Project: RV-6A     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours # Pictures
35     May 10, 2024 Enlarged holes in wing ribs for wiring conduit Wings 3 5   
34     Apr 29, 2024 Made and installed new bellcrank brackets on R wing Wings 4 5   
33     Mar 09, 2024 Removed incorrect bellcrank mount Wings 2.5 0   
32     Mar 09, 2024 RV-Ator Research 3 0   
31     Mar 03, 2024 Finished removing top skin rivets Wings 2 0   
30     Mar 02, 2024 Received Finish Kit Fuselage 3 16   
29     Mar 02, 2024 Assembled some “free” shelves! Workshop 3 3   
28     Feb 17, 2024 Removed outboard R wing top skin Wings 4 4   
27     Feb 11, 2024 Removed inner R wing top skin Wings 6 6   
26     Jan 28, 2024 Inspect fuselage rivet quality, study plans and build manual Fuselage 3 0   
25     Jan 21, 2024 Inspected right wing Wings 6 32   
24     Jan 21, 2024 Received partial firewall forward kit General 2 1   
23     Jan 01, 2024 Remove Aileron, Flap, and Fuel tank from Right Wing Wings 2.5 8   
22     Dec 31, 2023 Removed Flap Lever Controls 2 3   
21     Dec 31, 2023 Moved project to a hangar General 6 9   
20     May 15, 2022 Joined EAA Chapter 292 General 1   
19     May 04, 2022 Getting back into it. Ordered new front deck piece General 2 0   
18     Apr 10, 2022 Moved airplane to new house General 6 12   
17     Jan 30, 2022 Updates! General 3 5   
16     Dec 25, 2021 Found some ebay deals on a couple parts. Avionics 1 0   
15     Dec 25, 2021 Changed desiccant, found missing case bolt. Engine .5 0   
14     Dec 25, 2021 Inspected left wing. Wings 2 6   
13     Dec 25, 2021 Front deck Fuselage 2 6   
12     Dec 25, 2021 Christmas time shopping! Tools 4 1   
11     Dec 19, 2021 Ordered a bunch of tools Tools 2 0   
10     Dec 17, 2021 Identified sheet metal components, assembled forward deck Fuselage 3 3   
9     Dec 17, 2021 Ordered the firewall forward kit. Logistics 3 0   
8     Dec 14, 2021 Visited Van's, ordered finishing kit Logistics 1 1   
7     Dec 12, 2021 Moved Fuselage, Wings, and Engine Logistics 6 7   
6     Dec 11, 2021 Brought home the empennage Logistics 2 2   
5     Dec 08, 2021 Organized small parts Workshop 2 7   
4     Dec 07, 2021 Brought home the first set of parts Logistics 2 0   
3     Dec 05, 2021 Clean and prepare the workshop Workshop 6 1   
2     Dec 05, 2021 Cleaning and organizing the workshop, getting ready to move the project in. Workshop 4 0   
1     Dec 04, 2021 Project Start Research 2 9   
------------ -------------
Totals105.5    153   