home today after 27.5 hours the past two days. I learned when you think you are going slow, like REALLY SLOW….. you are still going too fast. The edges required attaching about 1 inch at a time. I was pretty frightened about rid stitching, but it was not that bad. Everything came out really well.
 
102     Jun 07, 2022 Covering tailfeathers Paint / Decals 14 $0.00    1   
Covering the elevators and trim tabs.
 
101     Jun 06, 2022 Covering issues Paint / Decals 18 $0.00    3   
Had to strip the fabric of of both elevators. The first one (right) was just really poor quality do to me being a beginner, the left elevator was about 95% quality, only problem was one of the hinge brackets was just not aligned properly. Removing the fabric not terrible, just used the heat gun and it came off. The glue was NOT so easy. Oratex glue was near impossible to remove.
 
100     May 20, 2022 Inspection holes/plates Empennage 8 $0.00    13   
Templates, transfer, cut trim, de-burr, sand, prime, attached the nutplates with Clickbond…. Yes it was quite the process. Then the inner ring was fitted to be flush to the tubing under the fabric. I used a nearly 90* angle to attach the rings to the stringer.
 
99     May 17, 2022 Drilled and set the clamps to hold the brake lines Landing Gear .5 $0.00    1   
Just aligned the clamps to create the correct location to drill the hole.
 
98     May 17, 2022 Finished Wing Root Panels Interior Finish 4 $0.00    8   
Used Click-Bond adhesive to attach the “tabs” with the rivet nuts for the attachment of the actual panel. I used a rigid straight edge to make sure the alignment was correct for the tabs. I drills pilot holes from the back of the rivet nut then removed the panel and upsized the holes to fit.
 
97     May 12, 2022 Installed seat bottom cushions Interior Finish 1.5 $0.00    2   
I had to have my seat bottoms redone as the first ones were too tall, meaning the cushions were too thick. Daniel at Sport Aircraft Seats was amazing and these are perfect
 
96     May 12, 2022 Wing Root Panel Fuselage 4 $0.00    6   
Cardboard, scissors, sharpie and it was template time. They it was transferring to .025 sheet metal, then the cutouts and fitting.
 
95     Apr 06, 2022 Wire retention and wires Avionics 2 $0.00    3   
Installed the wire retention devices to hold the wires for the run up to the panel area. Also installed ADSB, Transponder and ELT wires and ran them to the panel area
 
94     Apr 06, 2022 Floor boards and cargo area Fuselage 2 $0.00    1   
Used Scotch Bright to remove scratches and prepare for the carbon fiber wrap. Also re-installed the underfoot floorboard as well the fuel selector. Also brought al the floor boards and cargo closeouts home in preparation for covering
 
93     Apr 05, 2022 Middle section of the roof/sky light Fuselage 3 $0.00    5   
Drilled the wholes for the GPS and Comm antennas in the metal center section of the roof over the seats. Used scotch bright to prepare the metal for paint/wrap. Upsized the drilled holes for final rivet size.
 
92     Apr 05, 2022 Floor Boards Interior Finish 2 $0.00    3   
Final fit of the autopilot servo mounting brackets on the floor boards. Applied the carbon fiber wrap to floor boards
 
91     Apr 04, 2022 Center roof section Fuselage 3 $0.00    3   
Cut and fit the .040 2024 T3 middle section of the roof/skylight area. Taped and drilled then upsized the holes in the support rails. Measured to get the metal fit to have equal overhangs on both the right and left, then match drilled from the middle fore and aft alternating left and right to keep everything even
 
90     Apr 04, 2022 ADAHARS Tray Avionics 3 $0.00    1   
Had to fabricate a tray for the ADAHARS so it is +/- 1.0 degree of level to the fuselage's level datum. I got it to 0.1 degree of level. The tray has three bends to attain the correct orientation.
 
89     Apr 01, 2022 Brake lines Landing Gear 2 $0.00    3   
Bought pre-made brake lines from Pegasus and they look great.
 
88     Apr 01, 2022 Securing Lines Fuel System 2 $0.00    6   
Took care of any possible rub/friction areas with 8 to 1 shrink tubing as well as using adel clamps to secure the lines to the back of the door former
 
87     Mar 28, 2022 Brake Line mock up Controls 2.0 $0.00    1   
Mocked up the brake lines so I am good to go on marketing the permanent lines
 
86     Mar 28, 2022 Flap Cable Rub Block Fuselage .5 $0.00    2   
My left and right flap cables were rubbing on the upper longeron, so I installed rub blocks
 
85     Mar 24, 2022 Right seat bottom webbing installed Fuselage 3 $0.00    4   
Attached the right seat bottom webbing to the frame, started fitting the right seat bottom cushion
 
84     Mar 23, 2022 Right Rear Window Fuselage 2.5 $0.00    3   
Used the template to trace out, then rough cut and finally sanded and filed to fit into the window frame,
 
83     Mar 23, 2022 Seat Back webbing Interior Finish 2 $0.00    4   
Used Poly-Tak to attach the Sport Aircraft seat backs to the seat frames.
 
82     Mar 22, 2022 Rear Windows Fuselage 1 $0.00    2   
Finished the rear window template and transferred the outline to the “glass”
 
81     Mar 22, 2022 Secured fuel lines Fuel System 1 $0.00    0   
Used adel clamps to secure the fuel lines to the fuselage
 
80     Mar 22, 2022 Completed Cargo extension/box Fuselage 3 $0.00    3   
Final fit and attached in 3 places
 
79     Mar 22, 2022 Antenna trays Avionics 4 $0.00    2   
Completed and installed the Transponder and ADSB antenna trays/mounts
 
78     Mar 09, 2022 GPS and Comm antenna shield Avionics 6.5 $0.00    9   
Who would have thought it would take six and a half hours to make/fit/install two mounting plates. The stringers are not parallel so that added time. I used angle aluminum at the front and back of each shield to make them extremely stiff. I ran out of time, so the GPS plate/shield still needs to be riveted to the stringers.
 
77     Feb 20, 2022 Cargo Closeout and Baggage Door Fuselage 15 $0.00    7   
Finished the cargo tube, it is all connected via nutplates to the cargo closeout. Cargo closeout baggage door fitted and attached
 
76     Feb 20, 2022 Static Port tubing Avionics .5 $0.00    0   
I plumbed the static ports up to the firewall area. The “T” still needs to be secured to the brace, I am waiting on the proper bolt size to arrive
 
75     Feb 16, 2022 Static Port location finalized Avionics .5 $0.00    3   
Upsized the holes for pull rivets and then riveted in the mounting plates
 
74     Feb 16, 2022 Back wall of cargo area Interior Finish 6 $0.00    6   
Lots of measuring and fitting of a cardboard on the top edge and bottom, then used poster board for the template before tracing over on the sheet metal. I purposely over cut the sheet metal and then slowly fitted it to a perfect fit. The poster board when in and out at least 15 times, the sheet metal was in and out at least 10 times to get the fit just right.
 
73     Feb 12, 2022 Rear Windows Fuselage 3 $0.00    3   
Drilled out the factory rivets of the window frames as they were on the wrong way. Drilled and match drilled the frames to the door former. Cut the angle to cover the window frame. Angle is only clamped in at this point
 
72     Feb 12, 2022 Re-did the left side boot cowl Fuselage 2 $0.00    2   
I was unhappy with the fit of the original, so I re-made the left side
 
71     Feb 12, 2022 Installed the Static Ports Avionics 1.5 $0.00    2   
Fabricated the plates, put in a 90 degree bend to mount on the stringer. Cut a 1/2” hole via step up drill process for the static port. Used Clickbond glue to attach the port to the plate. Drilled, the plate and match drilled the stringer for permanent rivets.
 
70     Feb 12, 2022 Fabricated plates for covering Tail Feathers 4 $0.00    7   
I fabricated several plates in order to stop fabric shrinkage during the heating process.
 
69     Feb 06, 2022 Right Lower Door Window Fuselage 2 $0.00    3   
Cut and fitted the right window for the lower door. Also trimmed the front door skin to clear the boot cowl when fully open
 
68     Feb 05, 2022 Rudder Pedal Spring Fuselage .5 $0.00    1   
Changed out the rudder pedal springs to a stronger spring
 
67     Feb 05, 2022 Left Lower Door Fuselage 3 $0.00    1   
Cut and fitted the acrylic for the lower door. Also trimmed the front of the door skin for clearance on the boot cowl when fully open
 
66     Feb 03, 2022 Rudder Cables Fuselage 2 $0.00    3   
Finished the cables connecting the rudder pedals to the rudder cable horn
 
65     Jan 13, 2022 Upper and Lower Door Fuselage 7 $0.00    13   
After an epic fail as cutting acrylic yesterday, today I managed to get the acrylic cut and fitted to the upper doors. I copied a friends BH and cut the skins on the lower doors for a much bigger window.
 
64     Jan 11, 2022 Upper Side Stringer Fuselage 1 $0.00    0   
Fabricated an angle bend of sheet metal to attach the front of the upper side stringer to the rear door former
 
63     Jan 11, 2022 Skylight Fuselage 1.5 $0.00    2   
Permanently riveted the skylight to the fuselage
 
62     Jan 08, 2022 Golf Club cargo tube Fuselage 3.5 $0.00    2   
I used kydex for the container, and 2024 T-3 for the base of the “tube” to hold it secure to the fuselage.
 
61     Jan 08, 2022 Mouse Trap doors Fuselage 5 $0.00    6   
Lots of trial and error fitting the piano hinges, took a few attempts to get each one correct. The actual trap doors each took two attempts to get the right fit.
 
60     Jan 05, 2022 Upper Doors Fuselage 7.5 $0.00    11   
Fitted, drilled and cleco'ed both right and left upper doors. Outside front and rear were cut/mitered to match the top and bottom. Drilling and match drilled to match the inside window brace.
 
59     Jan 05, 2022 Upper D Fuselage $0.00    0   
 
58     Jan 03, 2022 Upper Door Window Frame Fuselage 3 $0.00    5   
Cut and fit the frame that holds the acrylic window against the outer frame covering.
 
57     Dec 28, 2021 Lower doors Fuselage 3 $0.00    9   
Drilled and cut the patroller window on the right lower door as well as trimmed the top of the side skin at the front and back for both the right and the left doors so allow the doors to fully shut. Drilled the door latch holes in the door frame for both left and right doors.
 
56     Dec 24, 2021 Lower door Fuselage 9.0 $0.00    17   
Drilled holes in the door frame, match drilled in the skins, drilled and set the top angle for the door. Cut the hole for the patroller window and was then trimmed and all edges smoothed. I rolled the skin to fit on the window. Window frames were glued together and the acrylic was set into the frame
 
55     Dec 22, 2021 Lower Door top fitting Fuselage .5 $0.00    2   
Cut aluminum angle to fit on top of the lower door
 
54     Dec 22, 2021 Lower Door Windows Fuselage 6.5 $0.00    5   
Cut frame for window/acrylic. Cut and fitted the acrylic to fit inside the frame, then cut and fitted the backing to hold the acrylic in the frame and to the door skin.
 
53     Dec 16, 2021 Rear Window frames Fuselage .5 $0.00    1   
Re-installed the window frames and started to bend the supports to make a clean line to work with the covering.
 
52     Dec 16, 2021 Door Skin Fuselage 3.5 $0.00    5   
Mounted the skins on each door, this took some cutting and filing to get the proper clearance for the door hinges. Spent a good 2 hours exploring a way to have a patroller window in the door.
 
51     Dec 16, 2021 Mounted the landing gear, wheels and tires Landing Gear 2 $0.00    4   
Finally got the AN6-6 bolts to attach the brake torque plate to the gear legs. This allowed me to then put on the brakes, wheels and tires for the first time.
Torque plates are each attached with two AN-5 bolts using bushings (due to clearance on the bolts) and two AN6-6 bolts
 
50     Dec 15, 2021 Measured Elevator for Deflection Controls .5 $0.00    0   
Elevator is perfect for deflection up and down
Down elevator – 21.3 degrees
Up elevator – 29.0 degrees
 
49     Dec 15, 2021 Final assembly of control sticks Controls 1.5 $0.00    4   
Took out the temporary bolts and did the permanent bolts, castle nuts and cotter pins
 
48     Dec 15, 2021 Cut Stick Down and Installed Grips Controls 2 $0.00    1   
Control Sticks were too long for the grips, so had to trim 1.75” off the top for clearance of the panel
 
47     Dec 15, 2021 Hung Doors and Windows Fuselage 1.5 $0.00    2   
Had to ream the holes and then flatten one side of the pin head for clearance
 
46     Dec 14, 2021 Sky Light and Window Former Painting Fuselage 2.5 $0.00    1   
Had to drill out the rivets on the front window retainer to remove. Used two coats of etching primer and then two coats of black satin paint on the sky light and front window former.
 
45     Dec 14, 2021 Stringers Fuselage 1.5 $0.00    1   
Riveted in the left and right side stringers, all stringers are now riveted in. Required some upsized drilling to fit the pull rivets.
 
44     Dec 14, 2021 Flap Rigging to the 1-2 plate Controls 1 $0.00    2   
I could only go that far as I am waiting on a bushing for the flap pulleys. Had to upsize the holes in the 1-2 plate to accept the AN3 bolt
 
43     Dec 13, 2021 Rigging the Elevator Controls 3 $0.00    4   
Rigging is a slow process, lots of checks and rechecks on cable length. But got the elevator all done and perfectly tensioned. Doing it solo was extra slow as I had to continuously monitor the control stick angle (90* to the fuselage) and the elevator being squared to the horizontal stabilizer.
 
42     Dec 13, 2021 Trim Rigging Controls 3 $0.00    3   
Rigged the trim (lost one of the sleeves/clamps and will do the last of the 6 in a few days) system, used one clip lock turnbuckle in the closed loop system to allow for fine turning
 
41     Dec 12, 2021 Ski/Golf Club compartment Fuselage 1 $0.00    3   
Got started on the specialized baggage compartment for skis and golf clubs. I am using Kydex and forming it with a heat gun.
 
40     Dec 12, 2021 Axle Landing Gear 1.5 $0.00    0   
Drilled the cotter pin holes in the axles. I put the tires/wheels on the axle and hand tightened the castle nut, test spun the wheel to confirm it was not binding. Next was setting up the drill press to make sure the drill was dead center for the cotter pin. I started with a pilot hole all the way through then went with a 1/8th” drill for the cotter pin.
 
39     Dec 10, 2021 Wheels and Tires Landing Gear 2 $0.00    2   
Cleaned the temporary bearing grease and then repacked the bearings the wheels. Mounted the tires on the wheels
 
38     Dec 10, 2021 Brake Torque Plates Landing Gear 1.5 $0.00    2   
Match drilled and set the torque plates on the landing gear. Waiting on the AN6-5 bolts to arrive for the final two holes on each gear leg
 
37     Dec 09, 2021 Torque Plate Installation Landing Gear 2.5 $0.00    0   
Clamped and marked holes to be drilled for the torque plate on the right landing gear. Had to remove the landing gear to do this.
 
36     Dec 08, 2021 Bottom Cowl extension re-do Boot Cowl .5 $0.00    0   
Used the old messed up piece to trace the shape for the new bottom cowl extension
 
35     Dec 08, 2021 Tires Landing Gear .5 $0.00    0   
Used powder to form a protective coating for inserting the tube inside the tires
 
34     Dec 03, 2021 Trim Tabs Tail Feathers 4 $0.00    6   
I used a hacksaw to remove the trim tabs from the elevators and then they required a lot of filing and sanding to get rid of welding residue. The elevator was the same, needed lots of sanding and filing. Once both were sanded to shape I primed the bare metal with two coats for corrosion protection.
 
33     Dec 02, 2021 Counter Sinking holes Instrument Panel 1 $0.00    2   
This was easy, just used the countersink tool on the drill to size for #6 screws
 
32     Dec 02, 2021 8 days of Boot Cowl Work Boot Cowl 55 $0.00    41   
I had a deadline to hit on the boot cowl as I needed to finish it so I could send the panel to Dynon. It was all day everyday for 8 days. There were some minor mistakes, and one major that will be corrected when I return from my work trip. In one photo you can see several holes in the boot side cowl. Luckily I had extra to be trimmed off and it was not an issue. Getting the side cowl to really have a perfect shape was a lot of work, in the end I used straps to hold it in place so I could drill the holes. I had never done sheet metal work, so this was very frustrating at times, and occasionally rewarding. I messed up the bottom cowl extension, and will get that fixed soon. I had to order a piece of sheet metal and will have to copy and trace from the messed up piece to make the new one. Overall this has been the most challenging part of the build to date. Doing this will the help of someone else would be a lot easier. Tons of templates were created to prepare for cutouts and trimming to fit around the both the glare shield cabane and the landing gear struts.
 
31     Dec 02, 2021 Panel Attach fabricated Instrument Panel 3 $0.00    5   
I got a 3/4 x 3/4 aluminum angle, but it to length then with the help of a friend shrunk it to fit the shape of the panel. It turned out beautifully and will be perfect for the panel and glare shield attach points
 
30     Dec 02, 2021 Insulation and sound proofing Firewall 8 $0.00    7   
This was a long task, I had to make templates for both the front and back of the firewall. I put Newton Z-Flex aluminum with fiberglass glass backing on the front and KookMat on the cabin side of the firewall. The templates took a lot of trial and error. Once the template was done I cut a bit oversize and them trimmed down to a perfect fit. I used 3M adhesive spray to attach both. I let did each at the end of a day so they could cure overnight with a lot of clamps to hold in place.
 
29     Dec 02, 2021 Drilling and fitting to Fuselage Firewall $0.00    0   
I was very concerned about making sure I drilled the holes perfectly so the firewall was centered. There was lots of clamping and adjusting, lots of testing with the drill prior to actually drilling out the holes. There was a lot of epoxy paint and welding crud that had to be clean/reamed/drilled out prior to the drilling of the firewall. I used a dab of white paint on the tip of the drill to finally confirm that the firewall was perfectly centered. It was a nervous moment, but it went smoothly.
 
28     Dec 02, 2021 Installed the Landing Gear Landing Gear 6 $0.00    7   
This was an exercise in frustration. For the life of me I could not get things to fit. There was a lot of messing about and a bit of trimming attach point surfaces. In the end I had to attach the strut to the landing gear legs, THEN attach the strut to the fuselage. This took and entire workday
 
27     Dec 02, 2021 ELT Mount Avionics 3 $0.00    1   
Fabricated and installed using adel clamps, I later added a bend to the front edge to add stability
 
26     Dec 02, 2021 Sky Light and windshield attach area Fuselage $0.00    1   
Had to drill out the temporary rivets for the skylight frame and the windshield attach at the front. Everything was then drilled to size, match drilled and the skylight frame cleco'ed back in. I did rivet in the top windshield attach area, but it will be coming back out as I decided to paint all of these pieces black
 
25     Dec 02, 2021 Floorboards Interior Finish 9 $0.00    8   
Tabs were drilled to size and the floorboards were then match drilled. I am using ClickBonds in place of tinnerman clips as they are much stronger and will not fall off. Floorboards were fit very well from the factory and required only a bit of trimming to be fit into place. The floorboards under the seats requiring some trimming and bending to allow for the elevator cables to pass through. I highly recommend ClickBonds. The plate to cover the exposed area around the flap area was not overly difficult, took about 1.5 hours. The hole for the fuel sector was a bit of a challenge to get the right spot for the initial hole and then lots of time to slowly get it to size.
 
24     Dec 02, 2021 Mock Cable lines Controls 3 $0.00    6   
Fairleads were installed. Springs were installed on the Rudders. Parachute cord was put in to mock up the cable runs to all surfaces except the ailerons.
 
23     Dec 02, 2021 Fuel lines finished and leak tested Fuel System 6 $0.00    23   
A lot of time was spent fitting the lines through the forward floorboards and getting everything bent just right so as not to have any low spots. Rubber grommets were used to secure the lines going through door formers. Adel clamps were used to secure the lines. Leak test was good with a measured line on the ballon for 4-5 hours with no shrinkage
 
22     Dec 02, 2021 Fuel Lines Fuel System 7 $0.00    8   
Fuel lines were all run and ready for final trim and flaring
 
21     Dec 02, 2021 Rudder installation Tail Feathers 3 $0.00    0   
The rudder to a bit of sanding and as you can see some primer to protect the sanded areas. I had to sand in order to get the top attach point to slide up to mate the the vertical stabilizer
 
20     Dec 02, 2021 Rudder Pedal Installation Controls 3 $0.00    1   
There was a lot or measuring and clamping and then repeating the measuring and clamping prior to drilling. One concern was that I do not have my toe brake cylinders for the fitting. In the end I was very happy with the result.
 
19     Dec 02, 2021 Right rear line Fuel System 4 $0.00    5   
I am using the 5052 lines, so a lot to do to bend them. I was very nervous about the fuel lines and kept putting it off and working on other things. It was not that difficult the bending was done only after lots of measuring and remeasuring. In the end it was pretty easy.
 
18     Dec 02, 2021 Tube for Rudder Cables Controls 1 $0.00    1   
I installed a clear tube for the rudder cables in the baggage area so baggage will never bind the cable movement
 
17     Dec 02, 2021 Correcting mistakes Fuel System 4 $0.00    4   
So after realizing my mistake, it was all about drilling out rivets and then installing a system for the fuel selector and stand so it is removable and serviceable.
 
16     Dec 02, 2021 Fuel Selector and Gascolator Fuel System 5 $0.00    0   
Total mess up that had to be corrected. It was really nicely done and engineered… Except the stand for the fuel selector can't be riveted in, and it needs the floor under it.
 
15     Dec 02, 2021 Door Formers Fuselage 5 $0.00    5   
Drilled out the temporary rivets and removed the door formers. Drilled the tabs and them match drilled the tab holes to the formers. Countersunk the holes for flush riveting. Installed the formers with clecos and then riveted them in. There were some tight fits for the bucking bar, but I managed to get them all in. There were some that were drilled out and re-riveted to make them perfectly flush
 
14     Dec 02, 2021 Bottom Stringers Fuselage 4 $0.00    2   
The bottom stringers require bending so as to allow the fabric to transition to the tail without an edge.
 
13     Dec 02, 2021 Trim system Controls 8 $0.00    6   
The installation of the trim system was a slow process and there was a lot of fitting to do after cutting the trim tabs out of the horizontal stabilizer. The torque tube fitting (cutting to length) and installation was a slow process as the left and right horizontal stabilizers had to go on and off many times, too many to count. Then the torque tube bushings had to be measured, cut, trimmed, filed, debarred, fit, filed, deburred and so on. It was a really long process, but in the end it was a perfect fit with the trim horn offset to the left perfectly to allow for clearance of the elevator cables.
 
12     Dec 02, 2021 Trim Wheel Controls 1 $0.00    0   
Very straight forward and easy installation
 
11     Dec 02, 2021 Stringers Pt. 1 Fuselage 4 $0.00    3   
Rough cut to lengths then fit and trimmed to perfect length. Lots of filing and sanding of the ends to make sure nothing has a chart edge. No holes drilled yet, just all fitting and then clamping in place
 
10     Dec 02, 2021 Setting the Angle of the Horizontal Tail Feathers 7 $0.00    4   
OK, this took me days, I would work on it and get frustrated then comeback to it after working on other things. In the end it was a combination of a water level, two digital levels and a LOT of trigonometry. NOTE: Trig works
 
9     Dec 02, 2021 Leveling the fuselage Tail Feathers 2 $0.00    4   
This was initially a massive task. Do not do what I did and try to level the fuselage with digital levels. After some frustration I called Mark and he educated me on a water level. WOW what a difference. Fuselage all leveled so I can start working on the horizontal stabilizer
 
8     Dec 02, 2021 Control Stick assembly and installation Controls 4 $0.00    2   
Control stick was clamped into place several times and lined up with the aileron cable pulley to try to have the straightest and most efficient line. I am using parachute cord to mock up my cable lines
 
7     Dec 02, 2021 Flap Controls Controls 4 $0.00    2   
The flap north has guide required a fair amount of work so the flap handle locked in each notch fully and securely. It was slow going as I did not want to go beyond a perfect fit for each notch. The actual flap handle installation was not difficult
 
6     Dec 02, 2021 Seat Adjustment mechanism Fuselage 5 $0.00    3   
This was a long arduous process of drilling the holes for the seat adjustment. There was a lot of measuring and re-measuring in the seat frame bottoms. The actuating arm which holds the seats required a bit of fitting as well
 
5     Dec 02, 2021 Window Fuselage 3 $0.00    1   
The window frames came nicely drilled for the attach points, Drilled the tabs and cleco'ed in the windows temporarily. October 1
 
4     Dec 02, 2021 Strut Assembly Landing Gear 2 $0.00    1   
Strut required a fair amount of cleaning on the inside prior to the spring installation. The process of compressing the spring to allow the installation of the snap ring was a challenge, should be easier for the 2nd one. Have to wait for the 2nd spring to arrive as it is backordered
 
3     Dec 02, 2021 Built workbench and arranged drill and grinding wheel Workshop 2 $0.00    1   
 
2     Dec 02, 2021 Delivery Fuselage 5 $0.00    2   
Taking delivery required a few people out offload things and get everything Stowe din the hanger. Fuselage was put on sawhorses to protect the bottom stringer attach points. Several hours were spent removing plastic and bubble wrap
 
1     Dec 02, 2021 TailWheel Landing Gear 1 $0.00    1   
Installation of the tailwheel, fairly easy, put the fuselage on sawhorses are it was pretty much a bolt on
  ------------ -------------- ------------- Totals1317.5    $0.00    1142   




NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.