EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Summary
Hours
Entries
Expenses
Dtl. Expenses
Flight Time
Viewers
Categories
Project:
BattenWaiex
- Project Summary
- Optional PDF document function
Add entry descriptions
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
Cost
# Pictures
166
May 24, 2024
Aligning the Ram Air Ducts with the Cowl
Cowl
8
$0.00
3
165
May 14, 2024
Time to break for some cleaning
Workshop
1
$0.00
2
164
May 10, 2024
Fitting the Ram Air Ducts
Cowl
2
$0.00
2
163
May 05, 2024
Ram Air Cooling Ducts
Engine
3
$0.00
5
162
May 02, 2024
Matching the Upper and Lower Cowl split lines
Cowl
3
$0.00
1
161
Apr 30, 2024
Upper Cowl Cleco'd
Cowl
3
$0.00
2
160
Apr 28, 2024
Wear Tabs
Cowl
2
$0.00
2
159
Apr 28, 2024
Oil cooler tunnel gaskets
Engine
3
$0.00
5
158
Apr 28, 2024
Wear Tabs Installed
Cowl
2
$0.00
2
157
Apr 05, 2024
Fitting the Upper Cowl
Cowl
8
$0.00
1
156
Mar 25, 2024
More modifications to the lower cowl
Cowl
2
$0.00
5
155
Mar 22, 2024
Epoxy with Micro-balloons
Cowl
2
$0.00
2
154
Mar 22, 2024
Exhaust Tunnels
Cowl
1
$0.00
2
153
Mar 21, 2024
Lower Cowl
Cowl
8
$0.00
4
152
Mar 11, 2024
Flap Switch Resistor Matrix
Instrument Panel
2
$0.00
1
151
Mar 09, 2024
Upper Cowl attachment modification
Cowl
3
$0.00
3
150
Mar 05, 2024
Fitting the Cowl
Cowl
8
$0.00
3
149
Mar 03, 2024
Control Stick Assembly
Controls
4
$0.00
4
148
Feb 22, 2024
IP Labels
Instrument Panel
2
$0.00
3
147
Feb 20, 2024
Improved wire strain relief
Instrument Panel
1
$0.00
1
146
Feb 16, 2024
Flap Position Switch
Electrical
1
$0.00
1
145
Feb 09, 2024
Fuse Blocks Installed
Electrical
1
$0.00
2
144
Feb 09, 2024
NACA Fresh Air Vents Completed
Fuselage
$0.00
1
143
Feb 08, 2024
Finishing the NACA Fresh Air Ducts
Fuselage
3
$0.00
3
142
Feb 08, 2024
Transponder Antenna Mount
Avionics
1
$0.00
2
141
Feb 07, 2024
Rough cut-out for the "NACA Fresh Air Vent"
Fuselage
2
$0.00
1
140
Feb 07, 2024
ADS-B Antenna
Avionics
1
$0.00
1
139
Feb 03, 2024
Fuel Hoses
Fuel System
4
$0.00
2
138
Feb 03, 2024
Throttle and Mixture Cable Firewall Pass-throughs
Engine
1
$0.00
1
137
Feb 03, 2024
Antenna Installations and Doubler Plates
Avionics
4
$0.00
6
136
Jan 29, 2024
Antenna Doubler Plates
Avionics
2
$0.00
1
135
Jan 26, 2024
3M Vinyl applied and Instruments Installed
Instrument Panel
$0.00
2
134
Jan 22, 2024
Toggle Switch Bus Bar
Instrument Panel
2
$0.00
3
133
Jan 21, 2024
Panel Cutouts Complete
Instrument Panel
8
$0.00
1
132
Jan 21, 2024
Final Panel Layout
Instrument Panel
12
$0.00
1
131
Jan 12, 2024
Paper Layout for the IP
Instrument Panel
1
$0.00
1
130
Jan 11, 2024
Hydraulic Hoses
Engine
4
$0.00
3
129
Jan 08, 2024
Ironwood Handle
Interior Finish
1
$0.00
1
128
Jan 08, 2024
Brake Handle
Interior Finish
8
$0.00
5
127
Dec 31, 2023
Wood block for the brake handle
Interior Finish
$0.00
1
126
Dec 29, 2023
Oil Cooler Hose
Engine
3
$0.00
2
125
Dec 10, 2023
Quick Oil Drain
Engine
4
$0.00
2
124
Dec 10, 2023
12 Volt Power Bus in cabin
Electrical
1
$0.00
3
123
Dec 09, 2023
Diode jumper across the Alternator Relay
Electrical
2
$0.00
1
122
Dec 02, 2023
Engine Breather Tube and Oil Separator Installation
Engine
8
$0.00
3
121
Nov 25, 2023
Components mounted to the firewall
Engine
6
$0.00
3
120
Nov 24, 2023
Engine Breather Hose
Engine
1
$0.00
1
119
Oct 06, 2023
3rd Try for the Voltage Regulator
Electrical
2
$0.00
2
118
Oct 04, 2023
Modified Voltage Regulator Mount
Electrical
2
$0.00
1
117
Oct 04, 2023
Voltage Regulator Installed
Electrical
4
$0.00
4
116
Oct 04, 2023
Mapping out the Firewall real estate
Firewall
1
$0.00
2
115
Oct 04, 2023
AeroInjector & Air Filter
Engine
2
$0.00
2
114
Oct 01, 2023
Wing Tips Installed
Wings
10
$0.00
1
113
Sep 28, 2023
Battery Box
Electrical
2
$0.00
1
112
Sep 27, 2023
Wing Tip Lights
Lighting
4
$0.00
3
111
Sep 23, 2023
Installing the wing tip lights onto the wing tips
Wings
24
$0.00
4
110
Sep 15, 2023
Taxi and Landing Light Installed
Lighting
12
$0.00
5
109
Sep 14, 2023
Aiming the Taxi and Landing Lights
Lighting
1
$0.00
4
108
Sep 12, 2023
Tailwheel Pushrod
Landing Gear
2
$0.00
3
107
Sep 09, 2023
Flap and Aileron Hinges Installed
Wings
4
$0.00
1
106
Sep 07, 2023
Wire Labels
Electrical
2
$0.00
1
105
Sep 02, 2023
Mount for the Nav/Pos/Strobe Lights
Wings
4
$0.00
1
104
Sep 02, 2023
Flap and Aileron Hinges
Wings
4
$0.00
1
103
Sep 02, 2023
Customized Battery Box
Firewall
$0.00
1
102
Sep 02, 2023
Tailwheel Pushrod
Landing Gear
6
$0.00
2
101
Aug 29, 2023
Preparing for the wing root seal
Wings
4
$0.00
5
100
Aug 27, 2023
Wiring for the wing lights
Lighting
2
$0.00
2
99
Aug 27, 2023
Pitot Tube Installed
Wings
4
$0.00
1
98
Aug 24, 2023
Wing cutouts for the Landing and Taxi Lights
Lighting
3
$0.00
2
97
Aug 23, 2023
Brake Lines
Landing Gear
3
$0.00
3
96
Aug 21, 2023
Wings on to install the Landing Light, Taxi Light and Nav/Pos/strobe Lights
Lighting
1
$0.00
1
95
Aug 18, 2023
Both aircraft now standing on their own landing gear
Workshop
$0.00
2
94
Aug 18, 2023
Installing the engine
Engine
4
$0.00
6
93
Aug 16, 2023
Wheel ends assembled
Landing Gear
12
$0.00
2
92
Aug 08, 2023
Rudder Pedals Installed
Controls
8
$0.00
1
91
Jul 21, 2023
Gear Legs Installed
Landing Gear
8
$0.00
5
90
Jul 19, 2023
Rudder Peddle Pivot Block
Controls
4
$0.00
1
89
Jul 18, 2023
Brakes
Landing Gear
4
$0.00
2
88
Jul 18, 2023
Cable Fairings
Fuselage
2
$0.00
1
87
Jul 16, 2023
Flaps are complete
Wings
14
$0.00
1
86
Jul 15, 2023
Removeable Instrument Panel
Instrument Panel
6
$0.00
3
85
Jul 14, 2023
Tire and wheel assemblies are complete
Landing Gear
2
$0.00
1
84
Jul 14, 2023
Gold Cube fuel flow sensor
Avionics
$0.00
1
83
Jul 14, 2023
Jabiru engine intake manifold
Engine
$0.00
1
82
Jul 14, 2023
1" Titanium gear legs
Landing Gear
2
$0.00
1
81
Jul 12, 2023
Building the Flaps
Wings
$0.00
1
80
Jul 10, 2023
Cutting the titanium gear legs
Landing Gear
1
$0.00
1
79
Jul 10, 2023
Balancing the Ailerons
Wings
2
$0.00
5
78
Jul 10, 2023
Ailerons Completed
Wings
16
$0.00
1
77
Jul 08, 2023
First Aileron cleco'd
Wings
6
$0.00
1
76
Jul 04, 2023
Aileron Counterbalance Assembly
Wings
8
$0.00
1
75
Jul 01, 2023
Another piano hinge - this time for the ailerons
Fuselage
2
$0.00
1
74
Jul 01, 2023
Tailwheel Installed
Landing Gear
8
$0.00
2
73
Jun 30, 2023
Windscreen and Canopy fitted
Fuselage
15
$0.00
4
72
Jun 29, 2023
James and I building side-by-side
Workshop
$0.00
2
71
Jun 27, 2023
Installing the Windscreen
Fuselage
15
$0.00
2
70
Jun 24, 2023
Removable Instrument Panel
Instrument Panel
4
$0.00
4
69
Jun 24, 2023
Rudder stops
Y-Tail
1
$0.00
1
68
Jun 22, 2023
Top and Bottom Fairing for the Y-Tail
Y-Tail
6
$0.00
3
67
Jun 21, 2023
Tailwheel spring rod
Landing Gear
1
$0.00
1
66
Jun 20, 2023
Assembly complete
Y-Tail
4
$0.00
1
65
Jun 20, 2023
Creative construction
Y-Tail
2
$0.00
1
64
Jun 20, 2023
Rudder Horn Bracket
Y-Tail
2
$0.00
3
63
Jun 18, 2023
Completed the Stabilator Assemblies
Y-Tail
4
$0.00
2
62
Jun 18, 2023
Visit to see Chuck Bennett's Sonex in build
Research
4
$0.00
1
61
Jun 17, 2023
Bolting and riveting the Stabilators
Y-Tail
4
$0.00
3
60
Jun 17, 2023
Locking Hemostat
Tools
$0.00
1
59
Jun 17, 2023
Installing the Stabilators
Y-Tail
2
$0.00
1
58
Jun 17, 2023
Installing the Stabilators
Y-Tail
8
$0.00
3
57
Jun 15, 2023
Stabalator & Ruddervator Assemblies are complete
Y-Tail
20
$0.00
1
56
Jun 11, 2023
All Avionics have arrived
Avionics
$0.00
1
55
Jun 11, 2023
New Drill Bits for the Titanium Legs
Tools
$0.00
1
54
Jun 02, 2023
Engine mount installed
Engine
2
$0.00
2
53
Jun 02, 2023
Rudder Assembly
Y-Tail
12
$0.00
2
52
Jun 01, 2023
Titanium Tail Wheel Support
Controls
4
$0.00
3
51
May 31, 2023
Glare Shield Modification - adding more structure
Fuselage
6
$0.00
5
50
May 30, 2023
Lower piano hinge for the cowling
Firewall
4
$0.00
1
49
May 30, 2023
Drill bit to drill titanium gear legs
Tools
$0.00
1
48
May 29, 2023
Using a cup washer with the tapered pin
Controls
1
$0.00
3
47
May 29, 2023
Dual Stick Option
Fuselage
2
$0.00
2
46
May 29, 2023
Seat Back Installation
Fuselage
8
$0.00
4
45
May 28, 2023
Dual Stick Option
Controls
1
$0.00
3
44
May 21, 2023
Working on the glare shield
Fuselage
2
$0.00
3
43
May 18, 2023
Cable Guide Blocks Installed
Controls
1
$0.00
1
42
May 17, 2023
Y-tail support installed.
Y-Tail
1
$0.00
1
41
May 17, 2023
Guide Blocks for the control cables
Controls
4
$0.00
1
40
May 17, 2023
Mixer installed into the fuselage
Controls
1
$0.00
1
39
May 16, 2023
Mixer Assembly
Controls
24
$0.00
4
38
May 12, 2023
Barely enough room for the rivets
Y-Tail
1
$0.00
2
37
May 11, 2023
Kit Arrives
Inspection
$0.00
1
36
May 11, 2023
Tapered Reamer
Tools
$0.00
1
35
May 11, 2023
Y-Tail Post Assembly
Y-Tail
14
$0.00
4
34
May 09, 2023
Two Sonex builds in one Workshop
Workshop
2
$0.00
1
33
May 09, 2023
Mixer Assembly
Controls
2
$0.00
1
32
May 05, 2023
Installed pulley's on lower cross tie
Fuselage
05
$0.00
1
31
May 03, 2023
Fast build wings arrive
Wings
$0.00
2
30
May 02, 2023
Southern Indiana Sonex Builders Factory
Workshop
2
$0.00
1
29
May 02, 2023
Removed 38 temporary rivets
Fuselage
2
$0.00
1
28
Apr 30, 2023
Parts in storage
Fuselage
$0.00
1
27
Apr 30, 2023
Fast Build Kit Arrives in Columbus
Fuselage
$0.00
5
26
Mar 29, 2023
Engine arrives from Australia
Engine
$0.00
3
25
Dec 30, 2022
Southern Indiana Sonex Builders Club
Research
$0.00
1
24
Nov 18, 2022
Jabiru Engine Class
Engine
16
$0.00
1
23
Oct 07, 2022
Stabilators Completed
Y-Tail
25
$0.00
1
22
Oct 06, 2022
Right Stabilator - almost complete
Y-Tail
25
$0.00
1
21
Oct 06, 2022
Skinning the stabilator
Y-Tail
$0.00
1
20
Oct 05, 2022
Stabilator Construction
Y-Tail
$0.00
1
19
Sep 06, 2022
Piano Hinge template
Tools
$0.00
1
18
Sep 03, 2022
Stabalator Sub-assembly
Y-Tail
$0.00
2
17
Sep 02, 2022
Assembling the Stabilator
Y-Tail
$0.00
2
16
Sep 02, 2022
Ruddervators Complete
Y-Tail
12
$0.00
1
15
Aug 30, 2022
Assembling the Rubbervator
Y-Tail
$0.00
2
14
Aug 29, 2022
Finishing the Hockey Stick
Y-Tail
2
$0.00
1
13
Aug 25, 2022
Learning from the experts
Research
$0.00
1
12
Aug 22, 2022
Prince P-Tip propeller ordered
Propeller
$0.00
0
11
Aug 22, 2022
Y-Tail kit arrives
Y-Tail
$0.00
1
10
Aug 06, 2022
Wing Stands
Tools
4
$0.00
2
9
Jul 30, 2022
N67WX
Research
$0.00
0
8
Jul 29, 2022
Tail Kit - ready to ship from the factory
Research
$0.00
3
7
Jul 21, 2022
N Number
Research
$0.00
1
6
Jul 04, 2022
Refining the schematic
Electrical
$0.00
0
5
Jul 04, 2022
More Decisions
Instrument Panel
2
$0.00
0
4
Jun 22, 2022
Sample Panel Layouts
Instrument Panel
6
$0.00
0
3
Jun 22, 2022
Working on Schematic
Electrical
6
$0.00
0
2
Jun 01, 2022
Electrical Schematic
Electrical
6
$0.00
0
1
Apr 26, 2022
Trip to the Factory
Research
6
$0.00
1
------------
--------------
-------------
Totals
664
$0.00
322
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.