Project: ecadorette     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
89     May 02, 2024 Rotax Engine Training Engine $0.00    4   
88     Apr 16, 2024 Aerospace Systems Fuel boost system Fuel System $0.00    12   
87     Apr 09, 2024 Wheel Spats and Fairings Fuselage $0.00    13   
86     Mar 23, 2024 Pitot/ VPX/ Wires Avionics $0.00    4   
85     Mar 15, 2024 Doors, Hot air tube, wires Avionics $0.00    17   
84     Feb 27, 2024 Ground Bus, Door latches, Control stick connectors Fuselage $0.00    11   
83     Feb 19, 2024 VPX wiring Avionics $0.00    11   
82     Feb 11, 2024 Cleaning up some wires and the dash Avionics $0.00    8   
81     Feb 02, 2024 Center console, rear seat fix Fuselage $0.00    9   
80     Jan 27, 2024 Floor rib fixed, floors installed, rear seat doesnt fit Fuselage $0.00    9   
79     Jan 19, 2024 wing root CPC repinned Fuselage $0.00    6   
78     Jan 11, 2024 Finishing up loose odds and ends Fuselage $0.00    7   
77     Dec 27, 2023 A little bit of a lot Fuselage $0.00    20   
76     Nov 19, 2023 Windows in, 1 wing on Fuselage $0.00    10   
75     Nov 12, 2023 Windows Fuselage $0.00    5   
74     Oct 19, 2023 Fwd Door latches, Priming, and some odds and ends Fuselage $0.00    7   
73     Oct 11, 2023 Vent Ducts, Door Locks, Interior Lights, Inside side skins Fuselage $0.00    19   
72     Sep 30, 2023 Brake Lines, lower fiberglass skin, door latch work Fuselage $0.00    12   
71     Sep 24, 2023 More door problems Fuselage $0.00    0   
70     Sep 15, 2023 Audio all wired up Avionics $0.00    5   
69     Sep 08, 2023 Total Temp probe, panel wiring started, GA-57 installed Avionics $0.00    7   
68     Sep 01, 2023 Wing root CPC connectors, brake lines, panel rendering Avionics $0.00    10   
67     Aug 26, 2023 Wiring, Brake lines Avionics $0.00    10   
66     Aug 26, 2023 Right door Fuselage $0.00    10   
65     Aug 26, 2023 Left door Fuselage $0.00    23   
64     Aug 16, 2023 Door Latches Fuselage $0.00    16   
63     Aug 16, 2023 Avionics tray, Pitot static, GPS Avionics $0.00    9   
62     Jul 27, 2023 Finishing up ailerons, flaps and controls Controls $0.00    8   
61     Jul 13, 2023 Canopy Install Fuselage $0.00    15   
60     Jul 08, 2023 Cleaning up loose ends Fuselage $0.00    8   
59     Jul 07, 2023 Ailerons Wings $0.00    3   
58     Jul 03, 2023 Undercarraige/ Canopy/ Finishing kit arrive Landing Gear $0.00    15   
57     Jun 30, 2023 Firewall Pass Thru/ Filling rivets Fuselage $0.00    3   
56     Jun 25, 2023 Wint tip lights and wing tip instalation Wings $0.00    14   
55     Jun 01, 2023 Rear Upper skins Fuselage $0.00    8   
54     Jun 01, 2023 Clamping the fuel lines in Fuel System $0.00    8   
53     Jun 01, 2023 ELT, Pitch servo, more wires Avionics $0.00    5   
52     May 12, 2023 Long range tank pumps Fuel System $0.00    2   
51     May 12, 2023 Various fusalage tasks Fuselage $0.00    15   
50     May 12, 2023 Started wiring up aft fuselage Avionics $0.00    5   
49     Apr 19, 2023 Seats, Rivnuts, Sound insulation Fuselage $0.00    30   
48     Apr 06, 2023 Side skins and firewall attached Fuselage $0.00    20   
47     Mar 15, 2023 Center Fuselage Fuselage $0.00    23   
46     Feb 16, 2023 Center Fuselage Fuselage $0.00    20   
45     Feb 07, 2023 More part prep and connected aft to center fuselage Fuselage $0.00    7   
44     Feb 01, 2023 Part prep Fuselage $0.00    5   
43     Jan 27, 2023 Center fuselage skeleton and floor Fuselage $0.00    9   
42     Jan 19, 2023 Center fuselage skeleton start Fuselage $0.00    4   
41     Jan 16, 2023 Rear Fuselage Baggage floor Fuselage $0.00    10   
40     Dec 21, 2022 Left Wing and Tank done, Fuselage started Fuel System $0.00    15   
39     Dec 09, 2022 Left Wing Aux Tank Install Fuel System $0.00    13   
38     Dec 06, 2022 Rear Fuselage Priming Fuselage $0.00    15   
37     Nov 21, 2022 Fusalage kit arrived Fuselage $0.00    7   
36     Oct 28, 2022 Right wing wingtip install and Left wing pitot wireing Wings $0.00    6   
35     Oct 25, 2022 Rt Main fuel tank install, Lt Main tank leak test Fuel System $0.00    8   
34     Oct 24, 2022 Rt wing top skin Wings $0.00    6   
33     Oct 23, 2022 All fuel tanks Fuel System $0.00    17   
32     Oct 23, 2022 Pitot install Avionics $0.00    6   
31     Oct 17, 2022 2nd EAA Tech Counselor visit Inspection $0.00    1   
30     Oct 16, 2022 Rt Main fuel tank complete Fuel System $0.00    15   
29     Oct 08, 2022 Fuel tank senders and lights/ first part destroyed Fuel System $0.00    8   
28     Oct 01, 2022 Left Wing tanks Fuel System $0.00    18   
27     Sep 25, 2022 Left wing and fuel tanks Wings $0.00    11   
26     Sep 12, 2022 Flaps Controls $0.00    3   
25     Sep 11, 2022 A little bit on wings, wiring, and fuel seals Wings $0.00    13   
24     Sep 02, 2022 Back to building Fuel System $0.00    5   
23     May 08, 2022 Fiberglass tip for vertical stab Empennage $0.00    6   
22     Apr 25, 2022 Extened and Main fuel tank right wing Fuel System $0.00    5   
21     Apr 24, 2022 Right Main wing Fuel System $0.00    7   
20     Apr 17, 2022 Extened and Main fuel tank right wing Fuel System $0.00    12   
19     Apr 03, 2022 Right Wing bottom skins Wings $0.00    3   
18     Apr 03, 2022 Alodine main fuel tanks. Fuel System $0.00    0   
17     Mar 27, 2022 Fuel tanks Fuel System $0.00    4   
16     Mar 13, 2022 Left Wing Ribs and fuel tank prep Wings $0.00    3   
15     Mar 05, 2022 Left Wing ribs Empennage $0.00    2   
14     Feb 27, 2022 Vertical stab finished Empennage $0.00    5   
13     Feb 26, 2022 HS tip skins Empennage $0.00    6   
12     Feb 21, 2022 Backordered part arrived. Empennage $0.00    3   
11     Feb 21, 2022 Ribs attached to spar Wings $0.00    3   
10     Feb 07, 2022 More rib work Wings $0.00    4   
9     Jan 30, 2022 Wing rib prep Wings $0.00    1   
8     Jan 23, 2022 Vertical Stab work started Empennage $0.00    7   
7     Jan 17, 2022 Jan 17 Empennage $0.00    6   
6     Jan 17, 2022 Jan 9th Empennage $0.00    4   
5     Jan 17, 2022 Jan 2 Empennage $0.00    2   
4     Jan 17, 2022 Jan 1 Empennage $0.00    3   
3     Jan 17, 2022 Nov 21 Empennage $0.00    5   
2     Jan 17, 2022 Kits almost here, shop prep. Workshop $0.00    1   
1     Jan 17, 2022 Tools Research $0.00    1   
------------ -------------- -------------
Totals0    $0.00    771   