186     Feb 19, 2024 Final prep of wings ready for covering tasks. Wings 1 6   
185     Feb 19, 2024 Elevator Trim Rod cutout Tail Feathers 1 1   
184     Feb 04, 2024 Finalized instrument panel design Instrument Panel 4 3   
183     Jan 31, 2024 Nearly finalized instrument panel design Instrument Panel 5 2   
182     Jan 27, 2024 Aileron Bellcrank cover fabrication Tail Feathers 2 2   
181     Jan 27, 2024 Panel Concept Instrument Panel 6 1   
180     Jan 21, 2024 Completed fabrication of elevator trim tabs. Tail Feathers 3   
179     Jan 14, 2024 Completed installation and priming of bellcrank access cover mount. Wings 2 4   
178     Jan 14, 2024 Continued fabrication and installation of bellcrank access panel. Wings 3   
177     Jan 14, 2024 Design and layout of bell crank access panel. Wings 3   
176     Jan 14, 2024 Added ADAHRS wiring grommets and wiring to wings prior to cover. Avionics 1 2   
175     Jan 14, 2024 Added lighting wiring grommets and wiring to wings prior to cover. Lighting 2 1   
174     Jan 14, 2024 Alignment tool and angle installation for ADAHRS unit shelf. Avionics 5 8   
173     Jan 13, 2024 Aileron Push Pull Tube Guide Positioning and Installation. Wings 2 5   
172     Jan 07, 2024 Continued fabrication and installation of bellcrank access panel. Wings 2 2   
171     Dec 02, 2023 Fabrication, positioning, and installation of wing avionics bay access panel. Lighting 5 3   
170     Nov 19, 2023 Filled, sanded, and primed tip light mounts Lighting 3 4   
169     Nov 17, 2023 Installed tip light mounts. Added micro balloon slurry. Lighting 2 3   
168     Nov 11, 2023 Completed fabrication and positioning of tip light mounts. Lighting 3 8   
167     Nov 08, 2023 Painted Taxi and Landing Light Bays Lighting 2 3   
166     Oct 18, 2023 Wing fabric braces fabrication and installation Wings 4 11   
165     Oct 18, 2023 Aileron Tunnel forming after install, continued. Wings 3 6   
164     Oct 10, 2023 Aileron Trailing Edge Fitting Wings 2 1   
163     Oct 08, 2023 Complete Landing Light opening mounts Lighting 2 2   
162     Oct 08, 2023 Aileron Stabilizer Tabs Fab and Install Wings 4 2   
161     Oct 01, 2023 TE Installation Wings 2 3   
160     Sep 24, 2023 Aileron Trailing Edge fitting and forming. Wings 6 1   
159     Sep 09, 2023 Build Wing Stand Workshop 8 0   
158     Sep 08, 2023 Trailing edge initial fitting continued Wings 1 1   
157     Sep 07, 2023 Aileron Tip Tunnel install and trailing edge initial fitting Wings 3 3   
156     Sep 07, 2023 Completion of right aileron tunnel. Wings 3 2   
155     Sep 05, 2023 Aileron Tunnel Tip, Right installation Wings 1 1   
154     Sep 05, 2023 Right aileron tunnel - final positioning Wings 2 1   
153     Sep 04, 2023 Left aileron tunnel, alternate web attachment. Wings 3 6   
152     Sep 03, 2023 Aileron Tunnel forming after install Wings 4 6   
151     Sep 03, 2023 Left Left aileron tunnel, initial positioning completion, and work on installation and alternate web attachment. Wings 4 7   
150     Sep 02, 2023 Aileron Tip Tunnel Fitting Wings 2 2   
149     Sep 02, 2023 Left Left aileron tunnel, initial positioning. Wings 2 2   
148     Aug 17, 2023 Wingtip Light 3D Printing and Test Mount (Geom Check) Lighting 2 2   
147     Aug 17, 2023 Navigation, Position, and Strobe Light mount 3D Print & Test Fit. Lighting 3 2   
146     Aug 15, 2023 Navigation, Position, and Strobe Light mount design. Lighting 6 2   
145     Aug 08, 2023 Aileron Tunnel Fitting Continued Wings 1 0   
144     Jul 15, 2023 Landing light openings cut and finished. Lighting 4 2   
143     Jul 10, 2023 Wing LE Skin prep completion and installation. Wings 6 5   
142     Jul 06, 2023 Elevator Trim Tab and control horn fabrication. Tail Feathers 4 4   
141     Jul 05, 2023 Leading Edge Prep. Wings 3 1   
140     Jul 05, 2023 Leading edge landing light cutout layout. Lighting 2 2   
139     Jul 04, 2023 Landing light mounts - completion and installation Lighting 6 7   
138     Jul 03, 2023 Landing light mounts, fabrication and install. Lighting 7 10   
137     Jul 02, 2023 Landing Light Mount Fabrication. Lighting 7 4   
136     Jul 01, 2023 Elevator Trim Tab Completion, Tail Feathers 5 4   
135     Jul 01, 2023 Landing Light Mounts - fabrication and layout. Lighting 6 6   
134     Jun 22, 2023 Elevator Trim Tab Fabrication. Tail Feathers 4 3   
133     Jun 21, 2023 Elevator Trim Tab Hinge Layout modification and fabrication. Tail Feathers 2 2   
132     Jun 20, 2023 Trim Tab Elevator Channel Prep. Tail Feathers 2 1   
131     Jun 14, 2023 Fabricating rudder and elevator gap seal strips. Wings 2 3   
130     Jun 08, 2023 LH Aileron tip leading edge riveting Wings 2 1   
129     Jun 07, 2023 LH Aileron tip leading edge alignment. Wings 4 4   
128     Jun 06, 2023 RH Aileron tip leading edge alignment and riveting Wings 6 5   
127     Jun 04, 2023 LH Aileron alignment Wings 2 1   
126     Jun 01, 2023 Landing Light Design, CAD. Lighting 20 1   
125     May 29, 2023 Primary aileron construction completed Wings 2 1   
124     May 21, 2023 RH Aileron Skin and Riveting Wings 8 10   
123     May 21, 2023 Aileron Skin Initial Install Wings 6 10   
122     May 20, 2023 Riveted RH Aileron Frame Wings 2 1   
121     May 15, 2023 Aileron Frame Assembly Wings 5 4   
120     May 15, 2023 Aileron parts prep Wings 2 2   
119     May 15, 2023 Aileron Hinge Bracket Machining and Finishing Wings 2 5   
118     May 13, 2023 Aileron part prep with Beki Parks Wings 3 2   
117     May 13, 2023 Aileron Hinge Bracket Machining Wings 4 3   
116     May 07, 2023 Aileron Part Layout Wings 2 2   
115     May 06, 2023 Wingtip Leading Edge Installation Wings 1 4   
114     May 06, 2023 Kit Options Media 1   
113     May 04, 2023 Windtip Handhold Insert Wings 2 3   
112     May 03, 2023 Windtip Handhold Insert Wings 2 3   
111     Apr 29, 2023 Aileron Tunnel Fitting continued Wings 1 2   
110     Apr 26, 2023 Wingtip Final Assembly Wings 3 5   
109     Apr 25, 2023 Wingtip Final Assembly Wings 2 2   
108     Apr 23, 2023 Aileron Tunnel - Initial fitting and forming Wings 2 9   
107     Apr 23, 2023 Leading edge and wingtip bow fitting Wings 5   
106     Apr 21, 2023 Begin leading edge and wingtip bow fitting Wings 2 2   
105     Apr 21, 2023 Completed Leading Edge Skin Fabrication Wings 1 1   
104     Apr 20, 2023 Leading Edge Skin Fabrication Wings 2 2   
103     Apr 19, 2023 Leading Edge Skin Fabrication Wings 3 4   
102     Apr 17, 2023 Leading Edge Skin Fabrication Wings 1 2   
101     Apr 16, 2023 Leading Edge Skin Fabrication Wings 4 5   
100     Apr 15, 2023 Begin Leading Edge Skin Fabrication Wings 2 1   
99     Apr 15, 2023 Drag Truss Construction Continued Wings 4 4   
98     Apr 14, 2023 Fitting tip ribs Wings 3 2   
97     Apr 04, 2023 Wing tip taper Wings 2 2   
96     Apr 01, 2023 Wing tip taper Wings 3 4   
95     Mar 31, 2023 Wing tip taper Wings 2 2   
94     Mar 30, 2023 Wing tip taper Wings 2 2   
93     Mar 26, 2023 Wing tip taper Wings 3 5   
92     Feb 19, 2023 Inboard Drag Truss Tube, Assembly, Exterior Priming, Installation Wings 5 2   
91     Feb 17, 2023 Drag Truss Sleeve Corrosion Resistance - Boiled Linseed Oil Wings 2 1   
90     Feb 12, 2023 Begin Drag Truss Fabrication Wings 4 2   
89     Feb 05, 2023 Begin Drag Truss End Fabrication Wings 2 1   
88     Jan 31, 2023 Bellcrank Mount Fabrication Wings 5 4   
87     Jan 29, 2023 Bellcrank Fabrication Wings 4 3   
86     Jan 28, 2023 Sam Garcia, EAA 512 Ray Scholar working on Right Wing Final Assembly Continued Wings 6 3   
85     Jan 25, 2023 Right Wing Final Assembly Continued Wings 10 7   
84     Jan 22, 2023 Zane Ruckman helping with right wing final assembly. Wings 6 1   
83     Jan 19, 2023 Riveted aileron hangars, fabricated and installed drag truss brackets. Primed all. Wings 11 6   
82     Jan 12, 2023 Location, drilling and riveting of aileron hangars. Wings 3 1   
81     Jan 11, 2023 Design and fabrication of aileron hangar placement fixture. Wings 2 4   
80     Jan 10, 2023 Primed, repositioned, and riveted ribs. Wings 3 5   
79     Jan 08, 2023 Riveted center aileron hanger to rear spar. Layout and fabrication of aileron push pull tube clearance on rib brackets. Wings 4.9 2   
78     Jan 07, 2023 Disassembly of ribs from spars. Position and drilling of center aileron hanger. Wings 3 1   
77     Jan 02, 2023 Completed rib positioning and drilling onto rib brackets wing. Wings 5 2   
76     Jan 01, 2023 Fabrication of spar spacing jigs. Drill and cleco ribs to brackets, special rib bracket modification. Wings 9 6   
75     Dec 31, 2022 Complete initial positioning of ribs. Wings 2 1   
74     Dec 30, 2022 Initial positioning of rib onto spars and rib brackets. Wings 10 5   
73     Dec 28, 2022 Wing spar positioning and fixture design, fabrication, and installation. Wings 9 4   
72     Nov 13, 2022 Wing attach plate bolts install and torque. Wings 2 2   
71     Nov 06, 2022 Spar priming and rib bracket drilling continued. Wings 6 4   
70     Sep 27, 2022 Rib Bracket cutting, layout, positioning drilling. Wings 8 4   
69     Sep 21, 2022 Wingtip layout and machine-out. Wings 4 3   
68     Sep 18, 2022 Spar attach and lug bracket layout, drilling, reaming. Wingtip machine-out. Wings 10 3   
67     Sep 05, 2022 Lug double plate riveting Wings 1 1   
66     Sep 05, 2022 Milling wing spar web at tips Wings 3 4   
65     Aug 30, 2022 Aileron hangar brackets continued Wings 4 1   
64     Aug 28, 2022 Wing rib bracket blank cuts Wings 2 1   
63     Aug 26, 2022 Wing spar tip layout and cutting Wings 2 2   
62     Aug 23, 2022 Wing spar lug plate assembly Wings 2 0   
61     Aug 22, 2022 Wing spar lug plate assembly Wings 5 4   
60     Aug 21, 2022 Wing spar lug plate assembly Wings 5 2   
59     Aug 21, 2022 Wing spar lug plate assembly Wings 6 2   
58     Aug 17, 2022 Wing spar attach end plate assembly continued Wings 4 2   
57     Aug 15, 2022 Wing spar attach end plate assembly continued Wings 3 1   
56     Aug 14, 2022 Wing spar attach end plate assembly Wings 4 3   
55     Aug 13, 2022 Rib Prep - Capstrip Bonding Wings 3 2   
54     Aug 07, 2022 Wing Rib Prep & Aileron Bracket Initial fabrication Wings 6 9   
53     Aug 06, 2022 Trim Tab Construction Tail Feathers 8 14   
52     Jul 10, 2022 Table connect for wing Workshop 0 2   
51     Jul 09, 2022 Elevator Construction Tail Feathers 4 1   
50     Jul 07, 2022 Elevator Construction Tail Feathers 2 1   
49     Jul 07, 2022 Elevator Construction Tail Feathers 2 1   
48     Jul 05, 2022 Horizontal Stabilizer Hinge Alignment Tail Feathers 3 5   
47     Jul 03, 2022 Elevator construction Tail Feathers 4 5   
46     Jun 19, 2022 Horizontal Stabilizer Final Assembly Tail Feathers 3 1   
45     Jun 18, 2022 Horizontal Stabilizer Final Assembly Tail Feathers 5 4   
44     Jun 15, 2022 Horizontal Stabilizer - Debur, part cleanup, reassembly, riveting Tail Feathers 9 6   
43     Jun 15, 2022 Horizontal Stabilizer & Elevator Spar Tip forming, fitting fabrication, fitting Tail Feathers 10 1   
42     Jun 10, 2022 Horizontal Stabilizer - Fitting continued and jigging Tail Feathers 3 3   
41     Jun 08, 2022 Horizontal Stabilizer - Initial fitting continued. Tail Feathers 1   
40     Jun 06, 2022 Horizontal Stabilizer - Initial fitting continued Tail Feathers 2 1   
39     Jun 01, 2022 Horizontal Stabilizer - Initial fitting Tail Feathers 2 1   
38     Jun 01, 2022 Rudder final riveting and assembly Tail Feathers 3 7   
37     Jun 01, 2022 Leon adjusting vstab and rudder ribs Tail Feathers 1 0   
36     Jun 01, 2022 More wing parts - Inventory Wings 0 1   
35     May 29, 2022 Vstab assembly and riveting Tail Feathers 4 7   
34     May 28, 2022 Vstab fitting and assembly Tail Feathers 2 3   
33     May 26, 2022 Vstab parts fitting Tail Feathers 2 1   
32     May 24, 2022 Vstab and rudder fit Tail Feathers 2 2   
31     May 23, 2022 Vstab LE fit Tail Feathers 2 0   
30     May 22, 2022 Invoice for flying surfaces, tailwheel, wheels, brakes, crating, shipping. Finances 1   
29     May 22, 2022 More layout on Vstab and rudder Tail Feathers 5 4   
28     May 21, 2022 Vstab and Rudder, spar compression and forming Tail Feathers 5 27   
27     May 19, 2022 Vstab Spar splice Tail Feathers 1 2   
26     May 19, 2022 Vertical and Rudder layout Tail Feathers 2 3   
25     May 17, 2022 Kit Crate Arrive, Wing and Tail Kits Kit 7   
24     May 11, 2022 Wing Rib deburr and cleanup Wings 6 3   
23     May 08, 2022 Sport Aviation March 2022 Media 1   
22     May 07, 2022 Lightening hole debur and wire route hole drilling. Wings 5 2   
21     Apr 11, 2022 ST-L Wing Kit inventory Kit 0 1   
20     Apr 03, 2022 Vertical stabilizer and rudder layout. Tail Feathers 2 2   
19     Mar 28, 2022 Table square-up Workshop 0 1   
18     Jan 05, 2022 Cowl and Engine Mount Design CAD 14   
17     Jan 05, 2022 Prototype Construction Prototype 35   
16     Jan 05, 2022 CAD Overview CAD 16   
15     Jan 05, 2022 Landing Gear Design CAD 3   
14     Jan 05, 2022 Prototype Flying - Glenn Gordon, pilot Flying Pics 29   
13     Jan 05, 2022 Prototype Flying - Brooks Mershon, pilot Flying Pics 13   
12     Jan 05, 2022 Tooling from CAD Tooling 37   
11     Jan 05, 2022 Marketing stuff Media 2   
10     Jan 01, 2022 Flyer Magazine (UK) Media 1   
9     Jan 01, 2022 Weight and Balance Calculator W&B 1   
8     Jan 01, 2022 Work Tables Workshop 1   
7     Jan 01, 2022 Kitplane Magazine Cover Media 0 2   
6     Dec 15, 2021 Introduction Research 0 1   
5     Dec 03, 2021 Flying Wires Finances 1   
4     Sep 03, 2021 Wing Spars Finances 1   
3     Aug 01, 2021 AirVenture 2021 AirVenture 5   
2     Dec 31, 1969 Rudder Fairing platenut install. Tail Feathers 2 1   
1     Dec 31, 1969 Elevator trim tab positioning, Rudder Fairing platenut install. Tail Feathers 4 6   
------------ -------------
Totals583.9    710   