EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Summary
Hours
Entries
Expenses
Dtl. Expenses
Flight Time
Viewers
Categories
Project:
RV-6A
- Project Summary
- Optional PDF document function
Add entry descriptions
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
# Pictures
35
May 10, 2024
Enlarged holes in wing ribs for wiring conduit
Wings
3
5
34
Apr 29, 2024
Made and installed new bellcrank brackets on R wing
Wings
4
5
33
Mar 09, 2024
Removed incorrect bellcrank mount
Wings
2.5
0
32
Mar 09, 2024
RV-Ator
Research
3
0
31
Mar 03, 2024
Finished removing top skin rivets
Wings
2
0
30
Mar 02, 2024
Received Finish Kit
Fuselage
3
16
29
Mar 02, 2024
Assembled some “free” shelves!
Workshop
3
3
28
Feb 17, 2024
Removed outboard R wing top skin
Wings
4
4
27
Feb 11, 2024
Removed inner R wing top skin
Wings
6
6
26
Jan 28, 2024
Inspect fuselage rivet quality, study plans and build manual
Fuselage
3
0
25
Jan 21, 2024
Inspected right wing
Wings
6
32
24
Jan 21, 2024
Received partial firewall forward kit
General
2
1
23
Jan 01, 2024
Remove Aileron, Flap, and Fuel tank from Right Wing
Wings
2.5
8
22
Dec 31, 2023
Removed Flap Lever
Controls
2
3
21
Dec 31, 2023
Moved project to a hangar
General
6
9
20
May 15, 2022
Joined EAA Chapter 292
General
1
19
May 04, 2022
Getting back into it. Ordered new front deck piece
General
2
0
18
Apr 10, 2022
Moved airplane to new house
General
6
12
17
Jan 30, 2022
Updates!
General
3
5
16
Dec 25, 2021
Found some ebay deals on a couple parts.
Avionics
1
0
15
Dec 25, 2021
Changed desiccant, found missing case bolt.
Engine
.5
0
14
Dec 25, 2021
Inspected left wing.
Wings
2
6
13
Dec 25, 2021
Front deck
Fuselage
2
6
12
Dec 25, 2021
Christmas time shopping!
Tools
4
1
11
Dec 19, 2021
Ordered a bunch of tools
Tools
2
0
10
Dec 17, 2021
Identified sheet metal components, assembled forward deck
Fuselage
3
3
9
Dec 17, 2021
Ordered the firewall forward kit.
Logistics
3
0
8
Dec 14, 2021
Visited Van's, ordered finishing kit
Logistics
1
1
7
Dec 12, 2021
Moved Fuselage, Wings, and Engine
Logistics
6
7
6
Dec 11, 2021
Brought home the empennage
Logistics
2
2
5
Dec 08, 2021
Organized small parts
Workshop
2
7
4
Dec 07, 2021
Brought home the first set of parts
Logistics
2
0
3
Dec 05, 2021
Clean and prepare the workshop
Workshop
6
1
2
Dec 05, 2021
Cleaning and organizing the workshop, getting ready to move the project in.
Workshop
4
0
1
Dec 04, 2021
Project Start
Research
2
9
------------
-------------
Totals
105.5
153
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.